Loading...
CM-2016-1006 - 1/8/2016imurm naa,re.wz Department: Project Name: Bradford Park Storm Repair Project City Project ID Number BRADF-550-CON Contract Quantity Adjustment/Change Order PARD Date: 12/15/15 Change Order/Quantity Adjustment No. 1 justification nstallation of concrete playground ramp not in the original scope to meet ADA requirements at Bradford Park. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Tme: WA._ Oty Project Mayor/City Submitted for Approval Printed Name, Title, Company Name, Title, Company Pagel of 3 KI 20 110 0.00 $1,683.24 0.01 $1,683.24 0.01 $117,169.00 $1,683.24 Date Date Contract Quantity Adjustment/Change Order MW NY MRif YAS m, O6/15 Project Name: Bradford Park Storm Repair Project Quart. Adj./Change Order No.: Chanqe Order Data Puec 1 ora Item Description Contract AdjustmentTime Page 3 of 3 Contract Quantity Adjustment/Change Order rer, Dans Project Name: Bradford Park Storm Repair Project Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Item Description ®��� • ♦� . M1Y RR�SS C0 N;C R Prel ; ((0 &TIRU 111;OWN_! 110 P.O. BOX 2928 WIMBERlE1, TEXAS 18616 512-847-8000 Wimberley 512-842-5000 Austin Metro 512-847-3831 Fax www.myersconcrete.com email: info@myersconcrete.com WBE/HUB Certified City of Round Rock Attn: Michael Chau mchau(i,roundrocktexas.eov 512-218-5547 December 15, 2015 Project: Bradford Park Changes CONTRACT Myers Concrete Construction, LP proposes to supply all labor and materials for the following work described: Addition at Bradford Park -Playground Entry Ramp 1 LS $1,683.24 1. All Grades +/- I O'h of a foot by others including base pad 2. Exclusions: Permits, Plumbing, Anchors, Embeds, Haul Off, Drain, Erosion Control, Sealing or Caulking of Joints, Electrical Work, Testing, Rock Excavation, Revegitation, Construction Entrance,\ and Utilities Not Clearly Marked. 3. Myers Concrete Construction, LP will provide Workers Compensation and General Liability Insurance. 4. Contract must be signed and returned prior to any commencement of work 5. Draws paid as work progresses and payment in full upon completion. 6. Total price for all work listed above $1,683.24 My Conc a Construction, LP City of Round By Randy yers, VAP of Myers Concrete, LLC, GP Date Date Rock 1ROCity of Round Rock xUN ROOK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Myers Concrete Construction, LP for the Bradford Park Storm Repair Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 1/8/2016 Dept Director: Rick Atkins, Director Cost: Indexes: Attachments: LAF - Quantity Adjustment -Change Order #1 w- Myers Concrete (00348546xA08F8).pdf, Bradford Park CO#1 151217 Scan.pdf Department: Parks and Recreation Department Text of Legislative File Consider executing Quantity Adjustment/Change Order No. 1 with Myers Concrete Construction, LP for the Bradford Park Storm Repair Project. This item will authorize the City to execute CO #1, which would include the installation of a playground entry ramp to the existing playground. Existing conditions of the playground do not meet ADA requirements, adding a playground entry ramp would satisfy ADA requirements. The project includes the removal of damaged trail and masonry work and replacement of trail and damaged amenities/furnishings during the storm. In 2015, the newly completed park was severely damaged in a flood situation. After processing the damage with our insurance provider we are able to repair the park and prevent future damage with the use of park development funds. Department official recommends approval of this item. City o/Round Rock Page 1 Printed on 1/7/2018