Item Caption:
Approval Date:
City Manager Approval Summary Sheet
Requesting approval of Change Order #2 Mario L. Carlin Management, LLC agreement
October 1, 2010
Department: Finance / CDBG
Project Manager: Elizabeth Alvarado
Item Summary:
REQUESTING APPROVAL OF CHANGE ORDER #2 IN THE AMOUNT OF $2,325.00 FOR HOME REPAIR AT 1501 EAST
MESA DRIVE. THE AGREEMENT BETWEEN THE CITY OF ROUND ROCK AND MARIO L. CARLIN MANAGEMENT, LLC.
WAS APPROVED IN THE AMOUNT OF $22,661.10 ON SEPTEMBER 10, 2010. CHANGE ORDER #2 IS FOR 1) THE DEMO
OF WALL IN MASTER BATH 16" INTO MASTER BEDROOM TO INCLUDE PAINT, SHEETROCK, TAPE AND TEXTURE 2)
REMOVE & RE -INSTALL CABINETS 3) INSTALLATION OF EXTRA FLOORING IN MASTER BATH AND RESTRETCH OF
CARPET IN MASTER BEDROOM. TH E PROPOSED WORK WAS INSPECTED AND REVIEWED BY CITY INSPECTOR.
Strategic Plan Relevance: N/A
Cost: $2,325.00
Source of Funds: CDBG-R HUD GRANT ENTITLEMENT FUNDS
REV. 6/10/10
Construction Change Order
Department: Community Development Page: 1 of 1
Program: Home Repair Program Date:
Change Order No.
Location: 1501 East Mesa Park Drive Original Contract:
Homeowner: Eva Valdez
Original Contract Price:
This Change Order
Change Orders to Date:
Maximum Change Order Allowed $ amount
Balance available
$22,661.10
$2,325.00
$1,025.00
$5,665.27
$4,640.27
Change Data
Justification:
09/28/10
2
22,661
42 L 2 �C e,
i n s pec+ec1 d- c p prov-ed
LAOfK.
Item #
( - )or
(+)
Description of Changes
Unit
QTY
Unit Price
Amount
Days +/-
New
(+)
Demo Wall in Master Bath 16" into
master bedroom. Includes paint,
sheetrock, tape and texture.
EA
1
$1,575.00
$1,575.00
11
(+)
Install extra flooring and re -stretch
carpet after wall demo.
EA
1
$450.00
$450.00
New
(+)
Remove & reinstall the cabinets inorder
to move the left side of the wall.
EA
1
$300.00
$300.00
$2,325.00
0
-Vsa,
a_04,17v1 a ctO
Project - nager
By:
Title
dt-/4":
Contractor
c. an- /0
Date
9 n:10
meowner Date
to -HO
ktosmextRer Date
-lames [2, Huse,?.E.-C!i-lx,( Mano R..
MI -LD -1D-196-
1 of 1
Percent of Original Contract Price
Maximum % allowed
This Change Order
Total % Change
Contract + Change Orders:
25.00%
10.26%
10.26%
$26,011.10
Approved:
Title \ aMeSR, taut P.E— 1`Ra ctif('
Date ID_I-in
CDBG Form 1/2009