CM-11-08-155ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. Item Caption: Approval Date: City Manager Approval Summary Sheet Consider executing Supplemental Contract No. 1 with Camp Dresser & McKee, Inc. for the Water Treatment Plant -Electrical Mapping and I&C System Architecture Review Project. August 5, 2011 Department: Utilities and Environmental Services Project Manager: Jeff Bell Item Summary: Professional Services provided under this contract will included field verification surveys of the WTP overall electrical system, with transformers, voltage, amperage and short circuit interrupting ratings, as well as where each of the equipment is being fed from and what each item of equipment is feeding. This information will be delivered as a spreadsheet and map, both in electronic and hard copy format. In addition, the Camp Dresser & McKee, Inc. (CDM) is to prepare a technical memorandum detailing recommendations for enhancing the level of redundancy of the control network and for any improvements in the system architecture and will include, as appropriate, details, designs and opinions of probable cost for making these enhancements. During this process it has become necessary to conduct an additional two day onsite field assessment to verify the actual installation of the Fiber Optic Network. As part of this Supplemental Agreement, CDM will produce an updated as -built Fiber Optic Architecture drawing of the current configuration. Once the as -built Fiber Optic Architecture drawing is complete, CDM will conduct an additional meeting with the City with recommendations for enhancing the level of redundancy of the control system network, including opinions of probable construction costs for making these enhancements to the existing WTP Control System Network. This Supplemental Agreement will increase the original contract of $30,515 by $11,955 for a total contract amount of $40,470. Strategic Plan Relevance: Public Health and Safety Strategic Initiative Goal 27.0 "Ensure there is an adequate, affordable and safe water supply" Cost: $11,955 Source of Funds: Self- Financed Water Construction REV. 6/10/10 ROUND ROCK, TEXAS PURPOSE. PASSi0K PROSPERITY Information for Prof - ----- --- ----- ---1-P•--•--..--. ,�.�...,........� Project Information Project Name Water Treatment Plant - Electrical System Mapping and I&C System Architecture Review Project Project Description Conduct a two day onsite field assessment of actual installation of the Fiber Optic Network and provide an updated as built Fiber Optic Architecture drawing. Project ID Number WAO5WTPRHB City of Round Rock Staff information Owner's Representative Jeff Bell — Project Manager Phone Mobile 512-801-4461 Fax 512-218-5563 Email Address jbell@round-rock.tx.us Proposed Council Date 8-26-11 Professional Service Provider's Information Name of Company CDM Name of the Principal Signing the Contract/Title Steven Lynk, P.E., BCEE Associate Business Address (address for all notices to be mailed) 12357-A Riata Trace Parkway, Suite 210 Austin, TX 78727 Name of Project Manager Ana Marie Karamalegos, P.E. Title Project Manager Phone Number 512-346-1100 Fax Number 512-345-1483 Email Address LynkSV@cdm.com Work Product Information Original Project Approval Date April 1, 2011 Original Project Agreement Period 121 Calendar Days Original Project Cost $ 30,515.00 Supplemental Agreement Termination Date November 30, 2011 Supplemental Agreement Cost $11,955.00 Changes to Article 2 — Scope of Services to be Provided by Engineer See Exhibit B Changes to Article 3 — Agreement Period 4 Months Changes to Article 4 — Compensation See Exhibit D Amendment to the Agreement — Detail Scope of Work See Exhibit B Note: Please include all previous Supplemental Agreement information in the form (you may have to expand this form if you have more than one supplemental agreement). Revision 6/10 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CAMP DRESSER & MCKEE, INC. ("Engineer") ADDRESS: 12357-A Riata Trace Parkway, Suite 210, Austin, TX 78727 PROJECT: Water Treatment Plant — Electrical System Mapping and I&C System Architecture Review This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Camp Dresser & Mckee, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 1st day of April, 2011 for the Water Treatment Plant — Electrical System Mapping and I&C System Architecture Review Project in the amount of $30,515.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,955.00 to a total of $42,470.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Il. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $11,955.00 the lump sum amount payable under the Contract for a total of $42,470.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rcv.12/01/08 0199.7157; 00228716 84275 \A05WYPRHB U>II-[Ss-- CAMP DRES�$ER & KEE, INC. By: Date Ad- -31 201/ CITY OF ROU By: DFa?// Date Supplemental Contract 0199.7157; 00228716 WAO5 WTPRHB STAVE MoRwooD Crr�r v i4N.AER. 2 APP ' VED S T , FORM: Step L. Sheets, City Attorney Rev.12/0 I /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: Services under this contract include: 1. Review and assess existing electrical record drawings and electrical information available, 2. Conduct field verification surveys as required to prepare overall plant electrical system one - line diagram drawings that will include the entire plant electrical distribution system. The overall plant electrical distribution one -line diagram will be drafted using ACAD. The electrical system one -line diagrams will show the incoming main utility service transformers and everything downstream - to the low voltage power/lighting panelboards. The one -line diagrams will convey the equipment identification, buss amperage, voltage, and short circuit interrupting ratings, as well as where each of the equipment is being fed from and what each equipment is feeding. 3. Provide recommendations to address plant staffs concerns relative to the fiber optic network associated with the control system. To accomplish this, immediately following notice to proceed, CDM will request from the Owner the most recent system architecture diagrams and any other pertinent information that may be available. Plant staff has reported that some of these drawings may be out of date. Therefore, upon receipt of this information from the Owner, CDM shall conduct an onsite field assessment to confirm the accuracy of the documentation and to gain a more thorough understanding of the plant staff's concerns. In addition, CDM shall conduct an additional two day onsite field assessment to verify the actual installation of the Fiber Optic Network. Utilizing the information provided by the Owner and the additional onsite field assessment, CDM shall generate an updated as -built Fiber Optic Architecture drawing. Once the as -built Fiber Optic Architecture drawing is complete, CDM will conduct an additional meeting with the Owner for review purposes. Subsequent to the field investigation, CDM will provide a technical memorandum detailing recommendations for enhancing the level of redundancy of the control system network. The technical memorandum shall include details of the current configuration, recommendations for a revised system architecture diagram as appropriate and opinions of probable construction costs for making these enhancements. Included with the Technical memorandum shall be the updated as -built Fiber Optic Architecture drawing. ADDENDUM TO EXHIBIT C Work Schedule The Work Schedule for this project will be completed as follows: Original Notice to Proceed Date Notice to Proceed for Supplemental Agreement Design Services Phase * Contingent upon others. April 1, 2011 August 26, 2011* November 30, 2011 * ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Labor Total Cost Components Hours Hourly Rate Total Cost Senior Engineer 26 200 $5,200.00 Project Engineer 5 150 $750.00 EIT 12 85 $1,020.00 Eng Tech 36 105 $3,780.00 Admin/Clerical 4 75 $300.00 Reimbursable Lodging/Meals $325.00 Mileage $300.00 Light Pen $280.00 Total Expenses Subconsultant Fee Subconsultant Fee TOTAL PROJECT FEES $11,050.00 $905.00 $0.00 $11,955.00