Loading...
CM-11-03-059 (2)ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Item Caption: Approval Date: City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 1 with Sierra Contracting Corporation for the 615 East Palm Valley Blvd Campus Demolition project. March 11, 2011 Department: Infrastructure Development & Construction Management Project Manager: Larry Madsen Item Summary: City Staff procured engineering design services with KA Hickman in August 2010. The remodeling of the City -owned facility at 615 East Palm Valley Boulevard will provide for the co -location of multiple City departments at this 35,152 square feet, four building complex. This relocation will allow for City staff to be able to provide better accessibility and service to the citizens of Round Rock and other external customers at a single location. On November 9, 2010, City staff accepted bids for demolition services on the facility. Sierra Contracting Corporation was selected as the lowest bidder and best value for the City and costs for their services were approved on January 7, 2011 in the amount of $47,500.00. This Quantity Adjustment/Change Order provides for additional demolition services and disposal of unidentified sheetrock ceilings above suspended ceiling in Building A and Building B. Once the actual demolition was started and the grid and ceiling tile was removed from the exposed ceiling it was discovered that an original hard sheetrock ceiling had been covered up in certain areas during previous remodel work. This second layer of ceiling which had been covered up had not been part of the original contract and removal is being added to the agreement by this change order. This work is needed to fully expose ceiling rafters so the structural integrity of the building can be viewed by the design team. Strategic Plan Relevance: 20.0 - Build and maintain the facilities needed to make the City attractive to businesses. Cost: $3,075.00 Source of Funds: 2002 General Obligation Bonds REV. 6/10/10 rev_ 09/10 Contract Quantity Adjustment/Change Order Department: Infrastructure Development & Construction Manage Project Name: 615 East Palm Valley Blvd Campus Demolition City Project ID Number: AA30BPALM Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 2/23/2011 1 Additional demolition and disposal of unidentified sheetrock ceilings above suspended ceiling in Buildng A and Building B. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Contractor Approval: City Staff Approval: City Official Approval: Signature GM -I I-03-os�j g aturen and Approvals ,d2044 KE,r� /J/tK/a4�,J ?0, -I�/ 2 f Prin Name, Tdpnd ny v. St 6&Ldr 2 rrr6 C a, 3/ lot l Printed Name, Title and Company Date 2-25.4/ Amount $47,500.00 $0.00 $0.00 $0.00 $47,500.00 0/0 Change $0.00 0.00% $3,075.00 6.47% $3,075.00 6.470/0 $50,575.00 Sixty Calendar Days Sixty Calendar Days Sixty Calendar Days 2.-23 .1( Date L.A�Y 4.ss&i' Printed Name and Title Date rev. 09/10 Contract Quantity Adjustment/Change Order Change Order Data Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Additional demolition and disposal of unidentified sheetrock ceilings above suspended ceiling in building A and building B. 1 $3,075.00 $3,075.00 0 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 o $0.00 $0.00 o $o.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $0.0o o $o.00 $0.00 o $0.00 $0.00 o $o.00 $0.0o o $0.0o $o.00 o $o.00 $0.00 o $o.00 $0.00 o $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $o.00 TOTALS: $3,075.00 0 rev. 09/10 Contract Quantity Adjustment/Change Order uantity Adjustment Data Page 3 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) o $o.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 o $0.00 $0.00 o $0.00 $o.00 o $0.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 0 $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $0.00 $o.00 0 $0.00 $o.00 0 $0.00 $0.00 o $0.00 $0.00 o $o.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 0 $o.00 $0.00 o $0.00 $o.00 o $0.00 $o.00 o $o.00 $0.00 o $o.00 $o.00 o $o.00 $0.00 o $0.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 TOTALS: $0.00 0