Loading...
CM-10-10-191ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 3 with Austin Traffic Signal Construction Co. for the traffic signal improvements at the intersections of Gattis School Item Caption: Road at Round Rock Ranch Boulevard and A. W. Grimes at Logan Drive. Approval Date: October 1, 2010 Department: Infrastructure Development & Construction Management Project Manager: Bill Stablein Item Summary: Actual field conditions allowed the City to deviate from the plan drawings and to remove one ped pole and one curb ramp, and to increase the amount of concrete sidewalk to complete this job. Amount % Change Original Contract $366,789.10 N/A Previous Quantity Adjustments $0.00 N/A Quantity Adjustment No. 3 $6,644.00 N/A Previous Change Orders $7,182.00 1.96% Change Order No. 3 $0.00 0.00% Revised Contract Total $380,615.10 1.96% Strategic Plan Relevance: Goal 26.0: Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan. Cost: $6,664 Source of Funds: 4B — Round Rock Development Corporation Construction REV. 6/10/10 rev. 1/10 Contract Quantity Adjustment/Change Order Department: Transportation Administration Project Traffic Signal -- GATTIS SCHOOL - RR RANCH Name: BLVD & AW GRIMES - LOGAN DIRVE City Project ID Number: Justification Date: Page 1 of 3 9/20/2010 Change Order/Quantity Adjustment No. 13 SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Cfi(_—(6 , Signature Contractor Approval: City Staff ea Approval: City Official Approval: Signatures and Approvals Signature Amount $366,789.10 $366,789.10 % Change $7,182.00 1.96% $0.00 0.00% $7,182.00 1.96% $6,644.00 $6,644.00 $380,615.10 Collette Phillips, Ast Cntrlr, Austin Traffic Signal 9/20/2010 Printed Name, The and Company Date - Ed Schroeder, Vice -Pres, Austin Traffic Signal 9/20/2010 Printed Name, Title and Company Date SVtk E �. `l ;21-16 Printed Name and Title Date tames? Ni. ?E.Li3 Many - Printed Nameland Tltle 10-1-10 Date rev. 01/10 Contract Quantity Adjusbnent/Change Order Chance Order Data Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $o.00 0 $0.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 0 $0.00 $o.00 o $0.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $0.00 o $0.00 $0.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $0.00 o $o.00 $0.o0 TOTALS: $0.00 0 mt. 01/10 Contract Quantity Adjustment/Change Order uantity Adiustment Data Page 3 of 3 TOTALS: $6,644.00 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 07-0618 11-0620 71-0631 72-0531 73-0618 119-0687 RR03-0684 COND (PVC SCH 40) 2 IN ELC (NO 6) INSULATED CURB RAMP (TY 1) CONC SIDEWALK (4 IN) COND (PVC SCH 40) 2 IN PED POLE ASSMBLY ADD COND (NO2) INSUL LF LF EA SY LF EA LF 10 $12.00 $120.00 340 $3.00 $1,020.00 -1 $2,000.00 -$2,000.00 52 $170.00 $8,840.00 107 $12.00 $1,284.00 -1 $1,900.00 -$1,900.00 -360 $2.00 -$720.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $6,644.00