CM-11-07-146ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Item Caption: Approval Date: City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction for the East Main Street Park Wastewater Improvements Project. July 22, 2011 Department: Utility and Environmental Services Project Manager: Jeff Bell Item Summary: The original contract with Patin Construction was approved by the City Council on April 14, 2011, for the amount of $154,919.00. The original Contract was to remove and relocate 1,537 feet of existing wastewater lines with necessary manholes. Quantity Adjustment No. 1 adjusts the Contract to include two additional manholes and an additional 260 feet of 8 - inch wastewater line to connect an unknown service lateral to our relocated system. The cost of Quantity Adjustment No. 1 is $8,575.00. The combined cost of the original Contract and this Quantity Adjustment is $163,494.00, which is an increase of 5.25% of the Contract amount. Strategic Plan Relevance: Public Health and Safety Strategic Initiative Goal 28.0 "Protect public health and protect the environment through proper waste disposal" Cost: $8,575.00 Source of Funds: Self Financed Wastewater Construction REV. 6/10/10 rev. 09/10 Department: Utility Administration Project Name: Contract Quantity Adjustment/Change Order East Main Street Park Wastewater Improvements City Project ID Number: ww02emain Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 7/12/2011 1 Contractor encountered an existing unknown wastewater tie-in to existing main to be abandoned. Need to add 2 manholes and approximately 250 feet of additional 8 inch wastewater line to tie-in to relocated wastewater line in this project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustrnent(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s) : This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: City Staff Approval: City Official Approval: Amount $154,919.00 $0.00 $8,575.00 $8,575.00 $163,494.00 $163,494.00 % Change 0.00% 0.00% 0.00% Seventy-five calendar days Seventy-five calendar days Seventy-five calendar days Signatures and Approvals Jeff Bell Project Manager - City of Round Rock . Printed Name , Title and Company [ k. (4 , 41S r "C .-1 it' Printed Name, Title and Company GM -I 1-01- I'4to Printed Name and Tide Steve Norwood - City Manager.0 7/2e Printed Name and Title r.cl Date l q ty CGh7-0 Date Date ate /7` rev. 09/10 Contract Quantity Adjustment/Change Order Change Order Data Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0 $0.00 $0.00 0 $0.00 $0.0o 0 $0.00 $0.00 0 $0.0o $o.0o 0 $0.o0 $0.00 0 $0.00 $0.00 0 $0.o0 $0.00 0 $0.00 $0.00 0 $0.00 $o.00 0 $0.o0 $0.00 0 $0.00 $0.00 0 $0.00 $0.0o 0 $0.00 $0.00 0 $0.o0 $0.00 0 $0.00 $0.00 0 0 $0.00 $0.00 $0.00 $0.00 0 $o.00 $o.00 0 $o.00 $0.00 0 $0.00 $0.o0 0 $0.o0 $0.00 0 $0.00 $o.00 0 $0.00 $0.00 0 $o.0o $o.00 0 $o.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.0o 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $0.00 0 rev. 09/10 Contract Quantity Adjustment/Change Order Ouantitv Adiustinent Data Page 3 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 9 Fumish, Install, Maintain Rock Berm L.F. (40) $35.00 ($1,400.00) 11 Provide and install 8 -inch diameter SDR 26 PVC wastewater pipe L.F. 266 $25.00 $6,650.00 15 Remove existing wastewater manhole and replace with 5 foot bolted manhole including 6 inch drop service Ea. 1 $6,000.00 $6,000.00 17 Provide and install 4 foot diameter bolted wastewater manhole with ring and cover Ea. 1 $3,000.00 $3,000.00 25 Abandon existing 8 inch clay wastewater line by filling with grout or slurry LF. (175) $15.00 ($2,625.00) 32 Asphalt surface restoration including saw -cuts and asphalt removal to allow for smooth transition at limits of asphalt S.Y. (250) $12.00 ($3,000.00) 33 Remove and replace concrete sidewalk including saw -cutting limits S.Y. (6) $100.00 ($600.00) 34 Remove and replace concrete curb and gutter L.F. 20 $20.00 $400.00 35 Remove and replace concrete ribbon curb L.F. 10 $15.00 $150.00 0 $0.00 $0.00 0 $0.(0 $0.00 0 $0.00 $0.00 _ 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 . 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $8,575.00 0