Loading...
CM-11-05-105ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction, LLC for the Little Oaks Subdivision Improvements Project. May 27, 2011 Department: Transportation Project Manager: Eddie Zapata Item Summary: Quantity Adjustment/Change Order No. 1 will add the following items to the project scope: adjustment of an existing 2" water main; reconstruction of two water services; and extension of an area inlet. These scope additions were not contemplated in the original contract and became necessary due to conflicts found during construction and/or to provide for a more appropriate final product. Quantity Adjustment/Change Order No. 1 will also adjust the contract to currently known field quantities. These adjustments include the following: additional flexible base required; additional concrete sidewalk; additional concrete driveway; additional 12" storm sewer culvert; and additional water service adjustments. The requirement for these adjustments became apparent due to actual field conditions discovered during construction. Strategic Plan Relevance: Goal No. 28: Provide for effective management of storm water. Cost: $21,345.50 Source of Funds: General Self -Financed Construction Contract Quantity Adjustment/Change Order ROUND ROOK, TEXAS rev, 09/10 Department: Infrastructure Development and Construction Management Project Name: Little Oaks Subdivision Improvements City Project ID Number TX03LOAK Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 5/11/2011 1 Adjustment of 2" water main, reconstruction of two water services, and extension of area inlet not previously in the contract. Adjustment of quantities due to actual field conditions. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared By: aa Signature Contracts Approval: /L- Signature City Staff Approval: City Official Approval: Amount $572,569.00 $0.00 $19,595.50 $19,595.50 $592,164.50 $0.00 $1,750.00 $1,750.00 $593,914.50 150 0/0 Change 0.00% 0.31% 0.31% 0 150 Eddie Zapata, Project Manager, CORR Tim Patin, President, Patin Construction, LLC -6"//z/// Date i/C/y Date 9,. 4112., Re-. SignDanny Halden, P.E., City Engineer, CORR Date L At R 1 E r4DLE Y - Assi s'ntirkr CITY enituva aEk Date nature �- l 1-o5-jos- /1141. -".--ROUND ROCK, TEAS ILW[16F. MOWN /1111.1,111. rev, 09/10 Contract Quantity Adjustment/Change Order Chan • e Order Data CO # 1-1 403 Briarwood 2' Water Main - Fix & Relay 1 Unit Price LS $750.00 Amount $750.00 Page 2 of 3 Contract Time Adjustment (Days) 0 CO # 1-2 Labor & Equipment for Water Service on Briarw000d 2 EA $250.00 $500.00 0 CO # 1-3 1002 Tanglewood - 3' x 3' x18" Area Inlet 1 LS $500.00 $500.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $1,750.00 0 Contract Quantity Adjustment/Change Order ROUND ROCK, TEXAS MM./ .1.41.0111. rwrnprein rev, 09/10 Bid Item # Item Descri tion and Chan ' e 5 Flexible Base unati Adjustment Data Unit 70 Unit Price ° h Y CY $40.00 Amount $2,800.00 Page 3 of 3 on ra Time Adjustment (Days) 0 9 P.C. Concrete Sidewalks 700 SF $4.00 $2,800.00 0 10 P.C. Concrete Driveways 1499 SF $4.50 $6,745.50 0 16 20 Adjust Water Line Services Pipe - 12" RCP (Class IV) 4 EA $300.00 $1,200.00 0 121 LF $50.00 $6,050.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $19,595.50 0