Loading...
CM-10-09-187ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: Department: City Manager Approval Summary Sheet Requesting approval of Change Order #1 Mario L. Carlin Management, LLC agreement September 24, 2010 Finance / CDBG Project Manager: Elizabeth Alvarado Item Summary: REQUESTING APPROVAL OF CHANGE ORDER #1 IN THE AMOUNT OF $1,025.00 FOR HOME REPAIR AT 1501 EAST MESA DRIVE. THE AGREEMENT BETWEEN THE CITY OF ROUND ROCK AND MARIO L. CARLIN MANAGEMENT, LLC. WAS APPROVED IN THE AMOUNT OF $22,661.10 ON SEPTEMBER 10, 2010. CHANGE ORDER IS FOR INSULATION BEHIND THE SIDING ON THE LEFT SIDE OF THE HOUSE AN D FOR THE REPLACEMENT OF THE PRESSURE TREATED BOTTOM PLATE ON BOTH SIDES OF THE HOUSE. Strategic Plan Relevance: N/A Cost: $1,025.00 Source of Funds: CDBG-R HUD GRANT ENTITLEMENT FUNDS REV. 6/10/10 Construction Change Order Department: Community Development Page: 1 of 09/20/101 Program: Home Repair Program Date: Change Order No. 1 Location: 1501 East Mesa Park Drive Original Contract: 22,661 Homeowner: Eva Valdez Original Contract Price: This Change Order Change Orders to Date: Maximum Change Order Allowed $ amount Balance available $22,661.10 $1,025.00 $0.00 $5,665.27 $5,665.27 Change Data Justification: Item # ( - )or (+) Description of Changes Unit QTY Unit Price Amount Days +/- 1 (+) install insulation behind siding on left side where garage used to be and replace some of the existing insulation behind siding on left side due to rot.(20x10) EA 1 $800.00 $800.00 1 (+) replace pressure treated bottom plate on both sides 2x4 board (existing board is rotted) EA 1 $225.00 $225.00 $1,025.00 0 aitet ATM aZO Project Ma ger /14 P A a Gly Contractor Mar i0 1. Carl;? Wia,mgc l LV . By: Title R. Date Homeowner Sao—i0 Date Homeowner Date ow-iO:olkies7 Percent of Original Contract Price Maximum % allowed This Change Order Total % Change Contract + Change Orders: Approved: Title Date 4-i cD • ��. 25.00% 4.52% 4.52% $23,686.10 CDBG Forth 112009 9/20/2010