Loading...
CM-11-08-175Item Caption: Approval Date: Department Name: Project Manager: Assigned Attorney: City Manager Approval Form (L) Consider executing Quantity Adjustment/Change Order No. 2 with Enviro Remediation for the 2007-2008 Wastewater Collection System Rehabilitation Project. August 26, 2011 Utilities and Environmental Services Department Eddie Zapata Steve Sheets Item Summary: The bid opening for the 2007 — 2008 Wastewater Collection System Rehabilitation- Basins BC23/Z, LC18/Z, LC19/Z, 0C25/Z, 0C26/Z, 0C27/Z, and 0C29Z was held on September 28, 2010. Two sealed bids were received. This project will correct wastewater system defects previously identified. The areas of rehabilitation include neighborhoods in the vicinity of Bowman Road, Sam Bass Road, RM 620, and McNeil Road. Quantity Adjustment/Change Order No. 1 was needed to make necessary repairs to an existing 8" wastewater main crossing Onion Creek. The need for the repair was unknown prior to the bidding of this original contract and the repair was urgently needed to protect the health, safety and welfare of the public. Quantity Adjustment/Change Order No. 2 is needed to make necessary sag repairs to an existing 8" wastewater main (LR 2012) along Tower Street and a point repair on an existing 8" wastewater main in Oakridge Drive (PR 1006). The repair is urgently needed to protect the health, safety and welfare of the public. No. of Originals Submitted: 2 Project Name: 2007-2008 Wastewater Collection System Rehabilitation Project Cost: $13,920.00 Source of Funds: Self -Financed Wastewater Construction Source of Funds (if applicable): Select Source Fund Account Number: WW05RHB78 Finance Director Approval: Mewl( Date: Department Director Approval: ,' Date: t% G( **Electronic signature by the ' 'rector is acceptable. Please only submit ONE approval form per item. ** CIP N/A OK Budget El El N/A OK Purchasing N/A OK Accounting El El N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Po XJND ROCK, TEXAS n:.ros 1.vKuv PWCAPVwm rev, 06/11 Contract Quantity Adjustment/Change Order Department: Utility and Environmental Services Pagel of4 City Project ID Number WW05RHB78 Justification Change Order/Quantity Adjustment No. 2 Quantity Adjustment / Change Order #2 is needed for sag repair to 8" wastewater main (Line Repair 2013) along Tower Drive and point repair in Oakridge Drive. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount $716,552.20 $17,871.00 $3,800.00 $21,671.00 $738,223.20 $11,050.00 $10,120.00 $21,170.00 0/0 Change 1.50% 1.37% 2.87% $759,393.20 $42,841.00 225 Calendar Days 0 Calendar Days 30 Calendar Days 255 Calendar Days Printed Contractor Company Name: 0,* -1 t15 1PR4111*"...."--' ROUNn ROM, TEXAS ISI/0¢ POVA/O4 MAMMY rev, 06/11 For Contractor: For City of Round Rock: Contract Quantity Adjustment/Change Order S's n.4•41.7orrA,,, Air - i► Signature Printed Name, Title Page2of4 7 -ow 1/ Date Printed Name, Title I Date ROUNp R(1cx, TEXAS nV.rov n 0+10N ►.awrrm rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: h Page3of4 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) CO 2-1 Sag Repair including vegetation and Fence Repair LF 92 $110.00 $10,120.00 30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ROUND ROCK, MCAS RIDwrr PAANK V nurwrtm rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Page4of4 Bid Item # 53 quantity Item Description JOB 1006: Open Cut Replace 13 LF of 8" PVC with 8" PVC-SDR26 Adjustment Unit EA Data Qty. 1 Unit Price $3,800.00 Amount $3,800.00 Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00