CM-11-09-207• r K, TEXAS Item Caption: C0'lRECEIVEO OCT 12 2011 City Manager Approval Form Consider execution of Construction Change Order No. 1 with Westar Construction for City Hall Plaza Project, decreasing the total contract price by $5,994.00. Approval Date: October 14, 2011 Department Name: Parks and Recreation Department Project Manager: David Buzzell Assigned Attorney: JKay Gayle Item Summary: This item is for change order number 1 to the contract with Westar Construction for the City Hall Plaza Improvements Project. The change order addresses several little changes to the contract related to either unforeseen existing subsurface conditions or minor changes to the construction drawings resulting in scope change. Additionally, the City removed the landscape material and sod from the contract due to drought conditions. The landscape material will be installed at a later date by City crews. The change order is a deduct change order resulting in a $5,994.00 decrease in the total contract price. The total contract price is now $426,277.50. No. of Originals Submitted: 1 Project Name: City Hall Plaza Improvements Project Cost: - $5,994.00 (decrease) Source of Funds: 2007 General Obligation Bonds Source of Funds (if applicable): General Self -Financed Construction Account Number: aa30cplaz Finance Director Approval: Cheryl Delaney Department Director Approval: Date: 10/12/11 Date: ,o -a-a **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP D Budget 1 L1 N/A OK N/A OK Purchasing El Ei Accounting l l I I N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 ROJ W ROOC. ThXA5 rev. 09/10 Department: Parks and Recreation Project Name: Contract Quantity Adjustment/Change Order City Hall Plaza Improvement Project City Project ID Number: aa30cplaz Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 10/6/2011 1 The majority of the items were related to unforeseen existing conditions (subsurface) that resulted in improvements needing to be modified or added to address the existing conditions. The landscape material and sod are deducted from the contract due to drought conditions and will be installed at a later date by CORR crews. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with M Approved Change Orders: Amount $432,271.50 $0.00 $0.00 $0.00 $432,271.50 $0.00 ($5,994.00) ($5,994.00) $426,277.50 90 days (8/10/11) % Change 0.00% -1.39% -1.39% 90 days (8/10/11) 104 days (8/24/11) RikrtoPrinted Name, Title and cmnpen� - LArtIONt I444/I}t ib Ptin Printed Name, Title and Company ‘S4&46/ 'WATA Printed Name and Title .50 / b/eCO and, Ci/� /ititroe Printed Name and Title l w ;z° Date 10‘/".2,01t Date Date rev. 09/10 Bid Item# Contract Quantity Adjustment/Change Order C01.1 001.2 Spread footing on front stage due to conflict w/ ex. storm sewer pipe Change entry sign to 42" tall and add masonry on backside of entry wall and SE seatwall Unit LS 1 1 1 1 1 70 0 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 Page 2 of 3 Contract Time Adjustment LS 001.3 001.4 Add electrical gutter behind stage for access to wiring prior to entering garage. Additional 16.5' triangle shade fabric option for mock-up EA LS 001.5 Backcharge for PSI Inspector while no work was occuring on site. LS 001.6 C01.7 Retainer curb/wall along the east side of the Nelson Hardware Building Addition of hand holes on shade structure columns LF LS 13131.30 Removal of landscape material from project due to drought conditions. (bed prep, planting mix and mulch to remain in contract) LS BB1.31 Removal of sod from project due to drought conditions. (bed prep and top sod to remain in contract) LS 001.8 Remove and replace existing concrete flume and area inlet by Nelson Bldg. LS C01.9 Remove wall pack light west of Greenscreen on parking garage. LS 001.10 Additional 18' shade fabric for mock-up LS C01.11 Addition of hand rail at stairs on west side of stage LS $300.00 $350.00 $500.00 $140.00 ($300.00) $47.00 $300.00 $350.00 $500.00 $140.00 1 ($300.00) $3,290.00 3 $0.00 ($10,204.00) ($1,100.00) $0.00 $200.00 $230.00 $600.00 $0.00 ($10,204.00) ($1,100.00) $0.00 $200.00 $230.00 $600.00 8 2 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 TOTALS: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 ($5,994.00) 14