CM-10-09-187ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
Item Caption:
Approval Date:
Department:
City Manager Approval Summary Sheet
Requesting approval of Change Order #1 Mario L. Carlin Management, LLC agreement
September 24, 2010
Finance / CDBG
Project Manager:
Elizabeth Alvarado
Item Summary:
REQUESTING APPROVAL OF CHANGE ORDER #1 IN THE AMOUNT OF $1,025.00 FOR HOME REPAIR AT 1501 EAST MESA DRIVE. THE
AGREEMENT BETWEEN THE CITY OF ROUND ROCK AND MARIO L. CARLIN MANAGEMENT, LLC. WAS APPROVED IN THE AMOUNT OF
$22,661.10 ON SEPTEMBER 10, 2010. CHANGE ORDER IS FOR INSULATION BEHIND THE SIDING ON THE LEFT SIDE OF THE HOUSE AN D
FOR THE REPLACEMENT OF THE PRESSURE TREATED BOTTOM PLATE ON BOTH SIDES OF THE HOUSE.
Strategic Plan Relevance: N/A
Cost: $1,025.00
Source of Funds: CDBG-R HUD GRANT ENTITLEMENT FUNDS
REV. 6/10/10
Construction Change Order
Department: Community Development Page: 1 of 09/20/101
Program: Home Repair Program Date:
Change Order No. 1
Location: 1501 East Mesa Park Drive Original Contract: 22,661
Homeowner: Eva Valdez
Original Contract Price:
This Change Order
Change Orders to Date:
Maximum Change Order Allowed $ amount
Balance available
$22,661.10
$1,025.00
$0.00
$5,665.27
$5,665.27
Change Data
Justification:
Item #
( - )or
(+)
Description of Changes
Unit
QTY
Unit Price
Amount
Days +/-
1
(+)
install insulation behind siding on left
side where garage used to be and
replace some of the existing insulation
behind siding on left side due to
rot.(20x10)
EA
1
$800.00
$800.00
1
(+)
replace pressure treated bottom plate
on both sides 2x4 board (existing board
is rotted)
EA
1
$225.00
$225.00
$1,025.00
0
aitet ATM aZO
Project Ma ger
/14 P A a
Gly Contractor
Mar i0 1. Carl;? Wia,mgc l LV .
By:
Title
R.
Date
Homeowner
Sao—i0
Date
Homeowner Date
ow-iO:olkies7
Percent of Original Contract Price
Maximum % allowed
This Change Order
Total % Change
Contract + Change Orders:
Approved:
Title
Date
4-i cD • ��.
25.00%
4.52%
4.52%
$23,686.10
CDBG Forth 112009
9/20/2010