Loading...
CM-11-02-037ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Item Caption: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 2 with HDR, Inc. for the Kenney Fort Boulevard (Arterial A) Traffic Impact Fee — Trip Generation and Capacity Calculations project. Approval Date: February 11, 2011 Department: Infrastructure Development and Construction Management Project Manager: Thomas E. Word, Jr., P.E. Item Summary: On August 19, 2009 the City Council executed a contract with HDR, Inc. for $27,209 to conduct an impact fee analysis for Kenney Fort Boulevard (R -09-08-27-9C1). This analysis included six specific properties which are within the boundaries of Brushy Creek, the Union Pacific Railroad right-of-way and Chandler Creek in the general vicinity of Kenney Fort Boulevard (Arterial A) between Joe DiMaggio Boulevard and Forest Creek Drive. This analysis will be the basis for consideration of an impact fee for these properties, which would be used to recoup some of the City's expenses related to the construction of this arterial roadway. This item is a supplemental contract with HDR, Inc. in the amount of $16,421 to provide for additional work on the impact fee analysis. This work involves several items to ensure that the report is in compliance with applicable state laws, as well as providing for the preparation of exhibits and the consultant's attendance at the various public meetings related to the impact fee adoption process. Strategic Plan Relevance: 26.0 Construct Major Elements of the Transportation and Mobility System Cost: $16,421 Source of Funds: Transportation System Development Corporation STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR, INC. ("Engineer") ADDRESS: 504 Lavaca Street, #1175, Austin, TX 78701 PROJECT: Kenney Fort Boulevard (Arterial A) Traffic Impact Fee- Trip Generation and Capacity Calculations This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 276 day of August, 2009 for the Kenney Fort Boulevard (Arterial A) Traffic Impact Fee -Trip Generation and Capacity Calculations Project in the amount of $27,209.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $16,421.00 to a total of $43,630.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. Ii. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $16,421.00 the lump sum amount payable under the Contract for a total of $43,630.00, as shown by the attached Addendum to Exhibit D. CiM-1l-crz.-o3� IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Date CITY OF RQUND ROCK APP 1 VED AS TO FORM: By: Ti L Skye Nortoccd ail//aou &Li tYlarlafz_ Date Stepha L. Sheets, City Attorney ADDENDUM TO EXHIBIT A City Services The City will provide for the Engineer under this agreement the following items/information: 1. Provide updated land use information for tracts that need to be included in the study. A minimum 10 -year land use projection will be required to conduct the study. 2. Review the findings of the study report and provide comments for incorporation into the final report. ADDENDUM TO EXHIBIT B Engineering Services ADDITIONAL TASKS A. Preparation of project correspondence including reports, record keeping, letters as necessary due to extension of the project schedule. B. Preparation of monthly invoices due to extension of project schedule. C. Update project report to address comments from City's attorney and staff, including specific sections for Land Use Assumptions, Capital Improvements Plan, and Traffic Impact Fee. Provide the CITY with two copies of the final report, addressing all comments received from CITY. D. Preparation of presentation to explain Land Use Assumptions, Capital Improvements Plan, and Traffic Impact Fee at the first hearing. The presentation will also include exhibits showing the service area, Kenney Fort Boulevard roadway within the project limits, and land use assumptions. E. Attendance at one (1) meeting for presentation to the Capital Improvements Advisory Committee. F. Attendance at one (1) meeting at the City Council for the first hearing on possible adoption of Land Use Assumptions and Capital Improvements Plan. G. Preparation of responses to questions arising from the hearing described in Item F above. H. Prepare for second hearing on Impact fee. I. Attendance at one (1) meeting at the City Council for the second hearing on possible adoption of Impact Fees. J. Preparation of responses to questions arising from the hearing described in Item I above. K. Attendance at one (1) meeting at the City Council for the third hearing on possible Approval/Disapproval of the adoption of Impact Fees. Deliverables Required of the ENGINEER The ENGINEER will be required to provide the CITY with two copies of the final report, including all supporting documentation. ADDENDUM TO EXHIBIT C Work Schedule Months Jan -11 Feb -11 Mar -11 Apr -11 Ma -11 June 2011 to Dec 2011 Tasks Final Re ort Pre•aration Post Report Meetings/Hearings ADDENDUM TO EXHIBIT D Fee Schedule Exhibit D - Supplemental 2 Cost Component, Hours Total Hours Project Principal 24 Project Manager 36 Sr. Project Engineer 0 EIT 10 Sr. Design Technician 0 CADD Technician 12 Clerical/Steno 12 Total Hours 94 Cost Component, Dollars Labor Burdened Rate Rate Project Principal $80 $246 $5,914 Project Manager $67 $206 $7,429 Sr. Project Engineer $63 $194 $0 EIT $35 $108 $1,078 Sr. Design Technician $36 $111 $0 CADD Technician $20 $62 $739 Clerical/Steno $22 $68 $813 $15,973 Technology @ $3.70/hr $3.70 $348 Phone, Fax, Postage,Advertisenients $50 Travel Expenses $50 TOTAL EXPENSES $448 Project Lump Sum Fee Summary Direct Labor $5,186 Indirect Costs (175%) $9,076 Direct Costs $448 Profit @12% $1,711 TOTAL LUMP SUM FEE $16,421