CM-11-02-048ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 1 with Enviro Remediation for Item Caption: the 2007-2008 Wastewater Collection System Rehabilitation Project. Approval Date: February 25, 2011 Department: Infrastructure Development and Construction Management Project Manager: Eddie Zapata Item Summary: Quantity Adjustment/Change Order No. 1 is needed to make necessary repairs to an existing 8" wastewater main crossing Onion Creek. The need for the repair was unknown prior to the bidding of this original contract and the repair is urgently needed to protect the health, safety and welfare of the public. Strategic Plan Relevance: Goal No. 28.0: Protect public health and protect the environment through proper waste disposal. Cost: $28,921 Source of Funds: Self -Financed Wastewater Construction REV. 6/10/10 rev, 09/10 Contract Quantity Adjustment/Change Order Department: Engineering Services Division Project Name: 2007-2008 Wastewater Collection System Rehabilitation City Project ID Number WW05RHB78 Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 2/11/2011 1 Quantity Adjustment/Change Order No. 1 is needed for an urgent repair to an existing 8" wastewater main crossing on Onion Creek. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared By: Cont Appr City Staff Approval: City Official Approval: Sign Si• -ture O Signature Amount % Chan e $716,552.20 $0.00 $17,871.00 $17,871.00 $734,423.20 $0.00 $11,050.00 $11,050.00 0.00% 1.54% 1.54% $745,473.20 225 calendar days 225 calendar days 230 calendar days Eddie Zapata, Project Manager, CORR Printed Name, Title and Company Randall Chilton, President, Enviro Remediation Printed Name, Title and Company Danny Heiden, P.E., City Engineer, CORR Printed Name, Title LvCIJdrWpoiFity Manager, CORR Printed Name, Title z//44/ Date Date zll�-�rl Dat c/g2 5/i Dat rev, 09/10 Contract Quantity Adjustment/Change Order Page 2 of 3 Bid Item # New �..�.• Item Descri ' tion and Chan • e Concrete Cap for 24" steel Encasement V V. Mei Unit CY Vaw • 65130.00 Unit Price $ Amount $8,450.00 Contract Time Adjustment (Days) New Temporary Creek Crossing LS 1 $2,600.00 $2,600.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $11,050.00 2 ROUND ROCK, TEXAS rev, 09/10 Contract Quantity Adjustment/Change Order uantity Adjustment D Page 3 of 3 Bid Item # 1 Item Descri ' tion and Chan • e 8 " PVC SDR 26 Sewer Pipe, 0' to 8' Open Cut Unit LF • 105 Unit Price $49.00 Amount 10,100.00 onra Time Adjustment (Days) 8 24" Steel Encasement Pipe by Open Cut LF 100 $101.00 $10,100.00 5 24 Trench Safety LF 105 $1.20 $126.00 0.5 32 Erosion Control LS 1 $2,500.00 $2,500.00 0.5 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00