Loading...
CM-11-08-164► ,-lI-C,; '!&'F c2.) City Manager Approval Form Item Caption: Consider executing a Right of Entry with the City of Cedar Park regarding RM 1431 Reconstruction Projeci Approval Date: August 19, 2011 Department Name: Transportation Department Project Manager: Bill Stablein Assigned Attorney: Steve Sheets Item Summary: The City of Cedar Park and the Texas Department of Transportation are designing a road construction project on RM 1431 between Parmet Lane and Sam Bass Road. The current four -lane undivided roadway with a rural cross-section will be reconstructed to six -lane roadway with raised median, curb and gutter, drainage facilities, and street lighting. The City of Cedar Park is requesting permission for its employees, Klotz Associates, and/or their sub -consultants to enter City of Round Rock property for field surveying and environmental work only associated with this project. No. of Originals Submitted: Two Project Name: RM 1431 Reconstruction Project (City of Cedar Park) Cost: N/A Source of Funds: Select Source Fund Source of Funds (if applicable): Select Source Fund Account Number. Finance Director Approval: gxr Department Director Approval: 4-'1 Date: Date: ?hilt? **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP 1-1 I I Budget N/A OK N/A OK Purchasing El Accounting El El NIA OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 CEDAR PARK July 20, 2011 CITY OF ROUND ROCK 221 E MAIN ST ROUND ROCK,TX 78664-5299 Re: RM 1431 (Parmer Lane to Sam Bass Rd.) Reconstruction Project — Right of Entry Request Parcel ID: R329746 Dear Sir or Madam, The City of Cedar Park, in association with the Texas Dept. of Transportation, is moving forward with the design of the RM 1431 (Parmer Ln. to Sam Bass Rd.) reconstruction project. RM 1431 is currently a four -lane undivided roadway with a rural cross-section and will be reconstructed to a 6 -lane roadway with a raised median, curb and gutter, drainage facilities, and street lighting. The project will also include environmental work along the RM 1431 corridor from 183A to Sam Bass Rd. in anticipation of future roadway reconstruction projects. The City has retained Klotz Associates to assist in the design and permitting of the project. The City of Cedar Park requests your permission for its employees and/or the above listed consultants (and their subconsultants) to enter your property for field surveying and environmental work only. If you concur with this right -of -entry, please sign in the space provided below and return in the enclosed envelope at your earliest convenience. You may also fax the letter back to 512.258.6083 - Attn. Garret Bonn. Your prompt response within two (2) weeks of receipt of this letter is appreciated as this is a time-sensitve matter. An extra copy of this letter is provided for your records. Please call Mr. Garret Bonn at 512.401.5356 or email at garret.bonn@u,cedarparktx.us with any questions concerning this request. As the design progresses, you will be kept updated as to status and timing of the project, including a public meeting (open house) tentatively scheduled for later this year. Sincerely, AGREED TO RIGHT -OF -ENTRY FOR FIELD SURVEY AND ENV. WORK: BY: Garret Bonn, P.E. SIGNATURE Senior Engineer �V1-ll-oY-W4 51EvE NORVVoc t PRINT N 4E DATE Sly— lc -544 PHONE 600 N. Bell Blvd I Cedar Park, TX 78613 I Office (512) 401-5000 I Fax (512) 258-6083 1 www.cedarparktx.us