Loading...
CM-10-10-200ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: City Manager Approval Summary Sheet Requesting approval of Change Order #1 Mario L. Carlin Management, LLC agreement October 8, 2010 Department: Finance / CDBG Project Manager: Elizabeth Alvarado Item Summary: REQUESTING APPROVAL OF CHANGE ORDER #1 IN THE AMOUNT OF $2,475.00 FOR HOME REPAIR AT 1410 CIRCLE DRIVE. THE AGREEMENT BETWEEN THE CITY OF ROUND ROCK AND MARIO L. CARLIN MANAGEMENT, LLC. WAS APPROVED IN THE AMOUNT OF $24,990.00 ON SEPTEMBER 10, 2010. CHANGE ORDER #1 IS FOR UNFORESEEN CIRCUMSTANCES ASSOCIATED WITH ITEM #13 IN THE WORK WRITE UP. CHANGE ORDER CONSISTS OF 1) REMOVE AND REPLACE ALL WATER DAMAGED SHEET ROCK, WOOD AND INSULATION; 2) REMOVE AND REPLACE DRAIN LINE, CABINET/COUNTERTOP, SINK & TOILET; 3) SAW EXISTING CONCRETE FLOOR AND POUR NEW CONCRETE FLOOR. CITY INSPECTOR REVIEWED CHANGE ORDER AND PERFORMED AN INSPECTION AT THIS RESIDENCE ON 09/29/2010. Strategic Plan Relevance: N/A Cost: $2,475.00 Source of Funds: CDBG-R HUD GRANT ENTITLEMENT FUNDS REV. 6/10/10 Construction Change Order Department: Community Development Program: Home Repair Program Location: 1410 Circle Drive Homeowner: Raquel Araiza Original Contract Price: This Change Order Change Orders to Date: Maximum Change Order Allowed $ amount Balance available $24,990.00 $2,475.00 $0.00 $6,247.50 $6,247.50 Change Data Page: Date: Change Order No. Original Contract: Justification: 1 of 1 09/29/30 1 24,990 This is an unforeseen circumstance. City Inspector Darrel Hall reviewed change order and performed an inspection at 1410 Circle Drive and confirmed that this work is needed to complete item #13 in work write up. Item # ( - )or (+) Description of Changes Unit QTY Unit Price Amount Days +/- 13 (+) Remove all water damage sheet rock & replace with new wood, sheet rock & insulation; EA 1 $775.00 $775.00 13 (+) Remove lines, sink, cabinet/countertop & toilet EA 1 $725.00 $725.00 13 (+) Saw concrete floor EA 1 $375.00 $375.00 13 (+) Install new drain line EA 1 $250.00 $250.00 13 (+) Pour back new concrete floor EA 1 $350.00 $350.00 $2,475.00 0 Project Manager Ci-eL4 t dzo 2A /. /[ By: Title 9/30/2010 Date Contractor Mario Carlin Management, LLC wner er Hom eiwic-i 0-200 1 of 1 0i 9/30/2010 •- s Date Da e Percent of Original Contract Price Maximum % allowed This Change Order Total % Change Contract + Change Orders: Approved: Title Ja Date 25.00% 9.90% 9.90% $27,465.00 R. Nuse, P. .,City Manager g-io CDBG Form 1/2009 9/29/2010