Loading...
CM-11-03-053ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: City Manager Approval Summary Sheet Consider executing Change Order No. 1 with Westar Construction, Inc. for the City Hall Campus Improvements Project. March 4, 2011 Department: Parks and Recreation Project Manager: David Buzzell, Park Development Manager Item Summary: This item is for Changer Order No. 1 with Westar Construction, Inc. for the City Hall Campus Improvements Project. The majority of the items were related to coordinating this project with the City Hall Remodel Project and City Hall Plaza Project. Items such as the bridge walkway piers, the "center plaza" area, and the area along the parking garage were either changed/added/removed after the Campus Improvements Project was bid. The majority of the remaining change items are related to existing utilities that were discovered during construction. These utilities either didn't show up on as -built plans or they were shallower than the as -built showed. Strategic Plan Relevance: Cost: $ 1,085.90 Source of Funds: 2007 General Obligation Bonds CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Parks & Recreation PROJECT: City Hall Campus Improvements Project ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $283,217.00 $0.00 $1,085.90 $1,085.90 CHANGE DATA PAGE 1 OF 1 DATE: CHANGE ORDER NO: JUSTIFICATION: 2/14/2011 1 The majority of the items were to coordinate this project with the City Hall remodal and City Hall Plaza project. The remaining items were due to unforeseen utility issues that were discovered during construction. ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT C01.1 Drilled Bridge Piers LF 36 $137.00 CO1.2 CMU Tree Wells EA 3 $1,030.00 C01.3 Extend and Cap Sanitary Sewer Line LS 1 $600.00 $4,932.00 $3,090.00 C01.4 Lower 1/2" electrical conduit (by garage) LF 60 $8.34 $600.00 $500.40 ADDED DAYS CALENDAR/ WORKING 2 CO1.5 Reroute two 3" electrical conduits (by Business Center) LF 40 $50.00 CO1.6 Deduct concrete sidewalk by Garage SF 88 CO1.7 Deduct pavers north of Garage SF 1360 CO1.8 Deduct tree wells north of Garage EA 2 C01.9 Deduct Mexican Feathergrass by Garage EA 12 ($7.50) ($7.00) ($700.00) C01.10 Deduct street light by Garage EA 1 C01.11 Deduct sleeves to tree wells by Garage LF 20 ($17.00) ($5,000.00) CO1.12 Deduct Public Notice Board EA 1 PREPARED BY: ` " "V ' \\ David Buzzell, CORR Park Development Manager Date £ OAi.'/ f Contractor am SIGNATURE: PRINT NAME/TITLE: P,'L r i /,44 Iq-b, j -.n._ APPROVED: Date CITY OF ROUND ROCK CAVI- (1-03-053 54 mor ($10.00) ($8,000.00) TOTAL: $2,000.00 1 1 0 ($660.00) ($9,520.00) ($1,400.00) ($204.00) ($5,000.00) ($200.00) ($8,000.00) ($13,861.60) 0 0 0 0 0 0 0 4 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 0.38% PREVIOUS CHANGE ORDER: TOTAL % CHANGE: 0 0.38% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $284,302.90 constco2/forms6/Ik CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Parks & Recreation PROJECT: City Hall Campus Improvements Project CHANGE DATA PAGE2OF2 DATE: CHANGE ORDER NO: 2/14/2011 1 ITEM # DESCRIPTION OF CHANGES UNIT QTY. C01.13 Replace +/-45 If of 15" storm sewer LS 1 C01.14 Remove waterproofing on east side of garage LS 1 C01.15 Relocate three drain inlets (center plaza area) LS 1 UNIT PRICE $3,600.0( $1,400.0( $500.0( C01.16 Deduct pavers in center plaza area SF 3219 C01.17 Concrete sidewalk in center plaza area SF 2559 C01.18 Pavers in center plaza area SF 435 C01.19 Concrete curb/wall by Utility Billing Driveway LF 25 ($7.0 $7.50 $7.00 $16.00 C01.20 Extending Storm Sewer toward Main Street LS 1 C01.21 Remove and Replace Utility Billing driveway LS 1 C01.22 Install (4) four 3/4" electrical conduits LS 1 C01.23 Repair Guardrail north of Business Center LS 1 C01.24 Masonry Veneer and Limestone Cap of Tree Wells LS 2 C01.25 Additional Repair & Replace Pavers (actual qty) SF 72 C01.26 Deduct Concrete Pavers (actual qty) SF 65 $800.00 $1,600.00 $1,000.00 $250.00 $1,200.00 $9.00 ($7.00; TOTAL: AMOUNT 0) ADDED DAYS CALENDAR/ WORKING 1 $3,600.00 2 1 $1,400.00 0 $500.00 1 ($22,533.00) 0 $22,292.50 4 $3,045.00 1 $400.00 2 $800.00 1 $1,600.00 0 $1,000.00 0 $250.00 0 $2,400.00 2 $648.00 1 ($455.00) $1,085.90 17 constco2/forms6/Ik