Loading...
CM-11-10-218ROUND ROCK, TEXAS PURPOSE MSSION. Item Caption: OA—t(-10—Vog RECEIVED OCT 2 6 2011 City Manager Approval Form Consider executing Quantity Adjustment/Change Order No. 1 with Fazzone Construction Co., Inc. for the Settlement Park Improvement Project. Approval Date: October 21, 2011 Department Name: Parks and Recreation Department Project Manager: David Buzzell, Park Development Manager Assigned Attorney: 1. Kay Gayle Item Summary: Change Order #1 for additional concrete sidewalk to facilitate ADA access to the park amenities on-site, stone masonry veneer around the park pavilion columns to improve aesthetics, and extruded metal letters for a park sign. A more efficient sidewalk solution was also achieved by re-routing the sidewalk, thereby making the necessity for a ramp and handrails null and void. No. of Originals Submitted: 1 Project Name: Settlement Park Improvement Project Cost: $3,480.00 Source of Funds: Parks Improvement & Acquisition Fund Source of Funds (if applicable): Select Source Fund Account Number: 6208-520-23000pk01settle_ctg Finance Director Approval: Cheryl Delaney Date: 10/18/11 Department Director Approval: -- Date: to.rt_K **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item." CIP Budget f j Purchasing ❑� ❑ Accounting N/A OK N/A OK N/A OK E L1 N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 111111114".."-OUND ROCK TEXAS rev. 09/10 Department: Parks and Recreation Project Name: Contract Quantity Adjustment/Change Order Settlement Park Improvement Project City Project ID Number: PKO1SETTL Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 10/18/2011 1 Removal of concrete ramp and handrails, sidewalk re -alignment, park signage, additional concrete, and stone masonry veneer columns. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by: Contractor Approval: Oty Staff Approval: City Official Approval: Sig Ace>. -i N016 Y 4 , t?Re.g� m t5f Printed Name, Title and Company Jot gcv-WnQ, Tre4eA-1- Fazzone Construction Co., Inc. Printed Name, Title and Company Signature Amount $127,034.59 $0.00 ($4,994.22) ($4,994.22) $122,040.37 $0.00 $8,475.00 $8,475.00 % Change 0.00% 6.94% 6.94% 120 days 120 days 120 days 06 Zoil Date Date Vka 'bUta Printed Name and Title Date 5/ta9CY2D i /D ;//, Printed Name and Title Da rev. 09/10 Contract Quantity Adjustment/Change Order Page 2 of 3 Contract Time Adjustment Bid Item# Item Descri . on and Chan . e Unit •y . Unit Price Amount Da CO#1 Redirect concrete sidewalk to LS 1 $2,510.00 $2,510.00 sport court for ADA access $0.00 CO#1 Remove existing sidewalk and replace LS 1 $2,192.00 $2,192.00 tie in with existing sidewalk for $0.00 ADA access $0.00 $0.00 CO#1 Add limestone veneer columns at the LS 1 $2,892.00 $2,892.00 park pavilion $0.00 $0.00 CO#1 add park name lettering to existing LS 1 $881.00 $881.00 stone wall 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $8,475.00 0 • • • MAS rev. 09/10 Contract Quantity Adjustment/Change Order Page 3 of 3 • uanti Ad-ustment Data Contract Time Adjustment Bid Item# Item Descri . ."on and Chan . e Unit •.3 . Unit Price Amount Da 0 $0.00 $0.00 10 Concrete ramp with hand rails, LS 1 ($4,994.22) ($4,994.22) footings, and all appurtenances 0 $0.00 $0.00 _ complete in place per plan 0 _ $0.00 $0.00 0 , $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 , 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 _ 0 $0.00 0.00 TOTALS: ($4,994.22) 0 FAZZ 0N'Change 1H1 Request Propoal # Fazzone Construction Co., Inc. 2008 Windy Terrace Cedar Park, TX. 78613 (512031-4484 Fax: (512) 335.3711 September 15. 2011 To City of Round Rock Park and Rec. Project: Settlement Park Remodel These prices are submitted per the attachments & Reference ITEM TYPE Days) PR 1 RFI1 Qty jUnij Rate 1 Price 1 Bond 1 ins 1 Ot-UP 1 TOTALS Changes to Park Sidewalk Redirect sidewalk down to the basketball court, change elevations of existing grades to allow ADA access. lnstatl stone retention wall at tree by walk. 1 52,222. 52,222.00 522.22 544.44 5222.20 52,510 Remove existing section of public sidewalk and pour new approach and tie into new sidewalk. Dispose of concrete. 1 51.940 51,940:00 $19.40 538.80 5194.00 52,192 Credit for 30' ramp with handrail_ 1 -54,420 -$4,420.00 -544.20 -$88.40 -5442.00 -54,995 Changes to Pavilion Md four 2'x7x8' limestone veneer columns at each post 4 5640 52,560.00 525.60 551.20 5256.00 52,892 Signage Changes Add park name to existing stone sign with 1/4"acrylic letters. Total of 66 letters. 1 5780 5780.00 57.80 515.60 578.00 5881 TOTAL 5 3,480 TIME EXTENSION REQUESTED: 10 DAYS Fazzone Construction Co., Inc- Paul Whetstone Project Man ACCEPTED: Architect Owner