Loading...
CM-11-11-228ROUND ROCK, MAS PURPOSE MON. PROSPERWL Consider executing Quantity Adjustment/Change Order No. 1 with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project. Item Caption: CM -((-t' RECEIVED NOV 02 2011 City Manager Approval Form Approval Date: November 4, 2011 Department Name: Transportation Department Project Manager: Bill Stablein Assigned Attorney: Steve Sheets Item Summary: The original contract for construction services was approved by the City Council on June 23, 2011 for the amount of $17,095,753.80. Quantity Adjustment/Change Order No. 1 with Chasco Constructors is to add John Harris and Susan Hickox as additional insured to be covered for any and all claims. In addition, at the request of Union Pacific Railroad, the proposed 36 inch reinforced concrete pipe was replaced with the 36 inch corrugated concrete pipe for culvert crossing and two additional headwalls to be constructed. The cost of CIA/CO # 1 is $10,519 which brings the new total of this construction contract to $1,710,6271.80. No. of Originals Submitted: Two Project Name: Kenney Fort Boulevard (Arterial A) Cost: $10,519 Source of Funds: RR Trans Dev Corp Construction Source of Funds (if applicable): Select Source Fund Account Number. Finance Director Approval: Stacie Carter for Cheryl Delaney Department Director Approval: Gary Hudder Date: 11/02/2011 Date: 10/31/11 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP Budget El El Purchasing Ej ❑ Accounting N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 11011541111111'."' - ROMEO MXX TOM 1,1111•8114. FOOMMOL 1•11.4•11V rev, 06/11 Department: Transportation Contract Quantity Adjustment/Change Order Project Name: Kenney Fort Boulevard (Arterial A) City Project ID Number TX02ARTA Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 10/18/2011 1 Quantity Adjustment/Change Order No. 1 is to add John Harris and Susan Hickox as additional insured to be covered for any and all claims. In addition, at the request of Union Pacific Railroad, the propsed 36 inch reinforced concrete pipe was replaced with the 36 inch corrugated metal pipe for culvert crossing and two additional headwalls to be constructed. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustments) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: 730 Amount 0/0 Change $17,095,753.80 $0.00 $10,518.00 $10,518.00 $17,106,271.80 $0.00 $1.00 $1.00 0.00 0.00 0.00 $17,106,272.80 $10,519.00 Calendar Days Time Adjustment by previous Quan. Adj./Change Order: 0 Calendar Days Time Adjustment by this Quan. Adj./Change Order: 0 Calendar Days New Contract Time: 730 Calendar Days PrePared By: Z:CO For Contractor: Bill Stablein Chasco Constructors For City of Round Rock: City of Round Rock, Project Manager L[\,, Charles Glace, Jr., President Signature CAA -U-11 228 /b-/8-1/ Date lo''��ri Steve Norwood, Round Rock City Manager Date /11"6..".*-/IOURD ROCK TEXAS rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Kenney Fort Boulevard (Arterial A) Quan. Adj./Change Order No.: 1 Page 2 of 3 Item # 227 cna Item Descri tion 5.3.1.4 of the General Conditions to add the following: ".3 Susan Hickox Harris, John Bolt Harris and the Hickox Family Living Trust, shall be named as an additional insured on CONTRACTOR'S Commercial General Liability policies (subject to any customary exclusion in respect of professsional liability), which policies shall provide primary coverage for all daims covered thereby." Contractor shall provide actual invoice from the insurance provider for payment. Unit LS e uraer Data 1 Unit Price $1.00, Amount $1.00 onI. Time Adjustment Da $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00_ $0.00_ $0.00 $0.00 _ $0.00 $0.00 $0.00 $0.00 $0.00' $0.00 $0.00 $0.00 TOTALS: $1.00 0 P...... - puma Nom 1,11911MIR rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Kenney Fort Boulevard (Arterial A) Quan. Adj./Change Order No.: 1 Page 3 of 3 Bid Item # 466 2069 Item Desc ri .. on Headwall (CH-FW-0)(DIA = 36") Unit FA •.0 . 2 Unit Price $3,750.00 Amount $7,500.00 Time Adjustment (Da 4602007 CMP (GAL STL 36") LF 101 $107.00 $10,807.00 464 2040 RC Pipe (CL V) (36") LF -74 $110.00 ($8,140.00) 496 2007 Remove Structure (Pipe) LF 27 $13.00 $351.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 TOTALS: $10,518.00 0 ter, 1213 s: zzo 27¢2f zV97y7Q 03' 146115,4 FILE, e3ArrdMnyda/dar909161RRNIOSCOY.Opn 6 TE+ 9/93/9011 T. 114.2fAM USER+ MRQ4_USERI 100X SUBMITTAL ARTERIAL A 1 JO t 133HS "+^+ g� p G I4282 2003 4282 2004 4282 2011 4282 2001 460 2007 0496 2007 466 2069 o.. S S o SUBBALLAST - TYPE A, GRADE 1 FLEXIBLE BASE TRACK 136* CBR If/ WOOD TIES AND BALLAST EMBANKMENT RC PIPE (EL V)(36 IN) CSP (GAL STL 36 IN) REMOV STR WIPE) HEADWALL ICH -FW -0)(01A• 36 IN) DESCRIPTION EXCAVATION "sg N [TRACK 1368 CDR W/ WOOD TIES AND BALLAST 0 a c-,,,1 g "+^+ g� p G I4282 2003 4282 2004 4282 2011 4282 2001 460 2007 0496 2007 466 2069 o.. REMOVE TRACK DRIVEWAY (SURF TREAT) TIMBER GRADE CROSSING REMOVE TIMBER GRADE CROSSING• SUBBALLAST - TYPE A, GRADE 1 FLEXIBLE BASE TRACK 136* CBR If/ WOOD TIES AND BALLAST EMBANKMENT RC PIPE (EL V)(36 IN) CSP (GAL STL 36 IN) REMOV STR WIPE) HEADWALL ICH -FW -0)(01A• 36 IN) DESCRIPTION EXCAVATION "sg N "`iN-K m Po n 0 '1 0 C z 0 0 O 70 n m US n 0 Z N 1 70 C n 1 O z n 0 z 1 70 n 1 0 6iSI6'i�iq 5, 33. 331�m 1gq3'.se:i 0 qqq 6,.��,,, '' I FRE. OpmorRl�R(W 02.0 sxsxxss�sa sd I's# a{i JWE, 9278011 0EXIST FRCP T%R 67765 68033 67669 67579 67974 T9 AA9.P/ NI is O ,m 67573 67 67599 67937 67565 5- 67929 67560 67925 Al 675.28 67928 675U3 6793T 11 6759,1 679.54 e .Y 8 ' b re -. • � 1 SS iL _F 2— a -- -` --PYI 7116.44 p o o A S A T1 P UV i7 .IS sgAit x M ...___.l x I 1! •• exq 67536 6,873 675J7 67997 (PROPOSED ARTERIAL A STA. t31110.44 -675.,'75 S. DIRT ARAD STA 16.21.40 Fa .Ts. $ 6 1 T.. F .. - 11* USE+ MRAUJSER) V= SUBMITTAL ARTERIAL A -- MATCH LINE STA. 7+00 ' ++Nn /1---T------ e• 9. 8 (g $ Sio ,.�V{7 or -5t0 I I.12: SI 5i'0 1!•72.51 £ PROPOSED ARTERIAL A...N.. T. a1 �o • 8 i 1390 1 QQa V P I I 1 7• N 8 F Ste 1,.35. almoommemmm.mmalrelemm ammammommeem MATCH LINE STA. 18+00 fs 8 tiVELS DISPLAYED EXISTrA POW TilR o FILE: civarmrkfrOdoAdas92816VildAPPlii2 114TEr 943/8:91 TIME: MO All • • USER WH1R..1.1SER) 100X SUBMITTAL ARTERIAL A 6.55 PP40 34W ig 14.4%,0. ,Aj f M7Y AN7l • i� Y�. S M} ALC 14 1.4 r II I:1 Id 11L 1i 11 F*E eywwrlNOW1e09070Is/-uYA01.11.1 004 /'SIF 101Oe."1 .F41 1S 11 rt 1 1. 1 I 111 Ili WW Ili KENN& FORT BOIN M:, 205.00 ER U5 75 :s ---_—_—_---_��_—_3a-. US 71/IPRR RCM tv :R -r 6 • 1 y ,fir A A 1 /40 r 0 J X A 9 Y/ 0) N ~► 0) MI AM go 08VA311109 1803 A3NN3)I r- 11;04i C< 1'4'J m SP X) 1— r — I> * 0 (o 4 4 �,'. 1.1 1 TEMPORARY OORSOR •Zs, II $O2 s A N 3631 rit w"neia�"(uud 1 a ''''''1111914t Na )a v aca wx� __ __-_____�.___ 3131 J_ f9S AAPAAAMAteleN021137(lo e..,A6 1STA9El.a9n - AY 4 MOOR-OSE'I9 a as ' lil ii1 til it 1 11 1i i 1 TA [) • C C r- .73 En ___y rmv+ i " of if( 2 1 C KENNEY FORT BOULEVARD —.—i----.--- —. 205.00 E9 US 79 • • •s r • • . . J _I• / • . - ----fro US 79/UP99 909 IX 11 4 f HTH+H+JJ1.tll •00 10 TEI7OPra9Y CWSThUCTION EASEIENT I 2. — 3131 V a Im a a bn N J ki 0 7t C M r zm"'.�� -< a: **t Xinc-1iCA ax, - 0# i * .n, m xi 0 A'S C.. r a 0 xi C v -1 F -LI X October 10, 2011 Bili Bambrlck Chasco Constructors, Ltd., LLP. - 2801 E. Oid Settlers Blvd. Round Rock, Texas 78665 RE:'K.nney Fort Blvd. (Artsriai A) Charge Oder 11 Dear Mr. Bambrick, Attached is the documentation for City of Round Rock Change. Order NO. 1 as shown below. • Attached Special Provision 01340-001 • City of. Round Rock Contract Quantity adjustment/ Change Osier form with the change in quantities; and an added bid item for additional Cost to include land owner as additionally insured. • The below listed Pian Sheets are attached as part of this change order and shall supersede the existing sheets: o - UPRR Plan Sheets- Sheets 5, 7, 10, 34, 35, 435 • The below listed Pian Sheets are attached as part of this change order and shall be added' to the contract o UPRR Pian Sheets- 34A, 34B, 34C, 3M, 35B, 35C Please review al contents, update City change order form with pricing for insurance item and forward to the City for review and approval • If you have any questions or require any additional information, please keel fres to contact me. HDR Engineering, Inc. Leah Peters for George,E. TiNett, P.E. 4011 VIM Gals M.Y. P. u),.a1,YO &ft F* $I211241N ' SPECIAL PROVISION 01340-001 Submittals For this project, Specification Section 01340 "Submittals" is hereby amended with respect to the sections cited below. No other clauses or requirements of this Specification are waived or changed hereby. 1.5 Transmittal of Submittals, C. is voided and replaced with the following: C. Only electronic submittals shall be accepted. 1.5 Transmittal of Submittals, C. is supplemented by the following document. "Submission of Project Related Information" shall supplement this specification. If there is a conflict between the two, the "Submission of Project Related Information" shall govern. Kenney Fort Blvd. (Arterial A) 1 of 1 SP01340-001 Submission of Project Related Information This document is for use with the City of Round Rock project known as Kenney Fort Blvd from Joe Dimaaaio Blvd. to Forest Creek Dr. (Project). This document is intended to be a Guide in the Electronic Submission process and changes apply only to the Specifications listed. 1. All Electronic Submissions shall be sent to the following email address: kfortadmint hdrinc.com. The Engineer does not require any CC recipients with the exception of correspondence. 2. AU correspondence must be addressed to Bill Stablein and CCd to George Tillett. A scanned pdf file shall be submitted electronically only via email sent to kfortadmin@hdrinc.com AND CCd to bstablein@round-rock.tx.us 3. All submissions shall be between Chasco Constructors, Ltd., LLP (Contractor) and HDR Engineering, Inc. (Engineer). No Submittals will be accepted by the Engineer from anyone other than the Contractor. 4. All submissions shall be in pdf format. 5. The Engineer shall confirm receipt of electronic submission within 2 business days. 6. The Engineer shall keep a log for all submissions and shall provide this log to the Contractor for reference as updates occur or on a weekly basis. 7. All electronic submissions shall have a cover sheet attached which lists pertinent information, including Project Name, Project Number, Date, Submittal Number and Type. SHOP DRAWINGS 1. Specification 01340 SUBMITTALS shall be supplemented with the APRIL 2011 "Guide to Electronic Shop Drawing Submittal," In the case of a conflict between the two documents, the TxDOT manual shall be the governing document with approval of the Engineer or Owner. 2. All shop drawing submittals will follow TxDOT procedures for submittal as detailed in TxDOT Guide listed above unless otherwise specified in this document. 3. The TxDOT Guide shall be modified as follows to suit the needs of the Project. 3.1. All submittals shall be between the Contractor and the Engineer. No Submittals will be accepted by the Engineer from anyone other than the Contractor. 3.2. File Name examples are shown below and shall be as follows: YYYYMMDD_ProjectName_SD_Structure_Type_Submittal No 3.2.1. Re -submittals shall follow TxDOT guidelines. File Name for re -submittal shall not change, but shall add A, B, C, etc. to the end of the file name. Submission: Brushy Creek Bridge Pre -stressed beam Shop Drawings Example file name for Shop Drawing: 20110824_ KFORT _SD_BRSHY_BEAMS_001 REQUESTS FOR INFORMATION 167980 Kenney Fort Blvd. Joe Dimaggio Blvd to Forest Creek Dr. 1 of 2 07225-94452 1. File Name examples are shown below and shall be as follows: 1.1. For Requests for Information: YYYYMMDD_ ProjectName _RFI_ Subject_Submittal No Submission: Sidewalk information clarification Example file name for RFI: 20110824_KFORT_RFI_SIDEWLK 001 SUBMITTALS 1. File Name examples are shown below and shall be as follows: 1.1. For Requests for Information: YYYYMMDD_ ProjectName_Subject_Submittal No Submission: Concrete Mix Design Example file name for Submittal: 20110824 KFORT CONCMX 001 TESTING 1. Testing requests shall follow the procedure outlined below. All testing questions and clarifications shall be directed to Eddie Imken 1.1. Notify Eddie ahead of time of testing needs 1.2. Upon approval from City, Contractor shall request testing directly from John at Fugro giving a 24 hour minimum notice or as early as possible. 1.3. Testing turn -around time will be as stated in the schedule provided by Fugro 1.3.1. All testing reports shall be forwarded by Fugro within the timeline stated in the schedule. The distribution shall be as follows: bill@chasco.com; eimken@round-rock.tx.us; bstablein@round-rock.tx.us; james.perry@hdrinc.com; pat.bachman@hdrinc.com CC: Kfortadmin@hdrinc.com 167980 Kenney Fort Blvd. loe Dimaggio Blvd to Forest Creek Dr. 2 of 2 07225-94452 0 k z cx0 z 0 1k z 0 a ac 0 0 ac0 z 0 _ 0 [ u a. 0 14 wk uCCu 2■ 0 0» ga CC uk Z }U. z■ 0 Z a.It k ■ 4 SHEET 1 OF 1 4q 10 = Vey...* r := 0 ,,1.1A1 74LIJeaz001 �_ _ / i \ [se__! , Q q §k§ )k==[§ § 1 EOCAVATION - --- EMBANKMENT RC PIPE )CL 0)136 IN) CSP (0AL STL 36 1N1 REMOV STR (PIPE) HEADWALL (CH-FW-0I(DIA• 36 IN) SUBBALLAST - TYPE A, GRADE 1 FLEXIBLE BASE TRACK 1364 CWR W/ WOOD TIES AND BALLAST TIMBER GRADE CROSSING REMOVE TIMBER GRADE CROSSING REMOVE TRACK DRIVEWAY (SURF TREAT) i. 11 110 2001 132 2001 464 2040 460 2007 0496 2007 466 2069 4282 2011 4282 2001 4282 2003 4282 2004 4282 2010 530 2012 0 14 wk uCCu 2■ 0 0» ga CC uk Z }U. z■ 0 Z a.It k ■ 4 SHEET 1 OF 1 4q 10 = Vey...* r := 0 ,,1.1A1 74LIJeaz001 �_ _ / i \ [se__! , Q q 8 8 00+81 'US 3NI1 H31VN 1 1 . 8 1 i 4 1 s o•sl P aao NW LL 'ji 1V163l10 0360dO6d 3 1t L1• L 411.6 ws 8 3 ▪ • I L'•Lot OLS\/ V M!!3llN w.upr9AS ;fool 6/36/2-60108 •a Sil asa EY 16.11 U8' m; M WWII +3m1 /03/0/6 '3162 r MJ02CWdaf41M91609.1P.P^i aunA. 71Id !8629 Lf5L9 £t619 af629 g '6519 Zr619 9T6L9 9ZSL9 $i649 09'519 W619 S65L9 N 1r649 ------66529 5'629 8 £529 6 '£619 P£519 669L9 0• P FcO99_ $ 59YL9 W1 d0ad Iry e y�Ft� SIC f J PROPOSED UPRR BRIDGE At CORR CONTRACTOR FORCES TO COIlLETE TRACKOM WITHIN PA f LIMITS OF PROPOSED BRIDGE IP Ia150.01) 8Y AND CULYFAIS Tus 79 - 7 o z�s_w�Jm ". !�R.L ..... __-- _ —__—__ 8 8 8 8 8 8 8 8 Y gipM'—"—__—__—__—_ _----_---' _ �_ �.._..__. —__—__—__—_• E PROPOSED SNOOFLY� — 11 LF PROPOSED 36•CSP STA 16 30.76 NP 136.91 E%UPRR STA�2.11.M E PROPOSED�� INLET ELEW. 672.65' -S DIRT ROAD «'PROP UPM NP 671&0?92 REPLACE TIMBER AT-GRADE CROSSING 7! 4 LF PROPOSED 7i'CSP STA 13.79.61 TO REPLACE E%ISTINO 36•CSP CL PROPOSED UPRR NIP 156.69 EN%P 111P56.67 CLP PROPOSEDARTERIALA OOpp{{ INLKAEELEY� 5672.80 p OUTLET FLEW. •672.62 C PROP VM W 156.65 y 9/19/11 CULVEED RT REVISIONS OWS 3 6/2/11 ADDPLAN NOTE OWS aI REV I DATE I D SCR PT ON I APPROVED i THE SEK APPEARING DH THIS UDCUNENT IS L'120.21' AUTHORIZED BY BFANIS H.SCHULZE,P.E. 01 0.H DI 001% li TIZfI ON SEPTENIEA 19. ZO11. -- 0 - - - - _ ...-----1.'199.00'... - - ---- - ..----- F\ \ 0 01 1 -oo1W _ h 6@D' -- ------ - Dig 0 ggg 2W% � a ax it 0.06 m 685 s M � � NNIS W. LZn dat %$ 7120•9F - -'-- ---- -- _ -- ---------------- - \ iv --- -- --- - - - - Ausin QTeI675__ ._____ -_ _ --------------- .oT$s d18 E7E4 5T 2 OF Ergne rc3 •c TQ117�4401 Wes'Gale 0,4vfe 40 0NSR RROPOSED 76'CSP 1 z OW-ITAfME aF PL6L'�i CN•%%.S$ 665' QUTLET NO, $79 63' CSP 1. _. pppppSE�3{ OIITLE .ECFV. $T2 t �t7UPRRI A ..~I 660. '- -- -- STA. D�7SfwUPRR ; ' 1 .61 9 o ; — FIN P&P AARTERIAL ME J;t - n� '. ^l l.. .-NAV co: ..-_ .nt Hxavvzf r.ocH ALIGNMENT � IC fl ANTF R!AI A 13-00 f• I __ ___ SRLlI NO ^ Wil InVSON —� RO'�NOTitUCN 1 10 -- �F 1 r 6 I. JW Vs �y d oI'i 5` 11 _ ell 1 la ea F; Fal ex 55 517 5N 51 p k 86E le tICIICIS 13 NOLLMM1LSIW 1111110/131 /131 KENNEY FORT BOULEVARD a r Y� 6 at a 14 w a a a a a A El Mg go L----------,] St Sfl 83 OWA271I011 11/0d MINZI 4135111Mar 117511 _=__ _ =^re==rtilc=-1 11 11 11 11 -•I., +/ I --+t I P ID -1 40 a or Ma sou twins eua 1Mr7DMlrTwOQulaN00414.1.ev 9M4 Am a _a 1a3135r3 NOIlOna15N00 4.4180d1831 ---- way awns 3 Is a 14-14:11-t -1 H B f I- f _ 1 1 1^ a. 1 V- 1-4 ISOS maim. Sn ,T= ----I-------- • IWs • • L -"•" -.. • • • • I • it 5n 83 • OWA3711O9 .1210d A3NN3Y 8/3SITMO M 41.750 RT• 0 44,1v, tV d r IIIii- UI.? VP • lie fi 40 n m c to M .:.. '�11� wirer 931•7 Lari3MISIOvw-n-paimma Y emamm m*. 3714 I0� Oritt;rsplKss's > r.vz'�tf -�Y4Sq'l[`t6 u1 a µ tO5 i I jI I !IIPRR TRACK_i... Q SHOOFLY : i I TRACK : -(US 79 E611L US 79 EOML STA 205 36.62 INSTALL NEST ,,Ip 156.91 E%[STING 3-4' 2 CULVERT HEADVPROPOSED ' UPRR STA 12.14.40 , BDi CULVERT, J.I SET J6'RCP i I I e CULYI l I l P" yea GRADE TEMPORARY CONSTRUCTION _ �"1_ I EASEMENT AREA TO DRAIN TO SLOPING - '' I INLETREGRAETTO E%ISTITERCONDITION,SHOOFLY, 44, NOTE. I I I I REFER TO DRAINAGE ALIGNMENT DATA FOR • I DI TCN ALIGNMENT. I I INSTALL Jg" CSP%49 LF ( 2. REFER TO DIIAINAGE DIT CX PLAN AND ICUT AND COVER UNDER UPRRI 36' CSP%34 LF I PROFILE FOR DITCH ELEYATILAN INSTALLED IN '- JOIN SEGMENTS OF _i STAGE 1 I 3. REFER TO UPRR AND%ENNEY FORT BLVD Y i 36"CSP SSTNSTRUCTTION PLANS FOR CULVERT Iw � I F I I I I 9/19/11 SHEET ADDED OrS V T PT PPR V y� 6 OF 4UPRIITRACK! __ /� *�� RRR r 1 �[�\` 1 1 1 I ' : i i ' i 1 rL SHOC;FLY TRACE( ;.. /. .:...................:. . E%I$T LNG GRQUNO ; 1 i / , 1 1 s oFnrrs r,saNrLZE i � /, +i �•'yA70 4�I tat 1 ' o� cisco, ' a 67_j____ I —.679 CULVERT ` ------- 1 1 111 , 1 I 1 i i E OU S i RT STAG � CULVERT STA,67i - 1 s71 _-�=x533— ii --------------- -------------- — i ! KENNEY FORT BOULEVARD 1 _ f 6 -- ,_ .,.. .... bZ __. ..- .}. .......,'... __. - ----- ---- - _6720 :o N __. I__ E%I Is I -_-; SEEDIN 1i��RT DS FL �2.46' i 0 v DS FL 673.13 I ; i F UPftR y , bZfi._ FNA -wsII , 9HFFf20F s- i — -V : CUUVERT AWWA 3 : , SED US 672.65, THE CITY OF ROUND R TEXAS PR 1 rC�ULVRT 1TA(�E 2 oc%, ppp q 6 22S LT OF UPRR ; 1 uP �2T�R7'�67IAF R STA 1 +i .40 — -•---- -- --'--- - - - 36 CSP i I N^.. QIOa i s,F Inc.1 23'y 9 FP$ : 6Z l5 f 1 1 1 of f i -' Ynw.u culr0l• A ii 1 STAT1. �1'NI>Jt IT NU. HtMDNAY 1 TL%A'i %ENNEY IOlil HI.V f I:WNTY CI IY SNF Tel N0. WILLIAMSON -HOUND HOCK 11431•138,3 No uonnistioa :a A8Y80•1131 E- a tf_J- .,a 2 8 Lil Z > z _Jui n Ne 41 e,1 U THE CITY OF ROUNO ROCK, fl — — — — C44. :as e id 1R14: nal I 2 •ffiI 1-1 ir se sn 83 CIINA71170g Jii0_1 ANINMI AfiSreGOS WSJ) t SHOCIFLY TRACK 8 8 i I ,T8 S.f.w4 ---- I 35 .4 H peg • _ N4 r. • ig$ we May WILL 4171/17/8 911,17 diri331.15-10Vnrrrimoingowsp00.4.42µ2 971_4 ..,,, . . . rAK,* at a? ti ,,,t a S ark.; t /L41:1.4cri,/, 41 L 41 , S' U H si 5x:«Inch 2 I3.0 Clraular ' I ' IFRO TRACX "..—A I N~Of Ii•1 s ( r•44.000 Slap 0.001 1 ( (SHOOFLY T I -.I \.. Do.n0trOm In Ft`•TS72.6im US Ti EINL STA 200.03.76 I I M voles 0.024 EXISTING i' z 3. 0 4' x 2' ( Entronw KE volw• 0.200_____-«- .} : i—[US 7f EOL BOX CULVERT• 7t 1 SET 1 - ---« lvwtq MAX Inlet Outlet Tell~ ' V ISi.17 ' `.\ 1 000•«674.220 i74.OH 674.220 672.700-« - i J - 0 EXISTING STA IS+70.20 E%I STING M'CSP%24 LF 1 i f-�\ ) Outlet Un-faFw GOP"CrItlool slope slope TO BE REPLACED ,� `. P loopy 040tNN__Ogth Slap Slap ' I 1:CyV2 90' N y \ .` �,. -. 0000 4 f90 1.210 0.946 0.; ................!3 0.004 Ta11YA0ter Definition-UNr SIAVPH IW Ta11;HK EI4vHipNi --- \ 10•w IGI!awr------ r -- I --� I �'1� - -I —- ----- ----- -------------------------- -- 9.000 i7 7 PROPOSED { \ HEAORALL (NEWS'CSP X144 LF !!' TEJVRARY -� �- �\ \ \ --------------------------------------- NOTE__ I� I. REFER TO DRAINAGE ALIGNMENT DATA FOR I i PROPOSED —I— fi 30'CSP I \.\ .=.. DITCH ALIGNMENT. ?FOR SHOOFLAYCC�RNppA I 2. REFER TO DRAINAGE DITCH PLAN AND CCOOPER ESP LOMEMO.�E I `\•\ PROf[LE Ftll OITCN ELEVAT E DITCH EONS. I 3. REFER TO Fl ANO KENNET FORT BLVD 1 1 I sr7ION PLANS 6011 CULVERT .�''• I 4. REFER TO CONSTRUCTION PHASING PLANS ro PLACE 36'CSP IN STAGES. s .Il CULVERT REVISIONS CLP I 1 , -- ----- --- ---- --- ----------------------- ----- ..........OF 111 --------•- -- --- -------- -- ------ r�� f UPRR TRACH :*11 EXISTQ4 GROUNDc t""' j'*•� 80------- ------ ------------I------[ 1 %%4 j �QLi Zi__ JA - . \S/QAIAL �r + - ------------------------------------i11AG% ITT -`-.,�---- -- _ _EXIsrcN-c---1 --- CULVERT LAYOUTS NR_--674.: ----- ------ --------------r _ fila '�. CULVERT *2 7_ ____�------- ' .._ '______ -- I I rAllaAicRCLi•�n.7tf KENNEY FORT BOULEVARD # + _ ( � --------H ; ---- } --- -- -- -- -a7 RD J ...LL , , , I 1 • GRADE T , TL_ FL iS2' i _ -_ ______ _ ____ _ _�__�..____..__.. ._SEFAitlG____.,___ - _.-____ _____ ______ ____ _. _ _ _ ___ _ _____ _ IM TO SING t�T _ . _.,___� __--------- - ___ 0 2 4 v � /RpPpSEy —�� 7 679- ------i-'------i-------''_------�- ...0'22•-kT- UPIN`---------------' REPL ------- ' 33 L OF C �-R6OV�MOYIIDOFL�C'-------' -------- .fiT >fIIEE�2�2 ' PROPO;Ed�1 ! 'balfa xz r ------ 3r - Howl PROPOS€D WIMALL THE CITY OF ROM ROCS, TEXAS — - - -- - "— ' ---------- ----- --- ----------- PROPOSED CULVERT 2 UPRR E STA 15+;78.29 .m i 36" CSP _ i xO CFS STATE PRoxCT M0. MAOAOXAY V1100.- 4.7 FPS LENGTH (FINAL CONFIGURATION) • 44' TEAS ENNET FORT BLV COVNtt CITY I SHEET N0. -- I NILLIAN30N I ROUND ROCK 0 >- Lai = - 2 0 2 r-. P.; ri. r-- 40 401 40 (0 Itl --- -'1 4 ! I . , $ ; t . r.! 00.3.443 morianaistao A8V210013.1. -- _ 60 t • $ 1 H 4 f H -I -H .- il I II ; — 2:—!----31-----T1-7— --1-1 It ;til 11 I I ; I -H- --- +r-- --- 7 - cn LLJ >608 \,113M -116L 511 is 1 1 _L! - - 00•603 6L 511 83 1- I ; °WA77110El 1110.1 A3MM3)1 riagrrarrmo 41201 vvrn-g•i--- '3.00 .5W1 WILL idif,13911.9,71W.r.-PAILSIZZCSWigtiPlaiiidie 711.4 1 --- • - 4c$ $ .$ F$4$$$ ;f LOA ;03 0 friArtat :13411 111 0110 .7111013 11:104 d3NN3N W1511,1O4X 1175/1 h M VIII 42/76 7lM iQh htd ntQ ua0239#15-ZOWmMA0101700~40,..A. ;PM I 20t .719t460 ApNNa{iSIS 1p uylz� c I Os "4 yy 34V'd51C 5.3.: EIt [t 1= lh 411AO„..? r,c z n S .►.s #is =PM OAP 12A14 AMC& SNW?d X001 WNW, WM M DO. 911Wl 1W/N q p r 7f,