Loading...
CM-10-11-229ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. City Manager Approval Summary Sheet Consider executing Supplemental Contract No.1 with Page Southerland Page, LLP for the Main Street Infrastructure Improvements between San Saba street and Blair street - Item Caption: Implementation based on Southwest Downtown Master Plan. Approval Date: November 12, 2010 Department: Infrastructure Development & Construction Management Project Manager: Todd Keltgen Item Summary: Required response to Texas Commission on Environmental Quality (TCEQ) Edwards Aquifer Protection Plan (EAPP) comments went beyond the Main Street project at hand to require that all existing and proposed impervious cover be revisited for the entire Southwest Downtown Water Pollution Abatement Plan (WPAP) prior permit area — not just the project area. TCEQ has a time frame in which a response to their comments must be received or the application is denied. Therefore time was of the essence and the required response required additional time to complete the TCEQ WPAP permit modifications task. This is additional services on an existing project with no changes to the Contract, or schedule, just the amount. This task has been completed and TCEQ approved the WPAP permit modifications. Additional time to complete the City Contract forms for the additional services change for Addendum 1. Strategic Plan Relevance: 26.0 Construct major elements of the transportation and mobility system as approved by Council in the Master Transportation Plan Cost: $4552.86 Source of Funds: RR Transportation Development Corporation Construction REV. 6/10/10 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, LLP ("Engineer") ADDRESS: 400 W. Cesar Chavez, Suite 500, Austin, Texas 78701 PROJECT: Main Street Infrastructure Improvements between San Saba Street and Blair Street — Implementation based on Southwest Downtown Master Plan This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, LLP hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of August, 2009 for the Main Street Infrastructure Improvements between San Saba Street and Blair Street -- Implementation based on Southwest Downtown Master Plan Project in the amount of $374,699.95; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $4,552.86 to a total of $379,252.81; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 11. Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $4,552.86 the lump sum amount payable under the Contract for a total of $379,252.81, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rcv.12/01108 0199.7121; 00206824.doc 84275 STO7DTST A114-ioai-22, 1 PAGE SOUTIIERLAND PAGE, LLP ---� Date CITY OF ROUND ROCK By: 0117.1,0 Date Page Southerlend Page, LL . By: PSP Architect - Engineers, Ir1c. fts: Its: Principal APP O ED AS T I FORM: a.MB6 R.NIuse, Pe. Steph L. Sheets, City Attorney CzrY M 44 z Supplemental Contract 0199.7121; 00206824.doc STO7DTST 2 Rev.12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: 1) Addendum No. 1: Required response to TCEQ EAPP comments went beyond the Main Street project at hand to require that all existing and proposed impervious cover be revisited for the entire SWDT WPAP prior permit area — not just the project area. TCEQ has a time frame in which a response to their comments must be received or the application is denied. Therefore time was of the essence and the required response required additional time to complete the TCEQ WPAP permit modifications task. This is additional services on an existing project with no changes to the Contract, or schedule, just the amount. This task has been completed and TCEQ approved the WPAP permit modifications. 2) Additional time to complete the City Contract forms for the additional services change for Addendum 1. ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: Work has been completed on this Addendum No. 1 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page EXHIBIT D City of Round Rock Project Name.. .. Sheet 1 of 4 LABOR COSTS BY FUNCTION CODE : F.C. 110 ROUTE AND DESIGN STUDIES F.C. 120 ENVIRONMENTAL STUDIES F.C. 130 RIGHT OF WAY PLANS F.C. 150 -..FIELD SURVEYS / MAPPING F.C. 160 ROADWAY DESIGN CONTROLS F.C. 1181. DRAINAGE F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION F.C. 163 MISCELLANEOUS (ROADWAY) F.C. 184 MANAGING CONTRACTED PROF. SERVICES F.C. 165 TRAFFIC MANAGEMENT SYSTEMS F.C. 170 BRIDGE DESIGN F.C. 190 PROJECT MANAGEMENT .. F.C. 191 SUPPORT SERVICES F.C. 310 CONSTRUCTION PROJECT SUPERVISION F.C. 320 CONSTRUCTION INSPECTION F.C. 330 CONSTRUCTION JOB CONTROL DIRECT COSTS: UNIT :DIRECT:'::' LABOR OVERHEAD 150.00% S 2.439.03 FIXED FEE 12.00% TOTAL COST .....:.:i RATE QUANTITY TOTAL Final Mylar Plots Reproduction Mileage Airline Flights Per Diem • Mali & Deliveries SF EA Mile EA Day EA TOTAL DIRECT COSTS TOTAL COST COMPANY NAME MANHOUR SUMMARY Sheet 2 of 4 Project Name City of Round Rock FC 110 ROUTE AND DESIGN STUDIES Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ FC 120 ENVIRONMENTAL STUDIES Manhours Rate Direct Labor Project Engineer 38 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 38 $ 1,626.02 1,626.02 FC 130 RIGHT OF WAY PLANS Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ Sub -total 0 $ FC 150 FIELD SURVEYS/MAPPING Manhours Rate Direct Labor Project Engineer 0 $42.79 $ Engineer 0 $35.10 $ Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $48.99 $ Sub -total 0 $ COMPANY NAME MANHOUR SUMMARY Sheet 3 of 4 Project Name City of Round Rock FC 160 ROADWAY DESIGN CONTROLS Manhours Rate Direct Labor Project Engineer 0 $46.00 $ Engineer 0 $46.00 $ Senior Civil Designer 0 $42.00 $ Civil Designer 0 $42.00 $ Junior Civil Designer 0 $38.00 $ Administrative Assistant 0 $34.00 $ Sub -total 0 $ FC 161 DRAINAGE Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer ill 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 162 SIGNING, MARKINGS AND SIGNALIZATION Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer! 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 163 MISCELLANEOUS (ROADWAY) Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 170 BRIDGE DESIGN Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ COMPANY NAME MANHOUR SUMMARY Sheet 4 of 4 Project Name City of Round Rock FC 164 MANAGING CONTRACTED PROF. SERVICES Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 165 TRAFFIC MANAGEMENT SYSTEMS Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Speen! 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 190 PROJECT MANAGEMENT Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 191 SUPPORT SERVICES Manhours Rate Direct Labor Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 310 CONSTRUCTION PROJECT SUPERVISION Manhours Rate Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech ill 0 $34.00 $ Sub -total 0 $ Direct Labor