Loading...
CM-11-11-234C11-11-11-23y Crm ja PourvDKoac,nxas City Manager Approval Form Rt. bAzasti MOSS mon n�osrearx Consider executing Supplemental Contract No. 1 with Huggins/Seiler & Associates, L.P. for the South Mays Street at Gattis School Road Project. Item Caption: Approval Date: November 18, 2011 Department Name: Transportation Department Project Manager: Bill Stablein Assignrd Attorney: Steve Sheets Item Summary: The original contract with Huggins/Seiler & Associates, LP. was approved by the City Council on September 10, 2009, for a revised preliminary schematic, design surveys, right-of-way documents, a Texas Department of Transportation approved environmental assessment, pavement design, and full PS&E plans and documents. The amount of this contract was $499,167.80. Supplemental Contract No. 1 in the amount of $32,334 is needed to revise the design of this project to include the addition of dual left tum lanes south bound to east bound and west bound to south bound for the intersection of South Mays Street and Gattis School Road. The revised contract total would be $531,501.80. No. of Originals Submitted: Two Project Name: South Mays Street at Gattis School Road Cost: $32,344.00 Source of Funds: RR Trans Dev Corp Construction Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: Cheryl Delaney Date: 11/16/11 Department Director Approval: Gary Hudder Date: 11/14/11 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP n ❑� Budget n [] Purchasing [ ❑ Accounting ❑� ❑ N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SELLER & ASSOCIATES, L.P. ("Engineer") ADDRESS: 116 East Main Street, Round Rock. TX 78664 PROJECT: South Mays Street at Gattis School Road This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of September, 2009 for the South Mays Street at Gattis School Road Project in the amount of $499,167.80; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $32,334.00 to a total of $531,501.80; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Il. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $32,334.00 the lump sum amount payable under the Contract for a total of $531,501.80, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.7124; 00236597 84275 TX02MAGAT 1 CM -ll -Ii -23y HUGGINS/SEIL _ ' & ASSOCIATES, L.P. By: `go BI1 9 3 NOV. I t Date Supplemental Contract 0199.7124; 00236597 TX02MAGAT A ' P ' OVED AS TO FORM: SK.*. 4'O ' wood, Step! : n L. Sheets, City Attorney Cify nuut�' Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: This project consists of revising the intersection of South Mays Street and Gattis School Road. The project includes a traffic study to determine the need for additional turn lanes. The traffic study will include three day traffic counts at determined locations and will include 1) No build Option present and design year, 2) Two design options of improvements for present and design year and 3) Stripping options for left turn lanes eastbound on Hesters Crossing bridge over IH 35 for present and design year. Based on findings from the traffic study, a preliminary schematic will be revised and resubmitted for City of Round Rock approval. Design surveys, Right of Way documents for a maximum of 14 parcels of land and full PS&E plans and documents are required. The work effort and the management of the projects included in this contract will be conducted in the Engineer's office in Round Rock, Texas. The Engineer will be readily available and accessible to the City of Round Rock's staff and will meet with the City's project manager as necessary. All work is subject to the review and approval of the City of Round Rock. The Engineer will solicit and secure written permission for entry to accomplish any work beyond the existing right-of-way line. The Engineer is fully responsible for any traffic control required for any data collection activities. The control must be consistent with the City's procedures. The Engineer may not close a lane of traffic without the written approval of the City. The Engineer shall provide the following services: 1. Meet with the City to discuss schedule and scope of work 2. Coordinate sub -consultant survey work and preparation of existing conditions base map and DTM. 3. Coordinate sub -consultant work for survey and preparation of R.O.W. sketches and documents. 4. Assist in identification and location existing utilities and coordinate utility relocations as required. 5. Provide complete PS&E package including storm sewer design, traffic control plan and modifications for the widening/total reconstruction of the existing roadways to the approved typical section. 6. Prepare signal plans for Mays and Gattis Intersection. 7. Preparation of any necessary standards, specifications and/or detail sheets when not available from the City. 8. Prepare bidding documents for City Letting process. 9. Provide a draft advertisement for City review and advertise project for letting. 10. Provide 25 copies of construction plans and bidding documents. 11. Assist the City with the letting event documentation and assessment of bids. 12. Provide any plan and/or specification interpretation required during the construction process. ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page O N a 1 C t IL 4 8 n 1 1 IL C 8 1 7 7 c El. a LL C • 7 0 Lr v a i a 3 1' m t 1 1 i A e 0 0 0 U a a a 1 E O Ty•LL i C 3 i 1 n 1 K i d 8 1 a E E 4 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page I .. Exhibit D Fee Schedule Task Total Total Other TOTALS Labor Hours Loaded Labor Cost Direct Costs Subconsultants Task 1: (e.g. surveying) Task 0 $ - $ - $ - $ 2: (e.g. public outreach and concept design development) Task 0 $ - $ - $ - $ - 3: (e.g. preliminary design/ 30% plans) Task 0 $ - $ - $ $ 4: (e.g. final design/ 60%, 90%, 100% plans) Task 5: (e.g. bid phase services) 289 0 $ 32,334.00 $ - $ - $ - $ - $ - $ 32,334.00 $ Task 6: (e.g. construction phase services) 0 $ - $ - $ - Task 7: (e.g. project management) 0 $ - $ - - $ - $ $ GRAND TOTAL: I 289 $ 32,334.00 II $ - 1 $ - 1 $ 32,334.00