Loading...
CM-11-06-119ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: Department: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 1 for Engineering Services with Cedillos & Wilson, LLC, for Rocking J Road and Harrell Parkway Water/Wastewater Extension Project. June 3, 2011 Utility and Environmental Services Department Project Manager: Eddie Zapata Item Summary: The engineering contract with Cedillos & Wilson, LLC was approved by City Manager on December 10, 2010. This contract is for design and construction phase services for the proposed extension of water and wastewater services to newly annexed areas along Rocking "J" Road and Harrell Parkway. This project will include new 8 -inch water and wastewater mains and required appurtenances. Supplemental Agreement No. 1 is for surveying additional water and wastewater easements along Old Settlers Boulevard. Strategic Plan Relevance: Goal No. 27: Ensure there is adequate, affordable, and safe water supply. Goal No. 28: Protect public health and protect the environment through proper waste disposal. Cost: $5,400 Source of Funds: Self -financed Water Construction and Self -financed Wastewater Construction REV. 6/10/10 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CEDILLOS & WILSON. L.L.C. ("Engineer") ADDRESS: 610 Brazos Street, Suite 107. Austin. Texas 78701 PROJECT: Rockin J Road and Harrell Parkway Water/Wastewater Extension This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Cedillos & Wilson, L.L.C., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of December, 2010 for the Rockin J Road and Harrell Parkway Water/Wastewater Extension Project in the amount of $33,420.95; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $5,400.00 to a total of $38,820.95; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2. Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. gxhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 11. ,Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $5,400.00 the lump sum amount payable under the Contract for a total of $38,820.95, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. 001- 1 1--cie -I 19 Supplemental Contract 0199.7155; 00223513 IVLOIROCIU & WW01HIARREL Rev.12/01/08 84275 CEDILLOS & WILSON, L.L.C. By: �7r e-Mal2D E . ils&r - ,P. L' . it wc.' k L Date CITY 01? ROUND ROCK By: Date Supplemental Contract 0199.7155; 00223513 WLOIROCKJ & WWOIHARREL. 7 AP VED T FORM: 41ditt Steph : f L. Sheets, City A torney Rev. 2/01/08 84275 ROCKING J ROAD AND HARRELL PARKWAY WATER/WASTEWATER EXTENSION EXHIBIT "B" SUPPLEMENTAL SERVICES TO BE PERFORMED BY THE ENGINEER Phase B — Design and Bid Documents Preparation 1. Prepare additional easements A. Prepare three (3) wastewater line easements for properties on E. Old Settlers Road. The permanent easements are 15' wide. In addition, surveyor will provide 20' wide temporary construction easements parallel to the permanent easements. B. Prepare one (1) water line easement on Rocking J Road. The permanent easement is 40' x 20'. ADDENDUM TO EXHIBIT "C" WORK SCHEDULE Date Milestone 12/13/2010 Notice to Proceed 12/20/2010 Begin survey 01/14/2010 Complete survey 01/17/2010 Start Design 02/07/2011 60% set submitted to Public Works for review 02/21/2011 Receive comments on 60% set 03/07/2011 90% set submitted to Public Works for review 03/14/2011 Receive comments on 90% set 03/21/2011 100% set submitted to Public Works for review 03/28/2011 Plans approved by Public Works 04/12/2011 Public Notice Advertising Bid 04/27/2011 Bids received at Public Works, 2008 Enterprise Drive 05/12/2011 City Council awards contract 05/20/2011 Contractor returns contract documents, bonds, and certificate of insurance 05/30/2011 Pre -construction Conference and Notice to Proceed 06/13/2011 Begin Construction 08/29/2011 Substantial completion 09/12/2011 Final project acceptance ADDENDUM TO EXHIBIT "D" FEE SCHEDULE ENGINEERING PHASE Direct Labor Overhead (105%) Total Labor & Overhead Fixed Profit. (10%) Cost TOTALS PREUMINARY DESIGN $1,350.00 $1,417.50 $2,767.50 $276.75 $3,044.25 DESIGN & BID DOCUMENTS $5,500.00 $5,775.00 $11,275.00 $1,127.50 $12,402.50 r CONSTRUCTION $3,000.00 $3,150.00 $6,150.00 $615.00 $6,765.00 TOTAL ENGINEERING COSTS $22,211,75 . DIRECT COSTS TOPOGRAPHIC SURVEY Cost INLAND GEODETIC $9,892.00 $9,892.00 PREPARE ADDITIONAL EASEMENTS ` (SUPPLEMENTAL #1) $5,400.00 $5,400.00 EXPENSES Rate quantity Cost 24 x 36 $3.50 240 $840.00 , $840.00 11 x 17 $0.28 r 240 $67.20 $67.20 8.5 x 11 $0.09 1500 $135.00 $135.00 Mileage $0.50 450 $225.00 $225.00 Postage $50.00 $50.00 TOTAL DIRECT COST $16,60920 TOTAL MAXIMUM COST $38,820.95