Loading...
CM-11-01-02111"ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. City Manager Approval Summary Sheet Consider executing Supplemental Agreement No. 2 to "Agreement for Consulting Services for Construction Materials Inspection and Testing Services for the Intermodal Transit and Item Caption: Parking Facility" with Professional Service Industries, Inc. (PSI) Approval Date: 1/21/2011 Department: Infrastructure Development and Construction Management Project Manager: Larry Madsen Item Summary: Additional construction material inspection and testing was needed to complete the project. Original Contract: $29,540.00 Supplemental No. 1: $6,494.60 Strategic Plan Relevance: Mobility and Connectivity Strategic Initiative 2060 Vision: Residents and visitors will have alternative choices for transportation including public transportation options, pedestrian/biking options and personal vehicle. Cost: $3,703.00 Source of Funds: 2002 GO Bonds and U.S. Department of Transportation REV. 6/10/10 SUPPLEMENTAL AGREEMENT NO. 2 TO "AGREEMENT FOR CONSULTING SERVICES FOR CONSTRUCTION MATERIALS INSPECTION AND TESTING SERVICES FOR THE INTERMODAL TRANSIT AND PARKING FACILITY WITH PROFESSIONAL SERVICE INDUSTRIES, INC." CITY OF ROUND ROCK STATE OF TEXAS COUNTY OF WILLIAMSON COUNTY OF TRAVIS KNOW ALL BY THESE PRESENTS: FIRM: Professional Service Industries, Inc. (PSI) ADDRESS: 2600 McHale Ct., Suite 125, Austin, Texas 78758 PROJECT: Construction materials inspection and testing for Intermodal Transit and Parking Facility, Round Rock, Texas This Supplemental Agreement No. 2 to "Agreement for Consulting Services for Construction Materials Inspection and Testing Services for the Intermodal Transit and Parking Facility" is made by and between the City of Round Rock, Texas (hereinafter called the "City"), and Professional Service Industries, Inc. (hereinafter called "PSI"). WHEREAS, the City and PSI executed the referenced Agreement (hereinafter called the "Agreement") on the 26th day of the month of March, 2010 for provision of construction materials inspection and testing services in the amount of $29,540.00; and WHEREAS, the City and PSI executed Supplemental Agreement No. 1 on the 8th day of October, 2010 for provision of a scope of services change and addition of fees in the amount of $6,494.60 for a total of $36,034.60; WHEREAS, it has again become necessary to amend the Agreement by executing this Supplemental Agreement No. 2 to provide a scope of services change and add additional fees in the amount of $3,703.00 for a total of $39,737.60; NOW, THEREFORE, premises considered, the City and PSI agree that said Agreement is amended as follows: I. Section 1.1.2.5 shall be amended to read as follows: 1.1.2.5 The financial parameters are as follows: The actual fee for PSI's consulting services shall be $39,737.60, comprised of the following: Services Unit Rate Quantity Total Excavation, Filling, and Backfilling Moisture/Density Relationship ASTM D698 or D1557 each 165.00 4 660.00 00211119/jkg QW'-Ot-o2. Atterberg Limits each 45.00 4 180.00 Sieve Analysis each 45.00 4 180.00 Percent Passing #200 sieve each 45.00 4 180.00 Soil Inspection (regular time) hourly 34.00 52 1,768.00 Nuclear Gauge Equipment Charge daily 35.00 10 350.00 Subtotal $3,318.00 Drilled Piers Pier Observation (regular time) hourly 36.00 189 6,804.00 Pier Observation (overtime) hourly 46.80 47 2,199.60 Subtotal $9,003.60 Concrete and Reinforcing Reinforcing Observation hourly 36.00 68 2,448.00 Concrete Inspection (regular time) hourly 34.00 175 5,950.00 Concrete Cylinders each 8.00 350 2,800.00 Post -Tension Inspection hourly 40.00 65 2,600.00 Concrete Cylinder Sample Pick-up hourly 30.00 24 720.00 Subtotal $14,518.00 Structural Steel Visual Weld Inspection hourly 70.00 12 840.00 Subtotal $840.00 Masonry Masonry Observation hourly 34.00 0 0.00 Mortar, 2x2x2 cube each 8.00 0 0.00 Masonry Grout, Cylinder each 8.00 0 0.00 Masonry Sample Pick-up hourly 32.00 0 0.00 Subtotal $0.00 Transportation Vehicle Charge daily 25.00 116 2,900.00 Subtotal $2,900.00 Engineering/Project Management Report Preparation and Review each 20.00 255 5,100.00 Administrative Assistant hourly 75.00 0 0.00 Project Manager hourly 80.00 24 1,920.00 Professional Engineer hourly 125.00 13 1,625.00 Letter of Conformance each 250.00 0 0.00 Subtotal $8,645.00 Post -Tension Inspection (overtime) hourly 60.00 6 360.00 Concrete Inspection (overtime) hourly 51.00 3 153.00 Subtotal $513.00 Total $39,737.60 IN WITNESS WHEREOF, the City and PSI have executed this Supplemental Agreement No. 2 in duplicate. PROFESSIONAL SERVICE INDUSTRIES, INC. By: Name: Title: Cs de.p �-• • �• Date: /- ., - Zo 4i CITY OF ROUND ROCK, TEXAS By: Name: GND Title: f cti wacrrQ M ppt. r&iXR Date: t-21-11 ATTEST: By: 4144/L i1 Sara L. White, City Secretary FOR CITY, APPROVED AS TO FORM: By: L i Stepha L. Sheets, City Attorney