Loading...
CM-11-09-19719 CM-11—oa --193_ City Manager Approval Form 1 :....................r» Consider executing Quantity Adjustment/Change Order No. 3 with Enviro Remediation for the 2007-2008 Item Caption: Wastewater Collection System Rehabilitation Project. Approval Date: September 23, 2011 Department Name: Utilities and Environmental Services Department Project Manager: Eddie Zapata Assigned Attorney: Steve Sheets Item Summary: The 2007 — 2008 Wastewater Collection System Rehabilitation of Basins BC23/Z, LC18/Z, LC19/Z, 0C25/Z, 0C26/Z, 0C27/Z, and 0C29Z is to correct wastewater system defects previously identified. The areas of rehabilitation include neighborhoods in the vicinity of Bowman Road, Sam Bass Road, RM 620, and McNeil Road. Quantity Adjustment/Change Order No. 1 was needed to make necessary repairs to an existing 8" wastewater main crossing Onion Creek. The need for the repair was unknown prior to the bidding of this original contract and the repair is urgently needed to protect the health, safety and welfare of the public. Quantity Adjustment/Change Order No. 2 was needed to make necessary sag repairs to an existing 8" wastewater main (LR 2012) along Tower Street and a point repair on an existing 8" wastewater main in Oakridge Drive (PR 1006). The repair is urgently needed to protect the health, safety and welfare of the public. Quantity Adjustment/Change Order No. 3 includes items that were not in the original scope of the project. These items include the installation of interior drops in manholes and a cut out of an existing manhole invert in order to allow access for the camera pni iinmpnt The rnct of /liiantity Arliiictment/rhanae rlrrlar Nn '1 R77 whirh wniilri hrina the tntal rnntrart amnuint to No. of Originals Submitted: 2 Project Name: 2007-2008 Wastewater Collection System Rehabilitation Project Cost: $33,872.00 Source of Funds: Self -Financed Wastewater Construction Source of Funds (if applicable): Select Source Fund Account Number: WW05RHB78 Finance Director Approval: Cheryl Delaney Date: 9/20/11 Department Director Approval: Michael Thane Date: 9/20/11 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP 1.1 Budget N/A OK N/A OK Purchasing El El Accounting ID El N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Item Caption: Consider executing Quantity Adjustment/Change Order No. 3 with Enviro Remediation for the 2007-2008 Wastewater Collection System Rehabilitation Project. Item Summary Continued: Quantity Adjustment/Change Order No. 3 includes items that were not in the original scope of the project. These items include the installation of interior drops in manholes and a cut out of an existing manhole invert in order to allow access for the camera equipment. The cost of Quantity Adjustment/Change Order No. 3 is $33,872 which would bring the total contract amount to $793,265.20. :a;ea oi (s)Japio a6ueyD Ieol :Japio a6ueto sly' :(s)Japio a6uegD snolnaad Total Contract Price with Quantity Adjustment(s): :(s);uawlsn[pv Aliluena Ill :;uamsn[pv 1l}uenb siyl Previous Quantity Adjustment(s): '.11 N N O -I'D r V 0 O 4. V V W N O O O :aaiad 1De.quoD leul6U0 _ a 0 re n W O N 7 m w w oVo+ uoge3Usn[ W Utility and Environmental Services .4;r Contract Quantity Adjustment/Change Order :aope4uop aoj aIT!i'aweN pa4uud Contract Quantity Adjustment/Change Order EU CdpN O co :•oN .iapio a6ueyo/•IPV •uenb :aweN pa[ad Contract Quantity Adjustment/Change Order • n O W N Item # Item Description CO 3-1 Interior Drop in Manhole Cut out pipe in invert to fit camera D [n C 7 01 co e uraer uata Contract lime Adjustment INI Unit Price Amount (Days) 4 $800.00 $3,200.00 N O O O O -EA- Op 0 :R Op 0 -(01- Op 0 .— Op 0 - Op 0 ifs Op 0 -EA- pO 0 - pO 0 ifs pO 0 - pO 0 - pO 0 - Op 0 -EA- pO 0 -EA- pO 0 :R pO 0 AA pO 0 i!4 pO 0 F+ O O pO 0 :•oN .iapio a6ueyo/•IPV •uenb :aweN pa[ad Contract Quantity Adjustment/Change Order • 0 a g 2 1,3 0 0 �' 8 8 0 8 0 8 0 8 0 8 0 8 0 Contract Quantity Adjustment/Change Order v C0 (D A 0 CD VI [ 33 1 30 tN0 V W t0 00 W r co. M 0 0 It Rock Rip -Rap 1 Relocate storage shed Repair AC waterline 1 Rock excavation Waterline lowering Flowable Fill 'Tree replacement planting Seeding/sodding to match existing Remove and replace concrete paving Install 48" shallow manhole, 0'-4' Deep, including Biotech Armor Remove 8t replace 48" Dia. Manhole, extra depth (excess of 6') Biotech Armor Additive Item Descri . tion Remove 8t replace 48" Dia. Manhole, 0'- 6' Deep Biotech Armor Additive Q D D Q W 'r11 D sq TSI D I D C W -8 F= -r 255 5743 28 w .0 o0 •C . ON (11 b O $857.00 W CO 0 0 0 O - 0 O W VVI 0 0 O $28.00 . r O r b O $8.00 4i1• N O O $3,544.00 41 O b O 3 rr N V N .1 O R b O ' N tOJI 0 01 Co al 0 W' Cp Ul 0 0 V Op 0 W Vl Op 0 V : • Op 0 1 ►- r p i 0 tin t0 p 0 CO 9p 0 -$3,544.00 4#4. N 2 O A, 41. 3 1--•C 01 re O O n a3 v=g opnd P3 M :•oN aapio a6uegD/•[py 'uenb :aweN pa[oad J Contract Quantity Adjustment/Change Order Contract Quantity Adjustment/Change Order ,y 0 (D0 V CO0 o - N O Additional pipe installed varying in diameter from 6" to 12" Install bolts and gaskets for bolt down covers Apply cementitious coating to manhole Non paved frame and grade adjustment sealing Pressure grout manhole Paved frame and grade adjustment sealing Replace manhole frame and cover (bolted 24") T r7I TCI -1 [11 W [77 W O N tO t0 O` FI+ do $65.00 if! t.0 O O r 0 b O 01 O O O b O O COB 0 b O � O b O 40. V 8 0 8000888 0 0 0 0 N In 0 0 $828.00 O O O S VW° O O O O 8$ , O O 8 44 tri_ rnN���� O $ 0 Contract Quantity Adjustment/Change Order ,y 0 (D0 $793,265.20 rev, 06/11 Contract Quantity Adjustment/Change Order Department: Utility and Environmental Services City Project ID Number WW05RHB78 Justification Change Omer/Quantity Adjustment No. 3 Quantity Adjustment / Change Order #3 Is needed for constucting interior drops In manholes, cutting out inverts to fit camera, and fina quantity adjustments. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Dift encs between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract lime: $21,671.00 $29,072.00 $50,743.00 $21,170.00 $4,800.00 $25,970.00 2.760/a 0.63% 3.38% $76,713.00 225 Calendar Days 30 Calendar Days 0 Calendar Days 255 Calendar Days For Contractor: For City of Round Rodc Printed Contractor Company Name: Signature _ -4t1\°14t\‘‘.—.3r% �� o 7\')rc'S Printed Name, Title Date Steve, sgnature oo( Printed Name, Title rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Item # CO 3-1 Item Demi> , , Interior Drop In Manhole Unit EA .4 . 4 Unit Price $800.00 • Amount $3,200.00 Contract Time Adjustment (Days) CO 3-2 Cut out pipe in invert to fit camera EA 8 $200.00 $1,600.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 OM $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 V.00 $0.00 $0.00 $0.00 $0 TOTALS: $4,800.00 0 rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Bid Item # 10 Item 1 - • , . . Remove 8i replace 48" Dia. Manhole, 0'- 6' Deep Biotech Armor Additive Unit EA 6.0 . -8 Unit Price $2,200.00 Amount . -$17,600.00 Contract Time Adjustment (Days) - 11 Remove 8t replace 48" Dia. Manhole, extra depth (excess of 6') Biotech Armor Additive VF -3 $400.00 -$1,200.00 13 Install 48" shallow manhole, 0'-4' Deep, including Biotech Armor EA -1 $3,544.00. -$3,544.00 18 Remove and replace concrete paving SF 28 $32.00 $896.00 19 Seeding/sodding to match existing SY 5743 $8.00 $45,944.00 21 Tree replacement planting EA -11 $1,011.00 -$11,121.00 23 Flowable Fill LF 255 $28.00 $7,140.00 27 Waterline lowering EA -1 $3,500.00 -$3,500.00 29 Rock excavation CY -15 $50.00 -$750.00 30 Repair AC waterline EA -1 $3,860.00 -$3,860.00 33 Relocate storage shed EA -8 $857.00 -$6,856.00 35 Rock Rip -Rap CY -3 $65.00 4195.00 40 Replace manhole frame and cover (bolted 24") EA -8 $670.00 45,360.00 - 41 Paved frame and grade adjustment sealing EA -1 $800.00 -$800.00 42 Non paved frame and grade adjustment sealing EA 6 $650.00 $3,900.00 44 Pressure grout manhole JT 19 $400.00 $7,600.00 46 Apply eementitious coating to manhole VF 195 $100.00 $19,500.00 48 Install bolts and gaskets for bolt down covers • EA 12 $69.00 $828.00 57 Additional pipe installed varying in diameter from 6" to 12" LF -30 $65.00 41,950.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $29,072.00 0