CM-11-06-126ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: Department: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 3 with Huggins/Seilers & Associates, L.P. for the North Mays Extension/Arterial "M" from Jeffery Way to Old Settlers Blvd. project. June 24, 2011 Transportation Project Manager: Lance Shellenberger Item Summary: The original contract with Huggins/Seiler and Associates, L.P. was approved for the North Mays Extension/Arterial "M" Project by the City Council on January 24, 2008, in the amount of $151,436.60 for the final design of this project. Supplemental Contract No. 1 was approved by the City Manager in the amount of $32,287.30 and extended the original project limits by 600 feet. With City Council approval on November 12, 2009, Supplemental Contract No. 2 added environmental work, changes to roadway sections, and continuous illumination at the cost of $87,408.80. The total contract price with Supplemental Contracts No. 1 and No. 2 is $271,132.70. The scope of Supplemental Contract No. 3 with Huggins/Seiler and Associates, L.P. is to produce as -built drawings using Chasco Constructors' and the City of Round Rock inspector's field sets to create a clean, legible set for future use. The cost of this supplemental contract is $5,510.40 bringing the total contract price to 276,643.10. Strategic Plan Relevance: Goal No. Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan. Cost: $5,510.40 Source of Funds: Round Rock Transportation Development Corporation Construction REV. 6/10/10 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER & ASSOCIATES, L.P. ("Engineer") ADDRESS: 116 East Main Street, Round Rock, TX 78664 PROJECT: North Mays Extension/Arterial "M" from Jeffrey Way to Old Settlers Blvd. This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, L.P., hereinafter called the `Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 241" day of January, 2008 for the North Mays Extension/Arterial "M" from Jeffrey Way to Old Settlers Blvd. Project in the amount of $144,625.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on June 19, 2009 to amend the scope of services and to increase the compensation by $32,287.30 to a total of $176,913.10; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on November 12, 2009 to amend the scope of services and to increase the compensation by $87,408.80 to a total of $264,321.90; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $5,510.40 to a total of $269,832.30; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $5,510.40 the lump sum amount payable under the Contract for a total of $269,832.30 as shown by the attached Addendum to Exhibit D. Supplemental Contract 0199.7035/ 225210 QM-It-Ole[24 Rev.12/01 /08 84275 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HUG/ INS/SEIL' : ASSOCIATES, L.P. By: . I' g`A bei(/ 14tAq iti.*, Preic n 1- 6-16- 11 F 6-16-11 Date STEV E NORU/OrD APPROVED AS TO FORM: (.72_ ( 0.iTY ivt.tAXe.2 J. Gayle-, Date Supplemental Contract 0199.7035/ 225210 2 Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services SCOPE OF SERVICES The engineering services to be performed include the following: • As -BUILT PLANS — H/SA will coordinate the creation and submittal of "As -Built" plans at the end of this construction project. These plans will be reproduced and distributed as directed by CORR. Page 1 of 1 ADDENDUM TO EXHIBIT C Work Schedule The work included in this contract will be completed by July 31, 2011 ADDENDUM TO EXHIBIT D FEE SCHEDULE Attached Behind This Page ADDENDUM TO EXHIBIT D City of Round Rock Mays Extension (Arterial M) Sheet 1 of 4 DIRECT OVERHEAD TOTAL FIXED FEE TOTAL LABOR COSTS BY FUNCTION CODE : LABOR 160.00% LABOR+OVHD 12.00% COST F.C. 110 ROUTE AND DESIGN STUDIES $ - $ - $ - $ - $ - F.C. 120 ENVIRONMENTAL STUDIES $ - $ - $ - $ - $ - F.C. 130 RIGHT OF WAY PLANS $ - $ - $ - $ - $ - F.C. 150 FIELD SURVEYS / MAPPING $ - $ - $ - $ - $ - F.C. 160 ROADWAY DESIGN CONTROLS $ - $ - $ - $ - $ - F.C. 161 DRAINAGE $ - $ - $ - $ - $ - F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION $ - $ - $ - $ - $ - F.C. 163 MISCELLANEOUS (ROADWAY) $ - $ - $ - $ - $ - F.C. 164 MANAGING CONTRACTED PROF. SERVICES $ - $ - S - $ - $ - F.C. 166 TRAFFIC MANAGEMENT SYSTEMS $ - $ - $ - $ - $ - F.C. 170 BRIDGE DESIGN $ - $ - $ - $ - $ - F.C. 190 PROJECT MANAGEMENT $ - $ - S $ - $ - F.C. 191 SUPPORT SERVICES $ - $ - $ - $ - $ - F.C. 310 CONSTRUCTION PROJECT SUPERVISION $ - $ - $ - $ - $ - F.C. 320 CONSTRUCTION INSPECTION $ - $ - $ - $ - $ - F.C. 330 CONSTRUCTION JOB CONTROL $ 1,868.00 $ 2,952.00 $ 4,920.00 $ 590.40 $ 5,510.40 TOTALS $ 1,968.00 $ 2,962.00 $ 4,920.00 $ 690.40 $ 6,610.40 DIRECT COSTS: EXPENSES: UNIT RATE QUANTITY TOTAL Final Myler Plots SF $ - - $ - Reproduc0on EA $ - - $ - Miteage Mite $ - - $ - Aidine Flights EA $ - - $ - PerDiem Day § - - $ - Mail & Deliveries EA $ - - $ - Advertise for Bids 1 0 $ - - $ - 0 $ - - $ - TOTAL EXPENSES $ - SUB -CONTRACTS: TASK TOTAL TOTAL SUB -CONTRACTS $ - TOTAL DIRECT COSTS $ - TOTAL COST 1 $ 5,510.40 H/SA MANHOUR SUMMARY Sheet 2 of 4 Mays Extension (Arterial M) City of Round Rock H/SA Contract No. 230.08.01 FC 110 ROUTE AND DESIGN STUDIES Manhours Rate Direct Labor Project Manager $46.00 $ Engineer V $46.00 $ Engr Spec V $46.00 $ Engineer III $42.00 $ Engr Spec III $42.00 $ Engineer I $38.00 $ Engr Tech 111 $34.00 $ Sub -total 0 $ FC 120 ENVIRONMENTAL STUDIES Manhours Rate Direct Labor Project Manager Engineer V Engr Spec V Engineer III Engr Spec III Engineer I Engr Tech III $46.00 $ $46.00 $ $46.00 $ $42.00 $ $42.00 $ $38.00 $ $34.00 $ Sub -total FC 130 RIGHT OF WAY PLANS Manhours Rate Direct Labor Project Manager $46.00 $ Engineer V $46.00 $ Engr Spec V $46.00 $ Engineer III $42.00 $ Engr Spec 111 $42.00 $ Engineer! $38.00 $ Engr Tech III $34.00 $ Sub -total 0 $ FC 150 FIELD SURVEYS/MAPPING Manhours Rate Direct Labor Project Manager $46.00 $ Engineer V $46.00 $ Engr Spec V $46.00 $ Engineer III $42.00 $ Engr Spec III $42.00 $ Engineer I $38.00 $ Engr Tech III $34.00 $ Sub -total 0 $ H/SA MANHOUR SUMMARY Sheet 3 of 4 Mays Extension (Arterial M) City of Round Rock H/SA Contract No. 230.08.01 FC 160 ROADWAY DESIGN CONTROLS Manhours Rate Direct Labor Project Manager $46.00 $ Engineer V $46.00 $ Engr Spec V $46.00 $ Engineer 111 $42.00 $ Engr Spec III $42.00 $ Engineer 1 $38.00 $ Engr Tech!!! $34.00 $ Sub -total $ FC 161 DRAINAGE Manhours Rate Direct Labor Project Manager $46.00 $ Engineer V $46.00 $ Engr Spec V $46.00 $ Engineer 111 $42.00 $ Engr Spec 111 $42.00 $ Engineer 1 $38.00 $ Engr Tech 111 $34.00 $ Sub -total $ FC 162 SIGNING, MARKINGS AND SIGNALIZATION Manhours Rate Direct Labor Project Manager Engineer V Engr Spec V Engineer 111 Engr Spec 111 Engineer 1 Engr Tech 111 $46.00 $ $46.00 $ $46.00 $ $42.00 $ $42.00 $ $38.00 $ $34.00 $ Sub -total FC 163 MISCELLANEOUS (ROADWAY) Manhours Rate Direct Labor Project Manager $46.00 $ Engineer V $46.00 $ Engr Spec V $46.00 $ Engineer 111 $42.00 $ Engr Spec 111 $42.00 $ Engineer 1 $38.00 $ Engr Tech 111 $34.00 $ Sub -total 0 $ FC 170 BRIDGE DESIGN Manhours Rate Direct Labor Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech 111 0 $34.00 $ • Sub -total 0 $ H/SA MANHOUR SUMMARY Sheet 4 of 4 Mays Extension (Arterial M) City of Round Rock H/SA Contract No. 230.08.01 FC 164 MANAGING CONTRACTED PROF. SERVICES Manhours Rate Direct Labor Project Manager 0 Engineer V 0 Engr Spec V 0 Engineer 111 0 Engr Spec III 0 Engineer I 0 Engr Tech III 0 $46.00 $46.00 $46.00 $42.00 $42.00 $38.00 $34.00 Sub -total 0 FC 165 TRAFFIC MANAGEMENT SYSTEMS Manhours Rate Direct Labor Project Manager Engineer V Engr Spec V Engineer 111 Engr Spec III Engineer 1 Engr Tech 111 Sub -total FC 190 PROJECT MANAGEMENT Project Manager Engineer V Engr Spec V Engineer III Engr Spec III Engineer I Engr Tech 111 0 0 0 0 0 0 0 0 $46.00 $ $46.00 $ $46.00 $ $42.00 $ $42.00 $ $38.00 $ $34.00 $ Manhours FC 191 SUPPORT SERVICES Project Manager Engineer V Engr Spec V Engineer III Engr Spec III Engineer I Engr Tech III Sub -total 0 Manhours Rate $46.00 $ $46.00 $ $46.00 $ $42.00 $ $42.00 $ $38.00 $ $34.00 $ Direct Labor Rate Direct Labor Sub -total PC 330 CONSTRUCTION JOB CONTROL Project Manager Engineer V Engr Spec V Engineer III Engr Spec 111 Engineer 1 Engr Tech 111 0 $46.00 $ o $46.00 $ 0 $46.00 $ O $42.00 $ O $42.00 $ 0 $38.00 $ 0 $34.00 $ 0 $ Manhours Rate Direct Labor 28 $46.00 $ O $46.00 $ O $46.00 $ O $42.00 $ 0 $42.00 $ O $38.00 $ - 20 $34.00 $ 680.00 46 $ 1,968.00 Sub -total 1,288.00