Loading...
CM-11-09-187ROUND ROCK, TEXAS City Manager Approval Form Consider executing Construction Contract Change Order No. 24 wth TxDOT for FM 1460 (Old Settlers Boulevard to U.S. Item Caption: Hip�+Way 79) projert Approval Date: September 9, 2011 Department Name: Transportation Department Project Manager: Bill Stablein Assigned Attorney: Steve Sheets Item Summary: The City of Round Rock entered into an agreement with Texas Department of Transportation on January 22, 2009, to jointly fund and participate in the design and construction of FM 1460/A.W. Grimes boulevard from U.S. 79 north to Old Settlers Boulevard. As part of the construction contract, Old Settlers Boulevard East was included from A.W. Grimes Boulevard east to Fairview Drive. Construction Contract Change Order No. 24 creates an item to pay for partial removal of a section of installed pedestrian rail at Agarita Trail and FM 1460. It was discovered due to the side street grade that the pedestrian rail impeded sight distance. Items for Ride Quality Bonus/Penalty payments on Old Settler's Boulevard (City of Round Rock) are included also because they are part of the original state contract. No. of Originals Submitted: Two Project Name: FM 1460 Cost: $2,360.76 Source of Funds: RR Trans Dev Corp Construction Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: Department Director Approval: Date: Date: / L I **Electronic signature by the Direct • is acceptable. Please only submit ONE approval form per item. ** CIP I I ❑ Budget N/A OK CI El N/A OK Purchasing ❑❑ N/A OK Accounting C N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 024 Third Party Funding Notification Sheet This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT, and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1. Outside funding provided by: City of Round Rock (Outside Entity's Legal Name) 2. Type of outside funding agreement for this change: ( Existing E Amended [ Check one ] E New 3. Indicate the type and amount of funding: I— Fixed Price (Lump Sum) (Estimated Amount $2,292.00 I Actual Cost (a) Contract Items (Bid Items): $2,292.00 (b) E&C*: (a) x 3.00 = 68.74. enter % (c) Indirect Cost**: (a + b) x = 0 enter % TOTAL sit 62i 3va• 74, CCSJ: 2211-02-015 Project: STP 2005(921) Highway: FM 1460 County: Williamson District: Austin Contract 05093202 Number: Use as needed: I hereby acknowledge notification of the modifications covered by this Change Order. Typed/Printed Name Typed/Printed Title s`TEvE tkr?uicob Com; E *The percentage (%) for E&C (Engineering and Contingencies) charges varies from project to project depending on the contract amount of the project. Projects with a higher contract amount will have a lower rate of E&C charge. For a specific project, E&C rate (%) can be derived from the cost of "Engineering and Contingencies" in the "Estimated Cost" of the project. ** Use the statewide district rate as established by Finance Division each year. This line 3(c) is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Typed/Printed Name: Date TXDOT Form 2146-AFA (Rev. 7/2007) Page 1 of 1 lil 1 t'I I -0 lr'Wi Contact/Help Print Form