Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CM-11-01-010
ROUND ROCK, iEh.AS .7I R'C [ r SSIO t P c 1 _Rir? Item Caption: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 1 with HDR Engineering, Inc. for the Reuse Water System — Phase 1 Project Approval Date: January 7, 2011 Department: Infrastructure Development and Construction Management (IDCM) Project Manager: Jeff Bell Item Summary: This supplemental contract is for additional engineering services required for the Reuse Water System — Phase 1 Project. The additional services include revising Construction Plans for horizontal and vertical relocation of one million gallon Clearwell, High Service Pump Station, and Electrical building; preparing drawing details and bid descriptions for the addition of meter vaults and appurtenances in Old Settlers Park; developing an installation plan and cross connection control strategy for retrofitted irrigation system in Old Settlers Park. In addition, coordinating floodplain and drainage easement issues related to proposed Phase 1B facilities with the City of Round Rock staff; mapping current floodplain boundaries onto site plan from current FEMA flood profiles and topographic data; developing and revising site plan drawing to reflect the current floodplain boundaries, the final plat of the Brushy Creek Regional WWTP, and layout of proposed Phase 1B Reuse Facilities. Strategic Plan Relevance: Goal 27.0 "Ensure there is an adequate, affordable and safe water supply." Cost: $48,161 Source of Funds: Self -Financed Water Construction and Bureau of Reclamation STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING, INC. ("Engineer") ADDRESS: 4401 West Gate Blvd., Ste. 400, Austin, TX 78745 PROJECT: Water Reuse System — Phase 1 This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 25th day of March, 2010 for the Water Reuse System — Phase 1 Project in the amount of $543.491.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $48,161.00 to a total of $591,652.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. I1. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $48,161.00 the lump sum amount payable under the Contract for a total of $591,652.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.7134; 00209763 84275 w105wwtp 1 �I-i I-ol-oto HDR ENGINF .RING, INC. E3 Date /2�9//.0 CITY OF R I D ROCK By: I /1/9 on Date AP VED AS T FORM: -.1 INDY 1>E4 E,5,GPA- Step 1, n L. Sheets, City, Attorney AcriNE7OOry m NP( R Supplemental Contract 0199.7134; 00209763 Rev.12/01!08 wr05wwtp 84275 2 ADDENDUM TO EXHIBIT B Engineering Services Phase 1B — Reuse Water Treatment Facilities: Design 1 Revise Drawings for relocated Cleat -well, High Service Pump Station, Electrical Building, and related appurtenances. 2. Revise Drawings for raised Clearwell, High Service Pump Station, Electrical Building, and related appurtenances. 3. Prepare drawing details and bid descriptions for addition of meter vaults with appurtenances in Old Settlers Park. 4. Develop installation plan and cross connection control strategy for retrofitted irrigation system in Old Settlers Park. 5. Modify bid specifications as required based on above changes. 6. Coordinate drawing and specification revisions with electrical and structural subconsultants. Phase 1B — Reuse Water Treatment Facilities: Floodplain Coordination 1. Coordination of floodplain and drainage easement issues related to proposed Phase 1B facilities with City of Round Rock staff. 2. Development and revision of site plan drawings (Sheet 1Z-01) to reflect current floodplain boundaries, the Final Plat of the Brushy Creek Regional WWTP, and layout of proposed Phase 1B facilities. 3. Mapping current floodplain boundaries onto site plan from current FEMA flood profiles and topographic data. Note: Above services do not include fees associated with a plat revision for the Brushy Creek Regional WWTP. Water Reuse System — Phase 1: BuRec and ARRA Coordination 1. Preparation of labor reporting forms pursuant to Bureau of Reclamation and American Recovery and Reinvestment Act requirements related to acceptance of Federal grant funds for the Williamson County Water Reclamation and Reuse Project — Phases 1 A and 1 B. EXHIBIT C - WORK SCHEDULE a . a) 2; •c2 ken co 3� 1-R§ Ei o $/ • a:_� zo ■ 2k$ ƒ Ere GEm >,as ca. 2 k �Z 4�._ 0 z 0 < I < I LL 0 z 0 m \ Floodplain Coordination ■ a. § 2 z 12 k ) ®1L C } co - e • . # © § ■ > \ 75 13 a▪ s .0 E of 0 .0 • a- •c 0) p ; a / F .3 0. . ■ C § $ . - e . E • / t2 § •si k k 2 ■ a jai , er a ! o > 2 a § $ @ # § 6 $ E < & O § 2 3 3) c 4) 0 4 k 2, 2 - s e c 2 e c k I ▪ c a < « J Supplemental Contract Exhibit C work schedule ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page a) N e N N 03 f` CO aI N 0 O WV U ti a. N CO N N ti 0 N N v 0 O ° c 4 co O O co O J C si CITY OF ROUND ROCK DRAWING SHEETS: Supplemental Engineering Services Table 2 of 4 Relocated Structures Series 000 - General OD -03 Hydraulic Profile Series 100 - Site Improvements 1C-01 Overall Site Plan 1C-02 Erosion Control And Contractor Storage Area 2 4 1C-03 Horizontal Control, Paving and Grading Plan 1 2 1C-04 Yard Piping Plan 1 4 12 1 4 18 Description Estimated Hours By Labor Category PP PE Tech 1 Series 500 - Clearwell Tank 5D-01 Tank Plans 50-04 Tank Piping Details 1 2 8 1 1 Serled 600 - High Service Pump Station 6D-01 HSPS Plan 60-02 HSPS Sections 1 2 4 6D-03 HSPS Sections 1 4 1 4 Raised Structures Subtotal 4 18 56 Estimated Hours By Labor Category Description PP PE Tech Series 000 - General OD -03 Hydraulic Profile 1 2 Series 100 - Site Improvements 1C-03 Horizontal Control, Paving and Grading Plan 1 C-05 Meter Vault Sections and Details 1 3 8 3 8 Series 500 - Clearwell Tank 50-02 Tank Sections 5D-03 Tank Piping Details 0.5 2 4 5D-05 Tank Details 0.5 0.5 Serled 600 - High Service Pump Station 8D-02 HSPS Sections 6D-03 HSPS Sections 0.5 1 2 Subtotal 1 2 10 26 CITY OF ROUND ROCK HOURLY SUMMARY SHEET Table 3 of 4 Supplemental Engineering Services Employee Category Hours Salary Direct Labor Cost PP 38 $81 $3,093 PE 104 $46 $4,783 CADD Tech 130 $25 Sr CADD Tech 12 $3,237 CFM 1.5 $47 $43 $510 GIS 2 $23 Cler/Acct 10 $46 $70 $20 $200 Subtotal $11,939 LABOR COST LUMP SUM COST - BASIC SERVICES Table 4 of 4 Overhead Total - Labor Plus Fixed Fee - Total Phase Labor Percent Overhead Percent Cost Design: Add Services $11,939 175% $32,833 12% $36,773 DIRECT COSTS Total Direct Costs Total Lump Sum Cost Expense Rate Quantity Total Printing/Copying $200 1 Job $200 Travel') $0.50 108 $54 Electrical Subconsultant (James R. Schultz & Assoc.) $4,040 Structural Subconsultant (Jose I. Guerra, Inc.) $6,000 Survey Subconsultant (Inland Geodetics, LP) $1,094 Notes 1. Current IRS mileage rate $11,388 $48,161