Loading...
CM-11-07-154ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 2 with Patin Construction, LLC for the Little Oaks Subdivision Improvements Project. Approval Date: July 29, 2011 Department: Transportation Project Manager: Eddie Zapata Item Summary: The original construction contract with Patin Construction LLC was approved by the City Council on November 23, 2010, for the amount of $572,569. The improvements for the Little Oaks Subdivision included: installation of concrete ribbon curbs; widening and overlay of existing streets; re -grading of roadside ditches; storm sewer installation; replacement of driveways; and sidewalk improvements along RM 620., Quantity Adjustment/Change Order No. 1.adjusted the contract to known field quantities for additional flexible base; additional concrete sidewalk; additional concrete driveway; additional 12" storm sewer culvert; and additional water service adjustments. This change order was approved by the City Manager's office on June 1, 2011 at the cost of $21,345.50. The combined cost of the original construction contract and Quantity Adjustment/Change Order No. 1 is $593,914.50. Quantity Adjustment/Change Order No. 2 includes the following items that were not in the original scope of the project: extend sidewalks from the right-of-way line to the street curb and raise castings for paving. Also, a quantity adjustment is included to account for actual quantities provided. The cost of Quantity Adjustment/Change Order No. 2 is $20,096 which would bring the total contract amount to $614,010.50. Strategic Plan Relevance: Goal No. 28: Provide for effective management of storm water. Cost: $20,096 Source of Funds: General Self -Financed Construction REV. 6/10/10 "fill"."‘ --- ROUND ROCK, TEXAS PURPOSE R. NOR MMSMINS Y rev, 09/10 Department: Transportation Contract Quantity Adjustment/Change Order Project Name: Little Oaks Subdivision Improvements City Project ID Number TX03LOAK Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 7/5/2011 2 The following itmes were not included in the original scope and are being added by change order: extend sidewalks from right- of-way line to street curb and raise castings for paving. Also, a quantity adjustment is included to account for actual quantities. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared By: Contractor Approval: City Staff Approval: City Official Approval: • Signature Signature •na 11:411-111rrly/ Amount $572,569.00 $19,595.50 -$1,874.00 $17,721.50 $590,290.50 $1,750.00 $21,970.00 $23,720.00 $614,010.50 150 Calendar Days 0/0 Change 0.30% 3.72% 4.02% 0 Calendar Days 150 Calendar Days Eddie Zapata, Project Manager, CORR Tim Patin, President, Patin Construction, LLC Danny Halden, P.E., City Engineer, CORR 7/i /i/ Date Date 7/ /i Date Signature -Di- Steve Norwood, City Manager, CORR Date ROUND ROCK, TEXAS R:RPIIL: Nle11OFl ..IO..IIYIY rev, 09/10 Contract Quantity Adjustment/Change Order Chan • e Order Data Page 2 of 3 Bid Item # CO # 2-1 CO # 2-2 CO # 2-3 CO # 2-4 CO # 2-5 Item Descri ' tion and Chan e Relocate 12" & 18" Sloped Enos for Culvert Extension Raise Manhole for Paving Raise Water Valve Casting Concrete Sidewalk Culverts Inlet Modi 'cations and Regrade Ditch on Tanglewood Unit 8 7 8 8 1 EA EA EA EA Unit Price $100.00 350.00 Amount $800.00 2 450.00 LS 250.00 $1,890.00 $1,600.00 2 000.00 15 120.00 $1,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 OTALS: 0 0 0 0 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $21,970.00 0 1 Contract Quantity Adjustment/Change Order ROUND ROCK, TEXAS .. 0.USE w.ssa.aw r oWnnyr rev, 09/10 Bid Item # Item Descri ' tion and Chan • e unati Ad'ustment Data Unit Price Amount Page 3 of 3 Time Adjustment (Days) HMAC Pavement, Type D 9 P.C. Concrete Sidewalks 219 SF $4.00 $876.00 0 20 Pipe - 12" RCP (Class IV) 138 LF $50.00 $6,900.00 0 21 Pipe - 18" RCP (Class IV) 43 LF $75.00 $3,225.00 0 33 Rock Berm -20 LF $40.00 -$800.00 0 B-1 Colored Concrete -215 CY $36.00 - $7,740.00 0 B-2 Concrete Stamping -800 SF $6.00 - $4,800.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -$1,874.00 0