CM-10-07-148rev. 1/10
Contract Quantity Adjustment/Change Order
Department: Transportation Administration
Project Traffic Signal -- GATTIS SCHOOL - RR RANCH
Name: BLVD & AW GRIMES - LOGAN DIRVE
City Project
ID Number:
Justification
Page 1 of 3
Date:
Change Order/Quantity Adjustment
No.
6/4/2010
2
Actual conditions in field were different than plan drawings which creates contract quantity differences.
SUMMARY
Original Contract Price:
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Original Contract Price Plus Change Order(s) Plus
Quantity Adjustment(s):
Original Contract Time:
Contract Time Prior to this Change Order:
Contract Time with All Approved Change Orders:
Signatures and Approvals
Prepared by: (_
Signature
Appro
City Staff
Approval:
City Official
Approval:
Signature
P)4,
Amount
$366,789.10
$366,789.10
0/0 Change
$2,200.00 0.60%
$4,982.00 1.36%
$7,182.00 1..96%
$0.00
$0.00
$373,971.10
Collette Phillips, Asst Controller, Austin Traffic Signal 6/4/2010
Printed Name, Title and Company Date
Ed Schroeder, VP Austin Traffic Signal Const. Co. LP 6/4/2010
Printed Name, Title and Company Date
,11 �-�.1/ t (n 7-610
3clivesPrintfa.eed Name and Titlesrr✓�^�
CZAJ
na and Title �y�u� Date
relL 01/10
Contract Quantity Adjustment/Change Order
Change Order Data
Page 2 of 3
Bid Item#
Item Description and Change
Unit
Qty.
Unit Price
Amount
Contract Time
Adjustment
(Days)
LGR-0001
LGR-0002
LGR-0003
CURB AND GUTTER REMOVAL
SIDEWALK REMOVAL
CURB AND GUTTER REPLACEMENT
LF
SF
LF
33
$21.00
$693.00
64
$17.00
$1,088.00
33
$97.00
$3,201.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
TOTALS:
$4,982.00
0
rev. 01/10
Contract Quantity Adjustment/Change Order
Page 3 of 3
TOTALS:
$0.00
0
Bid Item#
Item Description and Change
Unit
Qty.
Unit Price
Amount
Contract Time
Adjustment
(Days)
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
o
$o.00
$0.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$0.00
$0.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$0.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$0.00
$o.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$0.00
$o.00
o
$o.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
0
$0.00
$0.00
TOTALS:
$0.00
0
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY
Item Caption:
Approval Date:
City Manager Approval Summary Sheet
Consider executing Quantity Adjustment/Change Order No. 2 with Austin Traffic Signal
Construction Co. for the traffic signal improvements at the intersections of Gattis School
Road at Round Rock Ranch Boulevard and A.W. Grimes at Logan Drive
July 16, 2010
Department: Infrastructure Development & Construction Management
Project Manager: Bill Stablein
Item Summary:
During the course of construction, existing field conditions necessitated curb and gutter removal and replacement,
and sidewalk removal that differed from the plan drawings and plan quantities. Quantity Adjustment/Change Order
No. 2 adjusts for these needed quantity increases.
Goal No. 26.0: Construct major element of the transportation and mobility system as
Strategic Plan Relevance: approved by Council in the Master Transportation Plan.
Cost: $4,982.00
Source of Funds: 4B — Round Rock Development Corporation Construction
REV. 6/10/10