CM-11-08-162ROUND ROCK, TEXAS PURPOSE PASSION. PROSPERITY Agenda Item No. City Council Agenda Summary Sheet Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Agenda Caption: Order No. 2 with Chasco Constructors for the North Mays Extension Project. Meeting Date: August 25, 2011 Department: Transportation Staff Person making presentation: Michael Thane, P.E. Director of Utilities and Environmental Services Item Summary: The original contract with Chasco Constructors was approved by the City Council on October 28, 2010, to straighten and widen North Mays Street to provide better access to businesses and the City of Round Rock Police Department. The cost of the approved bid was $2,147,473.80. Quantity Adjustment/Change Order No. 1 was approved on April 15, 2011, at the cost of $20,261 to make needed changes due to unknown existing infrastructure adjustments and the addition of countdown peds for the project. Quantity Adjustment/Change Order No. 2 is needed to lower an existing waterline to accommodate the relocation of a curb inlet and extension of a 24" RCP. Original design of the driveway does not allow all truck ingress and egress to the site. Matting for slope protection is needed until vegetation can be established. The cost of Quantity Adjustment/Change Order No. 2 is $30,893.10. The total amount of the contract with Quantity Adjustment/Change Order No. 2 with Chasco Constructors would be $2,198,627.90. Strategic Plan Relevance: Goal No. 26: Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan. Cost: $30,983.10 Source of Funds: Round Rock Transportation Development Corporation Construction Date of Public Hearing : N/A Recommended Action: Staff recommends City Council approval. r-ROUNDOCK, TEXAS nw ►.us..mnc rev, 09/10 Department: Transportation Contract Quantity Adjustment/Change Order Project Name: North Mays Street Extension City Project ID Number TX01ARTM Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 7/22/2011 2 Existing waterline needs to be lowered to accomodate relocation of curb inlet and extension of 24" RCP. Original design at driveway would not allow all truck ingress and egress to site. Matting for slope protection is needed until vegetation can be established. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Amount $2,147,473.80 $1,600.00 $0.00 $1,600.00 $2,149,073.80 $18,661.00 $30,893.10 $49,554.10 0/0 Change 0.87% 1.44% 2.31% 300 Calendar Days 316 Calendar Days 321 Calendar Days Prepared By: Contractor Approval: City Staff Approval: City Official Approval: Signature Lance Shellenberger, Project Manager, CORR Charles J. Glace, Jr., President, Chasco Constructors Date 6.1.1i Date Danny Halden, P.E., City Engineer, CORR .� f ignature GYI-1, I -0g-I62 Alap McGrertorNerfer, CORR 519 1JoP.ulibp,Glil M�1AC�tZ Date Contract Quantity Adjustment/Change Order ROUND ROCK TEXAS KAMM' PASSION rIPIPIRM rev, 09/10 Chan • e Order Data Page 2 of 3 Bid Item # Item Descri • tion and Chan ' e Unit Price Amount Contract Time Adjustment (Days) Lower water line at Curb Inlet CI -4 Demo & raise north driveway at A-1 Freeman, approximate Station 101+00. Matting on slopes. EA EA 1 $6,400.00 $21,530.00 $6,400.00 $21,530.00 S.Y. 1,743 $1.70 $2,963.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $30,893.10 5 1K1111-ROUND ROCK, TEXAS AMM P.SgR PROWRIGIY rev, 09/10 Contract Quantity Adjustment/Change Order unati Adjustment Data Page 3 of 3 Bid Item # Item Descri • tion and Chan ' e Unit Unit Price TOTALS: