CM-10-10-211ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 2 with Waeltz & Prete, Inc. for the Red Bud Lane Phase IV Project. October 22, 2010 Department: Infrastructure Development & Construction Management Project Manager: Lance Shellenberger Item Summary: Supplemental Contract No. 2 with Waeltz and Prete, Inc. is needed for additional work including meetings with residents, design modifications, and coordinating with the contractor on change orders. Strategic Plan Relevance: Goal 26.0: Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan. Goal 29.0: Provide for effective management of storm water. Cost: $4,591.05 Source of Funds: Round Rock Transportation Development Corporation Construction REV. 6/10/10 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WAELTZ & PRETE, INC. ("Engineer") ADDRESS: 3000 Joe DiMagg o, Suite 72, Round Rock, TX 78665 PROJECT: Red Bud Lane Phase IV This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Waeltz & Prete, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of April, 2009 for the Red Bud Lane Phase IV Project in the amount of $99,681.51; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 1 on February 19, 2010 to amend the scope of services and to increase the compensation by $7,183.41 to a total of $106,864.92; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $4,591.05 to a total of $111,455.97; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit 13, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $4,591.05 the lump sum amount payable under the Contract for a total of $111,455.97, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199-7099; 204875 0-t0 -20 Rev.12/01/08 84275 Date /D////c) CITY OF ROUND ROCK By: 10-22-10 Date Supplemental Contract 0199-7099; 204875 JamesV.tu:e,P:E. Pi�Ma+laotR_, 2 APP ED A Stephan . Sheets, City Attorney Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services 1. Meetings with Property Owners and City of Round Rock Staff Met with property owners of properties at northeast and southeast corners of Red Bud Lane and Evergreen Drive on three (3) separate occasions. Met with City of Round Rock staff four (4) times to discuss options for retaining wall/masonry fence options along east side of Red Bud Lane. 2. Additional Design The original Scope of Services anticipated the use of the 6 foot masonry fence to retain soil along the east side of Red Bud Lane. Property owner at southeast corner of Red Bud Lane and Evergreen Drive requested a different type of rock fence. Additional design services included the design of an 8 foot masonry fence, 385 s.f of modular block retaining wall and 222 1.f. of mortared rock retaining wall. The design of these retaining wall systems was not anticipated in the original Scope of Services. 3, Coordination of Pricing with Contractor and Preparation of Change Order #2 Included in original scope under Construction Phase Services. ADDENDUM TO EXHIBIT C Work Schedule The Contract time by this Supplemental Agreement will be unchanged (currently December 31, 2010). ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: (Attached Behind This Page) a 0 0 0) ct. LL1 Ct. Task Description O O O O O O O O 0 O (0 76 c C O c. O G) c in 2) E co 4-. o N y To o° v v Q c N 6 2 Q d O O 05 ft d d N Total Hours O O CO 69 0 O CO 69- O 0 a O O a O O O a Direct Labor Cost Engineering Services Fee: 0 0 0 .1.9. LL Tot Iab+OH Direct Labor CO 141 ti N r - to O M_ 69- co i O O V) O N O CO - O 03 O O (f) - Cr; CNa 0 0 N V) 0) 0) c 2 d c 0) .WS 0 To O v N 0 d rn L0 49. Total Supplemental Engineering TOTAL FEE FOR SUPPLEMENTAL SERVICES