Loading...
CM-10-12-238ROUND ROCK; TEXAS PURPOSE. T' SSION. PROiPf Rtfl City Manager Approval Summary Sheet Consider executing a Change Order No. 4 with Flintco, Inc for the Intermodal Transit and Item Caption: Parking Facility project. Approval Date: 12/10/2010 Department: Infrastructure Development & Construction Management Project Manager: Thomas Item Summary: These changes were made due to the design and field conditions discovered during construction. Wire mesh added to topping slab, added embeds plates at second floor and changes to green screen connections to avoid cabling. Strategic Plan Relevance: Mobility and Connectivity Strategic Initiative 2060 Vision: Residents and visitors will have alternative choices for transportation including public transportation options, pedestrian/biking options and personal vehicle. Cost: $3,769.00 Source of Funds: 2002 General Obligation Bond and ARRA Funds rev. 09/10 Contract Quantity Adjustment/Change Order Department: Infrastructure Development & Construction Manages Prot Intermodal Transit and Parking Facility Name: City Project ID Number: PTO2ITPF Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 11/17/2010 1 Changes made due to design and field conditions discovered during construction. Wire mesh added to topping slab, added embeds plates at second floor and changed to green screen connections to avoid cabling. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract lime: Contract Time Prior to this Change Order: Contract lime with All Approved Change Orders: Amount $2,530,000.00 $0.00 $0.00 $0.00 $2,530,000.00 $0.00 $3,769.00 $3,769.00 0/0 Change $2,533,769.00 *4/8/2011 0.00% 0.15% 0.15% *4/8/2011 *4/8/2011 Prepared by: Contractor Approval: City Staff Approval: City Official Approval: Signature Art Arredondo, Barnes Gromatzky Kosarek Architects Printed Name, Me and Company Daniel Oates, Project Manager Flintco,Inc. Printed Name, Title and Company Lary Madsen, Construction Manager, CORR Printed Name and Title Date Date 3/►6 00 Date Cada ixs4tERs, cM - n ki & i irY thAN A6 ek ta.11040 Printed Name and Tile Date rev. 09/10 Contract Quantity Adjustment/Change Order Chan e Order Data Page 2 of 3 Bid Item# Rem Descri on and Chan e Added embeds plates second floor Added welded wire mesh fabric to topping slabs Change connection on green screen to avoid cabling Contract Time Adjustment Da 1,063.00 gravviatewt*og; $1 063.00 2,225.00 $2,225.00 $481.00 $481.00 TOTALS: 3 769.00 Proposed Change Order #10 City of Round Rock Intermodal Transit and Parking Facility City of Round Rock, TX Owner: The City of Round Rock Description: RFI 2- Added embeds along 4 line on the second floor A: Material & Equipment: B: Labor C: Subcontractors - See attached quotations Myrex Steel D. General Contractor Mark-Up ( 10%) F. Contract Time Extension 0 Calender Days Flin • Inc. B: ani `' sates - Proj ct Manager it -_S ( Date Signed 11 Sales Tax ( 0.00%) $ Subtotal A $ Labor Burden ( 44.00 %) $ Subtotal B $ $ Subtotal C $ hINI(O Constructive Solutions 966.00 966.00 Subtotal A - C $ 966.00 Subtotal D $ Asbestos Allowance Change Order 96.60 96.60 TOTAL: $ 1,063 The City of Round Rock B: Larry Madsen - Public Works Rep Date Signed Barnes, Gromatzky, Kosarek Architects B: Arturo Arredondo Date Signed 8100 Cross Park 1)r. I%INTCO Construetwie Solutions REQUEST FOR INFORMATION No. 00002 Phone: 512.891.7224 Malin, TX 78754-7224 Fax: 512.891.7229 TITLE: Structural Questions PROJECT: Round Rock Intermodal. Transit/Park TO: Attn: Art Arredondo, AlA Barnes Gromatzky K osarek A 1508 West 5th Street Suite 200 Austin, TX 78703 Phone: 512-476-7133 Fax: 512-478-2624 QUESTION: Plcasc advise on the following structural questions. DATE: 3/9/2010 JOB: 4399 STARTED: COMPLETED: REQUIRED: 3/18/2010 1. On S2.1 the columns along grid line H from grid line 3 to 6 and grid line, 9 to 12 are shown to only have part of the column sitting on the slab/grade beam. Detail 1/S4.0 shows these steel beams overhanging the slab/grade beam by 2". Please confirm if the steel beans do overhang the concrete 2" as shown in 1/S4.0. 2. The section cut 6A/S4.0 shows the grade beam to be on the right side of the pier cap. On S2.1 the are 3 locations along grid line H that refer to this section cut. The plans on S2.1 show the beam discontinuing or running through these areas. Please confirm which is correct. 3. On S3.2 the pier schedule shows a requirement of #4's Q 12" pitch. Please confirm the spiral can be 1/2" smooth bar. 4. Please provide reinforcement requirements for the wall on grid line 13.7 between G3 and G7. 5. There appear to be columns at each end of the concrete wall at grid line 13.7 between G3 and G7. Please verify this is corect and provide dimensions and reinforcement. 6. The architectural documents detail the barrier cable to be 1/4" stainless stceI while the structural documents detail it to be 1/2" galvanized strand. Plcasc confirm 1/2" galvanized strand is correct. 7. Detail 6/A8.4 shows the barrier cable run to be 13 cables. Details 7&9/S4.1 show runs of 10 and 17 cables and there is a note to reference architectural drawings for spacing. Reference attached detail SK -1 and verify if this will be acceptable. If not, please veiny the correct cable run details. 8. Reference attached drawing SK -2. Please confine the barrier cable is to be installed as shown on this drawing. Requested By:Flintco Inc. Date: 3/11/2010 Signed: Daniel Oates ligation 0 Pape 1012 To: Art arredondo Cc: Larry Swayze; Joc Luke Subject: Flintco RFI 002 Response Attachments: RFT 002 Structural Questions.pdf Art: Regarding RFI 002, our responses aro listed below. 1. The HSS tubes overhang the slab edge by 2"; refer to the Architectural wall sections. 2. This question precipitated the clarification details that are attached herein. 3. Confirmed. A 1/2" dia. smooth steel spiral may be used in lieu for in The Contract Documents. 4. Reinforcement for the wall on grid fine 13.7, between G-3 and o.c. horizontal and #4 @ 12" o.c. vertical, as noted in the elevator shaft walls. of the #4 spiral called G-7, shall be 114 @ 10: 5. The concrete columns at G-3 and 0-7 along grid line 13.7, al each end of the concrete shear wap, are 12' x 12" columns reinforced with 4 - #8 bars vertical with #3 square ties spaced at 10" o.c. to match the horizontal wall reinforcing spacing. 8. The Architectural Drawings only detail the stair and pedestrian guardrail conditions; therefore, the 1/4" dia. stainless steel cable is correct in that condition. The Structural Drawings detail the traffic barrier cables as 112" dia. galv. cables. Each Is correct in their respective use and location. 7. Agreed. The 3" spacing maximum controls as noted in the Architectural and Structural Drawings. SK -1 is not correct; spacing of the cables from the 42" height required should be 3" maximum and the bottom gap should be 3" or Tess, typical. 8. Refer to the attached details on RFI -002 S8 and RFI -002 S9 for the proper plan and detail regarding the concrete wall and barrier cable. Regards, 2. Refer to sketches RFI -002 S1 through S7. 8. SK -2 indicates vehicular barrier cables as shown on Structural Drawings, additional vehicular barrier cables are required as indicated on Architectural Drawings are as follows: a) At level 1 along Grid E from Grid 1 to Grid 13 and along Grid F from Grid 3 to gild 12. b) At level 2 in addition to those shown in Structural Drawings vehicular barrier cables are required along Grid 12 between Grids D to E. along Gid F between grids 3 to 4 at level 2 and the ramp to future level 3. c) Also at level 2 to level 3 ramp Architectural Drawings indicate a concrete barrier with cables above along Grid D between Grids 3 to 4 andlong Grid 4 be Grids D to F. Note Structural response above to item 8. Arturo Arredondo. AIA a 0 — ratMgo ail •NIA11 wir D 0 /4" l 6" GONG. WALL w/ GABLE RAIL- REF. 1l/S4.1 d ARGH'L I T_ sII i MOM • EDGE OF STRUGT 155'-6" /ISISLAB = 751'-3 I/4" TYP. ALONG &RID® FROM@ TO® 5.5 3 2.25" MID5PAN 53.1 OW 55' u 35" S• to Ell II 54.1 q' -D" D.G. � VERIFY w/ ARCHIL. EL. 751'-2 I/2"J 71 TYP. ALONG 4 FROM ®TO SLOPE UP 6.6q % '750'-O" VARIES 3 1/2" TO 14 V2" L 35" GABLE RAIL REF. ARGH'L. B-8 • T.O.G. 73q'-3" COL. BELOW T.O.G. 755'-0" O T LEVEL 2 FRAMING PLAN SCALE, I/8" = I' -O" TT ['):41: JOB NAME: CoRR Intermodal Transit & Parking Facility JOB No.: 09038 SCALE: 1/8"=1'-0" DATE 03/26/2010 ocrrovir P *� 9�* i LARRY M. SWAYZE e O L. 38354,/ '•. / fv. i. ItiliOtittuAtV6V-S," v3 y9tt REF.: S-2.2 NO.: RFI -002 S8 SALV. G3xb ® Q' --O" O.G. REF. ARCM - FOR GABLE SIZE i SPAGIN& 6ALV. PL t/2'x4 I/2"x4 1/2" I41 2-1/2"4fix 6" H.G.A. i3" O.G) 3#4 DONT. 10" O.G. HORIZ. #4x4'-0" ® 12" O.G. LI16 FOR FUTURE SLAB JOB NAME: CoRR Intermodal Transit & Parking Facility JOB NO.: 09038 SCALE: 3/4"=11"0" DATE: 03/26/2010 � * • . *gym LARRY M. SWAY7i€ foto 38354 49:d N4'OAL E f 11 8114 a®dk®0� REF.: 11/S-4.1 No.: RFI -002 S9 60)12En Industries Fabricators of Commercial and Industrial Steel City of Houston Certified #367 9119 Weedy Ln. Houston, TX 77093 (713) 691-5200 Main Fax (713) 691-3355 Sales Fax (713) 691.4646 *** CHANGE ORDER REQUEST *** DATE OF CHANGE ORDER September 10, 2010 MYREX JOB NO. 9954 MYREX CHANGE NO. 02 CUSTOMER CHANGE ORDER OR RFI NO. RFI 002 PROJECT City of Round Rock Parking Garage CONTRACTOR NAME FLINTCO, INC. PROJECT MANAGER Daniel Oates JOB SITE PHONE JOB SITE FAX PLEASE PROCESS A CHANGE ORDER TO OUR PURCHASE ORDER FOR THE EXTRA WORK DESCRIBED BELOW: Add Embed plates and channolls Galvanized Materials Material Amount 75.00; Fabrication Manhours1. 4.00; Hourly Rate 45.D0; Fabrication Labor 180.001 Detailing Manhours 1 2.00 Hourly Rate' 45.00: Detailing Time I 90.00 Freight l 39000: ITEM DESCRIPTIONS AND AMOUNTS: Galvanizing. Miscellaneous, Buyouts, etc. galv and fgt. i 10 0 See Page 2 for Grand Total Charm: II 9954-07 pate Prreed 9014I2010 Pogo 1 or: NOTES Subtotal from Page 1 r-ET4-FrCI; r701-16.! Overhead I 84 001 Pmfit I 42.001 Erection Erection Overhead/Profit r-7-7-7-67, CHANGE TOTALS Change Amount JT Tax Amount 0.00i 1 GRAND TOTAL 1 966.001 The status Of this Change Order is UnapploVed Approved = Myrex has received format Change Order. Unapproved = Myrex has been authorized to proceed, with formal Change Order to follow. Quoted only = Myrex has not been authorized to proceed. Please initial here to verify Change Order status. FLINTCO, Authorized Signature NOTES: EXTRA WORK WILL NOT BE PERFORMED UNTIL A SIGNED COPY IS RETURNED TO MYREX INDUSTRIES. THE CHANGES QUOTED HEREIN WILL IMPACT THE MYREX PRODUCTION SCHEDULE BY A MINIMUM OF 5 DAYS. Charge,/ 9954-02 Date Printed 9n4/2010 Page 2 of : ss 200 -IJ I :3N) 1 w 'O P (6S 200-IJ?I •38) AlV9 dill 101 a3H1413 A1VD s CO .-a CO 2>I8 I. S-13NNVHD CO m O; Ca CO X CO N r 4- x s. 4- 1=1 - CI 03 LT A r 8.4 fi] r t -r N P1 r - C H P1 4-1 r• 11-1 CI r A Z 11-1 N�I b CO C1 CO Q IV 07 Cd CO w 07 YI SidIJ31VW SHOP NOTES Mlis DIA (O.N.O.) E70XX MATERIAL. SPEC: AS NOTED ON BILL SURFACE PREP: SSPC-5P3 FINISH: HOT DIP GALVANIZED -11 Proposed Change Order #8 City of Round Rock Intermodal Transit and Parking Facility City of Round Rock, TX Owner: The City of Round Rock Description: RFI 043 - Added Welded Wire Mesh Fabric to topping slabs A: Material & Equipment: 8: Labor C: Subcontractors - See attached quotations Urban Concrete 0. General Contractor Mark-Up ( 10%) F. Contract Time Extension 0 Calender Days intco $ Sales Tax ( 0.00%) $ Constructive Solutions Subtotal A $ $ Labor Burden ( 44.00 %) $ Subtotal B $ $ $ 2,023.00 Subtotal C $ 2,023.00 Subtotal A - C $ 2,023.00 $ 202.30 Subtotal D $ 202.30 TOTAL: $ 2,225 nAsbestos Allowance Change Order The City of Round Rock By• �'/I 1.3y: niel Oates - Project Manager Larry Madsen - Public Works Rep (-'5 -1n Date Signed Date Signed Barnes, Gromatzky, Kosarek Architects By: Arturo Arredondo Date Signed 8100 (Toss Park Dr. Constructive Solutions REQUEST FOR INFORMATION No. 00043 Phone: 512.891.7224 Austin, TX 78754-7224 Fax: 512.891.7229 TITLE: Reinforcing Requirements of Topping PROJECT: Round Rock Intermodal Transit/Park TO: Attn: Art Arredondo, AIA Barnes Gromatxky Kosarck A 1508 West 5th Street Suite 200 Austin, TX 78703 Phone: 512-476-7133 Fax: 512-478-2624 DATE: 9/9/2010 JOB: 4399 STARTED: COMPLETED: REQUIRED: 9/16/2010 QUESTION: Please confirm there are no reinforcement requirements for the topping slab. ANSWER: The topping slab serves only to pre tec_t the waterproofing membrane from traffic. All structural loads are carri by the structure below. However, for long term durability the topping slab needs temperature reinforcement. The 3 inch topping slab shall be reinforced by 6 x 6-W4.0 x W4.0 welded wire fabric. WWF should be installed in flat sheets to avoid problems with the "waviness"of rolled WWF. By Debin Chen, PE, Jose I. Guerra, Inc. ?01.7 Requested By:llimco Inc. Signed: Daniel Oates Date: Pape 1 of 1 CMCIETE COMTMCTM$ tit URBAN CONCRETE CONTRACTORS 4309 South 1st Street Austin, TX 78745 512.263.1555 / 512.263.1558 Fax CHANGE AUTHORIZATION To: Daniel Oates Flintco, Inc. From : Stephen Wallace Urban Concrete Contractors, Ltd. Change Request #05 Date : October 7, 2010 Project CORR Intermodal & Parking Facility Pricing for RFI #043 Response Urban Concrete Work: Change in Welded Wire Fabric size and quantity per response to RFI #043 dated 09/09/2010 for the topping slabs. 2 ton rebar allowance is included, please see pricing breakdown on pg. 2 Labor: $288.00 Materials: $1,471.16 Equipment: $0.00 Overhead & Profit (15%): $263.87 Total Change Request: $2,023.03 I Please sign and return this form to authorize said work to proceed. Printed Name Title Signature Date Thank you, Stephen Wallace Sr. Project Manager Urban Concrete Contractors, Ltd. C.O. BREAKDOWN Project Name: CORR Intermodal & Parking Facility Description of Change: Pricing for RFI #043 Response Total Square Feet: 1 GRAND TOTAL: $2,023 COST BREAKDOWN DESCRIPTION LABOR DATE: 10/7/2010 1 UNITS ] UNIT TYPE COST / UNIT 1 TOTAL COST t $ / Sq. Ft. 11 CONCRETE Concrete 0 MHRS $35.00 $0.00 $0.00 LABOR TOTAL: $0.00 $0.00 CONCRETE Concrete 0.0 CY $75.00 $0.00 $0.00 CONCRETE TOTAL: $0.00 $0.00 REINFORCING STEEL Reinforcing Steel 1 LS $2,848.00 $2,848.00 $2,848.00 2 Ton Credit per Contract -2 Tons 5688.42 ($1.376.84) ($1,376.84) REINFORCING TOTAL: $1,471.16 $1,471.16 MATERIALS SPECIALTY 1800 Case $0.16 $0.00 $0.00 MATERIAL TOTAL: $0.00 $0.00 SPECIALTY & FINISH Steel Tying 1800 LS $0.16 $0.00 $0.00 Place & Finish SF $0.00 $0.00 PLACE & FINISH TOTAL: $288.00 $288.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SPECIALTY TOTAL: $0.00 , $0.00 & FINISH Steel Tying 1800 SQ $0.16 $288.00 $288.00 Place & Finish SF $0.00 $0.00 PLACE & FINISH TOTAL: $288.00 $288.00 (COST SUBTOTAL: OVERHEAD & PROFIT: $1,759.16 $1,759.16 15.00% $263.87 $263.87 TOTAL PRICE: $2,023.03 $2,023.03 Proposed Change Order #11 City of Round Rock Intermodal Transit and Parking Facility City of Round Rock, TX Owner: The City of Round Rock I%iNTCO \Constructivc Solutions Description: Changed connection at top of green screen in order to avoid PT Cables in Slab. Email confirming from Larry Swayze and Art Arredondo 10-8-10 A: Material & Equipment: B: Labor C: Subcontractors - See attached quotations Myrex Steel Sales Tax ( 0.00%) $ Subtotal A $ Labor Burden ( 44.00 %) $ Subtotal B $ $ 437.00 $ Subtotal C $ 437.00 Subtotal A - C $ 437.00 D. General Contractor Mark-Up ( 10%) $ 43.70 F. Contract Time Extension 0 Calender Days Fli By: tc Inc aniel :a - --roject Manager zt'3--(C5 Date Signed Subtotal D $ 43.70 TOTAL: $ 481 Asbestos Allowance Change Order The City of Round Rock By: Larry Madsen - Public Works Rep Dale Signed Barnes, Gromatzky, Kosarek Architects By: Arturo Arredondo Date Signed Daniel Oates From: Art arredondo [aarredondo@bgkarchitects.com) Sent: Monday, October 11, 2010 8:26 AM To: 'Larry Swayze: Daniel Oates Cc: Mark Dudney; Michael Dickey Subject: RE: Tube Steel Connection at Slab Larry, I think that's OK given the options and circumstances. Thanks, Arturo Arrcdondo, rAI:A Barnes ( ;romatzkV Kosarek ,Architects 512.476.7133 478 2624 (fax) From: Larry Swayze jmailto:lswavzeCaouerra.coml Sent: Friday, October 08, 2010 4:41 PM To: Daniel Oates Cc: Art arredondo; Mark Dudney; Michael Dickey; Larry Swayze Subject: RE: Tube Steel Connection at Slab Daniel: The installation you arc concerned about is not what 1 Was thinking about a picture is worth a thousand words..... .An embedment depth of 2 '-L" at the top condition is acceptable in this application. That would mean using a Simpson'I'itcn 1 11) that is 3" long....if they made one that was galvanized, which they don't. According to their literature, the shortest ' 'k" dia. mechanically galvanized anchor they make is 5" in length. They do make a zinc plated ".." dia. x 3" 'Filial 1 11), though. The problem with the zinc coated anchors is they will have to be painted occasionally. .\ " 2" dia. galv. epoxy anchor with 2 ' _,. embedment could be used with a vert minimal amount of thread exposed beyond the top of the surface of the nut. 'I'hc epoxy substitution system would have to nicer the ,AC1 Appendix 1) criteria for cracked concrete, ‘v hich should not a problem. Art: What do you think;' Larry M. Swayze, P.E. Senior Structural Proiect \tanager Jose I. Guerra, Inc. 2401 South 11.1-35 :Austin, Texas 713741 P: 512-445-211911 ext 243 512-445-2099 C: 512-694-2163 ',vww.gucrra.ct,m ' ( 111( .1 : This t' trail u;I,t Inlssl,,n is nttcntletl unk fife the use of the nnlnvitIuai or cntttr n:uncti altuyc antl mac curtain inti,nttattotn that is confxicnn:d, prtyilegetl, aril, nt cyentpt ti-utn tltsrluairt• nntIct .ipphcahlc Lnv. It yeti .ire nor the intended recipient, you are herchc notified that any review, disclosure, tttpyin}1, distrihutii to. of other use ut arc Of the httitrnlatiun c. nwuncd to this transmission 1, strictly prohibited. II cru have received this trausiviissiiiii in error, please innncdiatcly notity the sender in e tnad ;it the ahove address ; ttd delete it tiottt v itr curtynter st stent: vitt should not copy the Message or disclose is ennu•nts to ancone. Illy content ..t the nu >sat't .utd nr anachntents nen int reflect the view .incl opt t ,ti.. it rhe ongina,ng rompam or any par it r< representing. From: Daniel Oates Jmailto:DOatesCTflintco.coml Sent: Friday, October 08, 2010 2:18 PM To: Larry Swayze Cc: Art arredondo; Mark Dudney; Michael Dickey Subject: Tube Steel Connection at Slab Larry - Here are a few pictures that show our challenge. In picture 563 you can see the clip that attaches to the bottom of the slab and the hole on the right doesn't interfere with the PT Cables, however the hole on the left appears to line up with one of the cables as it exits the slab shown in picture 564. If we can use a shorter titen anchor on the left hole in 563 we won't interfere with the cables. Something in the neighborhood of 2-3" should be fine in that scenario. Please let me know what you think. Daniel Oates, DBIA, Project Manager Flintco, Inc. City of Round Rock Intermodal Transit and Parking Facility 211 South Brown Street // Round Rock, TX 78664 512-291-6021 (p) // 512-291-6064 (f) // 512-848-3696 (c) www.fl i ntco. corn 2 ,01"e4-ei ,Q) MUM Industries Fabricators of Commercial and Industrial Steel City of Ilouslon Certified 11367 9119 Weedy Ln. Houston, TX 77093 (713) 691 5200 Main Fax (713) 691-3355 Sales Fax (713) 691-4646 *** CHANGE ORDER REQUEST *** DATE OF CHANGE ORDER Octobor 29, 2010 MYREX JOB NO. 9954 MYREX CHANGE NO. 05 CUSTOMER CHANGE ORDER OR RFI NO. Myrex drg FBA dt10/15/10 PROJECT City of Round Rock Parking Garage CONTRACTOR NAME FLINTCO, INC. PROJECT MANAGER Daniel Oates JOB SITE PHONE JOB SITE FAX 1 off- 3 PLEASE PROCESS A CHANGE ORDER 10 OUR PURCHASE ORDER FOR THE EXTRA WORK DESCRIBED BELOW: Tubo stool connection a slab as por Myrox drwing no FB -1 dated 10/15/2010. All material will be painted with one coat of Myrex standard shop primer with SSPC-SP2 cleaning u.n.o. Materlots' Material Amount l Fabrication Manhours 010 Hourly Rata j 45.00 Fabrication Labor 1 0.00 Detailing Manhours I 0,00 Hourly Rate 1 45.00 Detailing Timo n...."."=0 Freight J ITEM DESCRIPTIONS AND AMOUNTS: Galvanizing, Mlscollaneous, Buyouts, etc. (140) 1/2" dia all threaded I 280.00 4 010) Large Catridges of Willi HY-150 Epoxy 100.00 See Page 2 for Grand Total Change rr 9951-08 Oats Noted 10,29/1010 Papp 1 of: NOTES of 3 Subtotal from Page 1 380.00 10.0094 Ovefiead r 5.009E Profit 19.00 Erection Erection Overhead/Profit 1-71:51:r CHANGE TOTALS Change Amount r ----"""""r"...37.00 Tax Amount r-- 6.00 GRAND TOTAL J 437.00 The status of this Change Order Is Unapproved Approved = Myrex has received formal Change Order. Unapproved = Myrex has been authorized to proceed, with formal Change Order to follow. Quoted only = Myrex has not been authorized to proceed. Please Initial here to verify Change Order status. FLINTCO, INC. y Boze — Authorized Signature NOTES: EXTRA WORK WILL NOT BE PERFORMED UNTIL A SIGNED COPY IS RETURNED TO MYREX INDUSTRIES. THE CHANGES QUOTED HEREIN WILL IMPACT THE MYREX PRODUCTION SCHEDULE BY A MINIMUM OF 1 DAYS. Champ a 9974.08 Osis Printed: 1020/2010 Pogo 2 or: Clura-e O,rler # 9954-06 3 o-4. 3 Materials --- Steel Fabrication Beam A-50 # @ $0.42 = $0 Scrap ##### # @ $0.42 = $0 Channels A-36 # @ $0.44 = $0 Scrap ##### # @ $0.44 = $0 MC # @ $0.50 = $0 Scrap ##### # @ $0.50 = $0 Plate cut to Rect # @ $0.60 = $0 Plates A-36 Bent PL # @ $0.60 = $0 FB, Rod, # @ $0.44 = $0 Angles # @ $0.44 = $0 Tube # @ $0.48 = $0 Scrap #tl### # @ $0.48 = $0 Pipes # @ $0.48 = $0 Scrap NM # @ $0.48 = $0 Misc. Steel 40% # @ $0.65 = $0 Total Steel/Scrap 0 # @ #DIVJOI = $0 Tons 0.00 Buy Out/Sub out Shop Studs & DBA $ 1.75 $0.00 Shear Studs $ 1.00 $0.00 Shearing/Bending $ 0.15 $0.00 Erection Bolt 140 $ 2.00 $280.00 Exp/Epoxy Bolts 10 $ 10.00 $100.00 Plastic shims $ 5.00 $0.00 Galvanizing: Class t /Clean: # @ $ 28.00 $0.00 Misc. Class 2 : # @ $ 32.00 $0.00 Pipe Bollards # @ $ 38.00 $0.00 Pipe Handrails: # @ $ 46.00 $0.00 Sub Total For Fabrication $380.00 3 o-4. 3