Loading...
CM-10-10-195ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: City Manager Approval Summary Sheet Requesting approval of Change Order #2 Mario L. Carlin Management, LLC agreement October 1, 2010 Department: Finance / CDBG Project Manager: Elizabeth Alvarado Item Summary: REQUESTING APPROVAL OF CHANGE ORDER #2 IN THE AMOUNT OF $2,325.00 FOR HOME REPAIR AT 1501 EAST MESA DRIVE. THE AGREEMENT BETWEEN THE CITY OF ROUND ROCK AND MARIO L. CARLIN MANAGEMENT, LLC. WAS APPROVED IN THE AMOUNT OF $22,661.10 ON SEPTEMBER 10, 2010. CHANGE ORDER #2 IS FOR 1) THE DEMO OF WALL IN MASTER BATH 16" INTO MASTER BEDROOM TO INCLUDE PAINT, SHEETROCK, TAPE AND TEXTURE 2) REMOVE & RE -INSTALL CABINETS 3) INSTALLATION OF EXTRA FLOORING IN MASTER BATH AND RESTRETCH OF CARPET IN MASTER BEDROOM. TH E PROPOSED WORK WAS INSPECTED AND REVIEWED BY CITY INSPECTOR. Strategic Plan Relevance: N/A Cost: $2,325.00 Source of Funds: CDBG-R HUD GRANT ENTITLEMENT FUNDS REV. 6/10/10 Construction Change Order Department: Community Development Page: 1 of 1 Program: Home Repair Program Date: Change Order No. Location: 1501 East Mesa Park Drive Original Contract: Homeowner: Eva Valdez Original Contract Price: This Change Order Change Orders to Date: Maximum Change Order Allowed $ amount Balance available $22,661.10 $2,325.00 $1,025.00 $5,665.27 $4,640.27 Change Data Justification: 09/28/10 2 22,661 42 L 2 �C e, i n s pec+ec1 d- c p prov-ed LAOfK. Item # ( - )or (+) Description of Changes Unit QTY Unit Price Amount Days +/- New (+) Demo Wall in Master Bath 16" into master bedroom. Includes paint, sheetrock, tape and texture. EA 1 $1,575.00 $1,575.00 11 (+) Install extra flooring and re -stretch carpet after wall demo. EA 1 $450.00 $450.00 New (+) Remove & reinstall the cabinets inorder to move the left side of the wall. EA 1 $300.00 $300.00 $2,325.00 0 -Vsa, a_04,17v1 a ctO Project - nager By: Title dt-/4": Contractor c. an- /0 Date 9 n:10 meowner Date to -HO ktosmextRer Date -lames [2, Huse,?.E.-C!i-lx,( Mano R.. MI -LD -1D-196- 1 of 1 Percent of Original Contract Price Maximum % allowed This Change Order Total % Change Contract + Change Orders: 25.00% 10.26% 10.26% $26,011.10 Approved: Title \ aMeSR, taut P.E— 1`Ra ctif(' Date ID_I-in CDBG Form 1/2009 9/28/2010