Loading...
CM-11-05-106ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: Department: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 1 with H.W. Lochner, Inc. — BWR Division (Lochner) for the Lestico Property Water and Wastewater Improvements Project. May 27, 2011 Utilities & Environmental Services Department Project Manager: Jeff Bell Item Summary: As per the R.O.W. agreement with Mr. Lestico, it is the City of Round Rock's responsibility to construct approximately 420 feet of 8 -inch SDR 26 wastewater line with 3 manholes and 90 feet of 8 -inch Ductile Iron restrained joint waterline with one fire hydrant assembly, servicing the Lestico property. It has become necessary to obtain additional Temporary Construction Easements (TCE) with two adjacent property owners and to survey the existing Public Utility Easements (PUE) for recording with Williamson County. Strategic Plan Relevance: Public Health and Safety Strategic Initiative Goal No. 27.0 "Ensure there is an adequate and safe water supply" Goal No. 28.0 "Protect public health and protect the environment through proper waste disposal" Cost: $2,530.00 Source of Funds: Round Rock Transportation Fund REV. 6/10/10 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: H.W. Lochner, Inc.- BWR Division (Lochner) ("Engineer") ADDRESS: 810 Hesters Crossing Road, Suite 225, Round Rock, Texas 78681 PROJECT: Lestico Property Water and Wastewater Improvements This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and H.W. Lochner, Inc.-BWR Division (Lochner) (Formerly Bucher, Willis & Ratliff Corporation (BWR)), hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 17th day of December, 2010 for the Lestico Property Water and Wastewater Improvements Project in the amount of $29,865.84; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $2,530.00 to a total of $32,395.84; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is atnended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be atnended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $2,530.00 the lump sum amount payable under the Contract for a total of $32,395.84, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Clwl (-e5 logP Supplemental Contract 0199.7156; 00222573 Rev.12/01 /08 84275 H.W. LOCHNE (f/n/a Bucher, By: INC.-BWR DIVISION (LOCHNER) llis & Rat ' orporation (BWR)) _YCO Tr e% i Zc v Date APPROVED AS TO FORM: LAURIE ft4DLey Ste is i Sheets, 6ty Attorney 11/461546.44 Ci AiAmattr Date Supplemental Contract 0199.7156; 00222573 2 Rev.12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services . A. Preliminary Phase Services a. Inland Geodetics (sub -consultant) will prepare a parcel plat with accompanying metes and bounds description for two (2) additional easement parcels with the Project limits as additional services to the original authorized proposal for two (2) parcels for a total of four (4) parcels. Project limits approximately encompass an area of 2.5 acres immediately adjacent to the intersection of Gattis School Road and Double Creek Road in Round Rock, TX. b. These services are considered taxable under Letter of Opinion from the Texas State Comptroller of Public Accounts dated May 14, 2008. The City of Round Rock shall submit to Lochner-BWR a Valid and Current Tax Exempt Resale Certificate for the purchase of taxable land surveying services as a component of their deliverables. If no Certificate is submitted to Lochner-BWR the proposed fee herein for all survey services shall be revised to include all applicable taxes. Additionally, the work performed by Inland Geodetics will be performed without benefit of title report as of this writing, therefore, there may be easements and other instruments that may affect the subject property. If City of Round furnished title report to Lochner-BWR then Inland Geodetics will address services accordingly. DATE: 12-27-2010 01-28-2011 03-09-2011 05-20-2011 06-10-2011 06-21-2011 06-28-2011 07-19-2011 August, 2011 September, 2011 September, 2011 October, 2011 January, 2012 February, 2012 ADDENDUM TO EXHIBIT C Work Schedule MILESTONE: Issuance of Notice to Proceed to Engineer Submittal of Survey to Engineer by Sub-Consultant/Surveyor 50% Design Submittal to City of Round Rock Public Works Department for Review 100% Design Submittal to City of Round Rock Public Works Department for Review. This submittal is contingent on the date for receiving the PUE registration/Exhibit numbers to include on the 100% construction documents. Additional boundary surveying services were required to complete two (2) additional easements, which resulted in delays to the original schedule. Plans and Construction Documents Approved by City of Round Rock Public Works Department First Public Notice Advertisement for Bid Second Public Notice Advertisement for Bid Project Bid Opening Notice of Award Issued by City Contractor Completes Contract Documents -- Secures Signatures, Bonding and Insurance Certificates City Executes Contract Documents City Issues Notice to Proceed; Conduct Pre -Construction Conference Substantial Construction Completion — Construction (90 Days) Final Construction Completion and Final Project Acceptance ADDENDUM TO EXHIBIT D Fee Schedule Cost Component - Hours Total Hours Project Principal 0 Project Manager 0 Project Engineer 0 Senior Technician 0 Cadd Technician 0 Admin/Clerical 0 Cost Component - Dollars Direct Direct Hourly Labor indirect Total Rate Cost Cost Cost Project Principal $ 55.17 $ - $ $ Sr. Project Manager $ 45.58 $ - $ $ Project Engineer $ 30.46 $ - $ $ Senior Technician $ 24.04 $ $ $ Cadd Technician $ 19.25 $ $ $ Admin/Clerical $ 15.14 $ - $ $ TOTALS $ $ $ Profit @ 10% $ Direct Expenses: Reproductions/Delivery Costs $ Mileage/Travel Costs $ Total Expenses $ BWR Lump Sum Fee Summary Direct Labor $ - Indirect Costs (179.89%) $ - Direct Expenses $ - Profit @ 10% $ SUBTOTAL - BWR Fee $ - Subconsultant Fee Summary Design Survey (lump sum - by Inland Geodetics) $ Boundary Survey (lump sum - by Inland Geodetics) $ - Supplemental - Boundary Survey (Add'I 2 Parcel/Plats + 10%) $ 2,530.00 SUBTOTAL - Surveying Sub Fee $ 2,530.00 TOTAL PROJECT FEES $ 2,530.00