CM-11-11-229Item Caption: CM1!'ECEIVEO NOV 02 2011 City Manager Approval Form Consider executing Quantity Adjustment/Changer Order No. 1 with McLean Construction, Inc. for Phase 1A - Old Settlers Park Reuse Water Line project. Approval Date: November 4, 2011 Department Name: Utilities and Environmental Services Department Project Manager: Don Rundell /Jeff BeII Assigned Attorney: Steve Sheets Item Summary: Phase 1A of the City's Water Reuse System is a 24 -inch waterline that nuns from the existing 24 -inch reuse line located on the north side of State Highway 79 (constructed with the Chandler Creek Interceptor Project) to the north end of Old Settlers Park. This project has been completed and tested. During construction, it was necessary to increase quantities as follows: eight additional yards of sod were needed at the soccer fields, an additional 12 square yards of pavement repair were needed in Dell Diamond's parking lot, and 14 mere linear feet of 24 -inch PVC pipe were needed because of alignment changes along Harrell Parkway. Quantities not used to 100 percent of the contract were: 466 linear feet of concrete curb and gutter, 20 concrete wheel stops, 23 square yards of sidewaik replacement, and half of an inflated temporary dam. Quantity Adjustment No. 1 is for $1,065.00 which raised the original contract sum of $975,515.00 to $976,S71.00. To complete this project, it was necessary to add a 2 -inch stub -out, 2 -inch valve, and meter box at the north end of the reuse line for bleeding air when we commence operation of the waterline. This resulted in Change Order No. 1 of $S,9$1.70 which increases the contract total to $9$2,532.70. e No. of Originals Submitted: 2 Project Name: Phase 1A - Old Settlers Park Reuse Waterline Cost: $7,037.70 Source of Funds: Self -Financed Water Construction Source of Funds (if applicable): Self -Financed Water Construction Account Number: WROIOSP Finance Director Approval: Stacie Carter for Cheryl Delaney Date: 11/02/2011 Department Director Approval: Michael Thane Date: 10/31/2011 CIP N/A **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** OK Budget mID N/A OK N/A OK Purchasing GEI Accounting N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Page 1 of 4 Contract Quantity Adjustment/Change Order • ROUND ROCK TEXAS NM. 1.11110k 11.114111111, rev, 06/11 Department: Utilities & Environmental Services City Project ID Number WRO1OSP Justification Change Order/Quantity Adjustment No. 1 Additional administrative costs for completion of weekly certified payroll funding requirements (CPR 01); Addition of 2" stub out with ball valve and End of project unit quanity adjustments and quarterly reports pursuant to ARRA grant meter box at north end of 12" pipeline (CPR 02); SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: • Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Printed Contractor Company Name: For Contractor: °M .IL Signature cl�-tt-`1-2Z'f Printed Name, Title Amount 0/0 Change $975,515.00 $0.00 $1,056.00 $1,056.00 $976,571.00 $0.00 $5,981.70 $5,981.70 0.00% 0.61% 0.61% $982,552.70 $7,037.70 180 Calendar Days Calendar Days 0 Calendar Days 180 Calendar Days )M McLean Construction, Inc. 1 Se• -•#41441 PaaSFT" MANA6iE1L Printed Name, Tide IOf L'i l 1 Date POUND ROCK, TEXAS 1./0611.11SON n.o.:wrx rev, 06/11 For City of Round Roc Contract Quantity Adjustment/Change Order 9-tve,lvoy Vo ttI i GLI! Signature Printed Name, Title Date Page 2 of 4 • ROUND ROUND ROCK TEXAS •nrox n wxrsrc rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Page3of4 Item # CPR 01 Item Descri ' tion Additional admin costs for ARRA reporting cnan • Unit LS e vraer Data • . 1 Unit Price $5,231.70 Amount $5,231.70 Contract Time Adjustment (Days) 0 CPR 02 2" stub out with ball valve & meter box at north end of 12" pipeline LS 1 $750.00 $750.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00' $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 HOUND ROCK TEXAS NNW. MOM woreurc • rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Page 4 of 4 Bid Item # 8 Item Descri . • on Sodding Unit SY •y . 402 Unit Price $4.00 Amount $1,608.00 Contract Time Adjustment (Days) 12 Asphaltic Pavement Repair SY 671 $18.00 $12,078.00 14 Concrete Curb & Gutter Repair LF -466 $24.00 -$11,184.00 15 Concrete Wheel Stops EA -20 $65.00 -$1,300.00 16 Concrete Sidewalk Replacement SY -25 $8.00 -$200.00 18 Water Inflated Temporary Dam EA -0.5 $2,000.00 -$1,000.00 23B 24" Reuse Water Line LF 14 $78.00 $1,092.00 24B 12" Reuse Water Line LF -1 $38.00 -$38.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $1,056.00 0