CM-11-08-172.ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY
Item Caption:
Approval Date:
Department Name:
City Manager Ap.royal Form
CI;)
Consider executing a construction contract with S&G Contracting, Inc. for the Memorial Park Pedestrian a
August 19, 2011
Parks and Recreation Department
Project Manager: David Buzzell
Assigned Attorney:
J. Kay Gayle
Item Summary:
This item will allow the City to enter into an agreement with S&G Contracting, Inc. to repair the pedestrian bridge at Memorial
Park. The 100' long pedestrian bridge across Brushy Creek was damaged in the flood in September 2010. Staff worked with a
structural engineer, metal fabricator and our insurance provider to evaluate how the bridge should be repaired. The structural
engineer and metal fabricator concluded that the bridge could be lifted in-place and repaired. Our insurance provider worked
with contractors to develop a cost of the work and that was the amounted finally paid to the City for repair of the bridge.
The project will include jacking the bridge off of the piers/abutments, removing/replacing an approximately 35' section of the
bridge beam, repairing the bridge guardrails, replacing the wood decking and re -anchoring the bridge to the abutments.
Staff recommends approval of the item to repair this important pedestrian bridge in Memorial Park.
No. of Originals Submitted: 0
Project Name: Memorial Park Pedestrian Bridge Repair Project
Cost: $33,200.00
Source of Funds: General Self -Financed Construction
Source of Funds (if applicable): Select Source Fund
Account Number: pkllrrpl_bridge
Finance Director Approval: LO for C. Delaney Date: 8-16-11
Department Director Approval:
Date:
"Electronic signature by the Director is acceptable. Please only submit ONE approval form per item.
CIP ❑ ri Budget
El
N/A OK N/A OK
Purchasing IJ lJ Accounting
N/A OK N/A OK
ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGEN
D
111 El
/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL
REV. 6/20/11
BIDS EXTENDED AND CHECKED
O
(512) 218-5540
Ud
0
Westar Construction
Bid Bond?
00
GA
0
z
F W
zU
0
z
Patin Construction
Bid Bond? Y
0
O
0
o
N
6R
F W
zU
Oa
O
O
O
0
N
69
Bid Bond? Y
00
0
O
O
O
0
o
0
0
0)
u
L
0
O
0)
a�
w
u
0
O
‘14,
0)
Bid Bond? Y
00
0
U
O
O
00
M
00
00
z�
Oa
0
O
o;
00
00
00
col
0
0
0
00
01
S&G Contracting
0
0
0
0
E
0
00
0
0)
0
0
0
0
DATE: 8/9/11
Bid Bond? Y
00
O
0
0
0
O
O
00
69
Oa
F
O
O
O
0
00
N
69
0.
b
•�
2
E • 0)
I24
0
O
O
0
'4
(Base Bid and Add/Alternate #1)
bidtab/bidtab