Loading...
CM-11-08-172.ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Item Caption: Approval Date: Department Name: City Manager Ap.royal Form CI;) Consider executing a construction contract with S&G Contracting, Inc. for the Memorial Park Pedestrian a August 19, 2011 Parks and Recreation Department Project Manager: David Buzzell Assigned Attorney: J. Kay Gayle Item Summary: This item will allow the City to enter into an agreement with S&G Contracting, Inc. to repair the pedestrian bridge at Memorial Park. The 100' long pedestrian bridge across Brushy Creek was damaged in the flood in September 2010. Staff worked with a structural engineer, metal fabricator and our insurance provider to evaluate how the bridge should be repaired. The structural engineer and metal fabricator concluded that the bridge could be lifted in-place and repaired. Our insurance provider worked with contractors to develop a cost of the work and that was the amounted finally paid to the City for repair of the bridge. The project will include jacking the bridge off of the piers/abutments, removing/replacing an approximately 35' section of the bridge beam, repairing the bridge guardrails, replacing the wood decking and re -anchoring the bridge to the abutments. Staff recommends approval of the item to repair this important pedestrian bridge in Memorial Park. No. of Originals Submitted: 0 Project Name: Memorial Park Pedestrian Bridge Repair Project Cost: $33,200.00 Source of Funds: General Self -Financed Construction Source of Funds (if applicable): Select Source Fund Account Number: pkllrrpl_bridge Finance Director Approval: LO for C. Delaney Date: 8-16-11 Department Director Approval: Date: "Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. CIP ❑ ri Budget El N/A OK N/A OK Purchasing IJ lJ Accounting N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGEN D 111 El /OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 BIDS EXTENDED AND CHECKED O (512) 218-5540 Ud 0 Westar Construction Bid Bond? 00 GA 0 z F W zU 0 z Patin Construction Bid Bond? Y 0 O 0 o N 6R F W zU Oa O O O 0 N 69 Bid Bond? Y 00 0 O O O 0 o 0 0 0) u L 0 O 0) a� w u 0 O ‘14, 0) Bid Bond? Y 00 0 U O O 00 M 00 00 z� Oa 0 O o; 00 00 00 col 0 0 0 00 01 S&G Contracting 0 0 0 0 E 0 00 0 0) 0 0 0 0 DATE: 8/9/11 Bid Bond? Y 00 O 0 0 0 O O 00 69 Oa F O O O 0 00 N 69 0. b •� 2 E • 0) I24 0 O O 0 '4 (Base Bid and Add/Alternate #1) bidtab/bidtab