CM-10-10-191ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
City Manager Approval Summary Sheet
Consider executing Quantity Adjustment/Change Order No. 3 with Austin Traffic Signal
Construction Co. for the traffic signal improvements at the intersections of Gattis School
Item Caption: Road at Round Rock Ranch Boulevard and A. W. Grimes at Logan Drive.
Approval Date: October 1, 2010
Department: Infrastructure Development & Construction Management
Project Manager: Bill Stablein
Item Summary:
Actual field conditions allowed the City to deviate from the plan drawings and to remove one ped pole and one curb
ramp, and to increase the amount of concrete sidewalk to complete this job.
Amount % Change
Original Contract $366,789.10 N/A
Previous Quantity Adjustments $0.00 N/A
Quantity Adjustment No. 3 $6,644.00 N/A
Previous Change Orders $7,182.00 1.96%
Change Order No. 3 $0.00 0.00%
Revised Contract Total $380,615.10 1.96%
Strategic Plan Relevance:
Goal 26.0: Construct major element of the transportation and mobility system as approved by Council in the
Master Transportation Plan.
Cost: $6,664
Source of Funds: 4B — Round Rock Development Corporation Construction
REV. 6/10/10
rev. 1/10
Contract Quantity Adjustment/Change Order
Department: Transportation Administration
Project Traffic Signal -- GATTIS SCHOOL - RR RANCH
Name: BLVD & AW GRIMES - LOGAN DIRVE
City Project
ID Number:
Justification
Date:
Page 1 of 3
9/20/2010
Change Order/Quantity Adjustment
No. 13
SUMMARY
Original Contract Price:
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Original Contract Price Plus Change Order(s) Plus
Quantity Adjustment(s):
Original Contract Time:
Contract Time Prior to this Change Order:
Contract Time with All Approved Change Orders:
Prepared by: Cfi(_—(6 ,
Signature
Contractor
Approval:
City Staff ea
Approval:
City Official
Approval:
Signatures and Approvals
Signature
Amount
$366,789.10
$366,789.10
% Change
$7,182.00 1.96%
$0.00 0.00%
$7,182.00 1.96%
$6,644.00
$6,644.00
$380,615.10
Collette Phillips, Ast Cntrlr, Austin Traffic Signal 9/20/2010
Printed Name, The and Company Date
- Ed Schroeder, Vice -Pres, Austin Traffic Signal 9/20/2010
Printed Name, Title and Company Date
SVtk E �. `l ;21-16
Printed Name and Title Date
tames? Ni. ?E.Li3 Many -
Printed Nameland Tltle
10-1-10
Date
rev. 01/10
Contract Quantity Adjusbnent/Change Order
Chance Order Data
Page 2 of 3
Bid Item#
Item Description and Change
Unit
Qty.
Unit Price
Amount
Contract Time
Adjustment
(Days)
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$o.00
0
$0.00
$o.00
o
$0.00
$0.00
o
$0.00
$0.00
o
$0.00
$0.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
0
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$0.00
o
$0.00
$0.00
o
$0.00
$0.00
o
$o.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$0.00
o
$0.00
$0.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$0.00
o
$o.00
$0.o0
TOTALS:
$0.00
0
mt. 01/10
Contract Quantity Adjustment/Change Order
uantity Adiustment Data
Page 3 of 3
TOTALS:
$6,644.00
Bid Item#
Item Description and Change
Unit
Qty.
Unit Price
Amount
Contract Time
Adjustment
(Days)
07-0618
11-0620
71-0631
72-0531
73-0618
119-0687
RR03-0684
COND (PVC SCH 40) 2 IN
ELC (NO 6) INSULATED
CURB RAMP (TY 1)
CONC SIDEWALK (4 IN)
COND (PVC SCH 40) 2 IN
PED POLE ASSMBLY
ADD COND (NO2) INSUL
LF
LF
EA
SY
LF
EA
LF
10
$12.00
$120.00
340
$3.00
$1,020.00
-1
$2,000.00
-$2,000.00
52
$170.00
$8,840.00
107
$12.00
$1,284.00
-1
$1,900.00
-$1,900.00
-360
$2.00
-$720.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
TOTALS:
$6,644.00