CM-11-03-059 (2)ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY
Item Caption:
Approval Date:
City Manager Approval Summary Sheet
Consider executing Quantity Adjustment/Change Order No. 1 with Sierra Contracting
Corporation for the 615 East Palm Valley Blvd Campus Demolition project.
March 11, 2011
Department: Infrastructure Development & Construction Management
Project Manager: Larry Madsen
Item Summary:
City Staff procured engineering design services with KA Hickman in August 2010. The remodeling of the City -owned
facility at 615 East Palm Valley Boulevard will provide for the co -location of multiple City departments at this 35,152
square feet, four building complex. This relocation will allow for City staff to be able to provide better accessibility
and service to the citizens of Round Rock and other external customers at a single location.
On November 9, 2010, City staff accepted bids for demolition services on the facility. Sierra Contracting Corporation
was selected as the lowest bidder and best value for the City and costs for their services were approved on January
7, 2011 in the amount of $47,500.00.
This Quantity Adjustment/Change Order provides for additional demolition services and disposal of unidentified
sheetrock ceilings above suspended ceiling in Building A and Building B. Once the actual demolition was started and
the grid and ceiling tile was removed from the exposed ceiling it was discovered that an original hard sheetrock
ceiling had been covered up in certain areas during previous remodel work. This second layer of ceiling which had
been covered up had not been part of the original contract and removal is being added to the agreement by this
change order. This work is needed to fully expose ceiling rafters so the structural integrity of the building can be
viewed by the design team.
Strategic Plan Relevance:
20.0 - Build and maintain the facilities needed to make the City attractive to businesses.
Cost: $3,075.00
Source of Funds: 2002 General Obligation Bonds
REV. 6/10/10
rev_ 09/10
Contract Quantity Adjustment/Change Order
Department: Infrastructure Development & Construction Manage
Project
Name:
615 East Palm Valley Blvd Campus Demolition
City Project
ID Number: AA30BPALM
Justification
Date:
Change Order/Quantity Adjustment
No.
Page 1 of 3
2/23/2011
1
Additional demolition and disposal of unidentified sheetrock ceilings above suspended ceiling in Buildng A and Building B.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Original Contract Price Plus Change Order(s) Plus
Quantity Adjustment(s):
Original Contract Time:
Contract Time Prior to this Change Order:
Contract Time with All Approved Change Orders:
Contractor
Approval:
City Staff
Approval:
City Official
Approval:
Signature
GM -I I-03-os�j
g aturen and Approvals
,d2044
KE,r� /J/tK/a4�,J ?0, -I�/ 2 f
Prin Name, Tdpnd ny
v.
St 6&Ldr 2 rrr6 C a, 3/ lot l
Printed Name, Title and Company Date
2-25.4/
Amount
$47,500.00
$0.00
$0.00
$0.00
$47,500.00
0/0 Change
$0.00 0.00%
$3,075.00 6.47%
$3,075.00 6.470/0
$50,575.00
Sixty Calendar Days
Sixty Calendar Days
Sixty Calendar Days
2.-23 .1(
Date
L.A�Y 4.ss&i'
Printed Name and Title
Date
rev. 09/10
Contract Quantity Adjustment/Change Order
Change Order Data
Page 2 of 3
Bid Item#
Item Description and Change
Unit
Qty.
Unit Price
Amount
Contract Time
Adjustment
(Days)
1
Additional demolition and disposal of
unidentified sheetrock ceilings above
suspended ceiling in building A and
building B.
1
$3,075.00
$3,075.00
0
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
o
$0.00
$0.00
o
$o.00
$0.00
o
$0.00
$0.00
o
$o.00
$o.00
o
$o.00
$0.0o
o
$o.00
$0.00
o
$0.00
$0.00
o
$o.00
$0.0o
o
$0.0o
$o.00
o
$o.00
$0.00
o
$o.00
$0.00
o
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$0.00
0
$0.00
$o.00
TOTALS:
$3,075.00
0
rev. 09/10
Contract Quantity Adjustment/Change Order
uantity Adjustment Data
Page 3 of 3
Bid Item#
Item Description and Change
Unit
Qty.
Unit Price
Amount
Contract Time
Adjustment
(Days)
o
$o.00
$0.00
o
$0.00
$0.00
o
$o.00
$o.00
o
$o.00
$o.00
o
$0.00
$o.00
o
$0.00
$0.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$0.00
$0.00
o
$o.00
$o.00
o
$o.00
$o.00
0
$o.00
$o.00
o
$o.00
$o.00
o
$0.00
$0.00
o
$o.00
$o.00
o
$0.00
$o.00
0
$0.00
$o.00
0
$0.00
$0.00
o
$0.00
$0.00
o
$o.00
$0.00
o
$0.00
$0.00
o
$o.00
$o.00
0
$o.00
$0.00
o
$0.00
$o.00
o
$0.00
$o.00
o
$o.00
$0.00
o
$o.00
$o.00
o
$o.00
$0.00
o
$0.00
$o.00
o
$o.00
$o.00
o
$0.00
$o.00
TOTALS:
$0.00
0