Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CM-2016-1027 - 2/5/2016
QV"iMENTOI * U.S. Department of Housing and Urban Development Ga IIIIIII� at z 451 Seventh Street, SW �a Washington, DC 20410 B4N 0 EVE'� www.hud.gov espanol.hud.gov Environmental Review For Activity/Project that is Exempt or Categorically Excluded Not Subject to Section 58.5 Pursuant to 24 CFR Part 58.34(a) and 58.35(b) Proiect Information Project Name: Hope Alliance Shelter Improvements Project CDBG 2015 Responsible Entity: City of Round Rock Grant Recipient (if different than Responsible Entity): State/Local Identifier: N/A Preparer: Elizabeth Alvarado, CDBG Coordinator Certifying Officer Name and Title: Laurie Hadley, City Manager Consultant (if applicable): N/A Project Location: 1011 Gattis School Road Round Rock, Texas Description of the Proposed Project [24 CFR 58.32; 40 CFR 1508.25]: Funds will be used to replace all windows, all flooring, all closet doors and shelves in bedrooms, pantry and play areas, install attic insulation, total kitchen remodel, replace security system. Level of Environmental Review Determination: ❑ Activity/Project is Exempt per 24 CFR 58.34(a): ® Activity/Project is Categorically Excluded Not Subject To §58.5 per 24 CFR 58.35(b): 7: Approval of supplemental assistance (including insurance or guarantee) to a Droiect nreviousl' approved under this partif the approval is made by the same responsible entity that conducted the environmental review on the original project and re-evaluation of the environmental findings is not required under §58.47. Original environmental review for this project funded with CDBG 2014 funds was approved by the responsible entity on 9/29/2014 by CM -2014-537 Page 1 of 3 Project Name Project Locality and State HEROS Number Funding Information Grant Number HUD Program Funding Amount B -15 -MC -48-0514 CDBG $570,575 Estimated Total HUD Funded Amount: $90,000 This project anticipates the use of funds or assistance from another Federal agency in addition to HUD in the form of (if applicable): N/A Estimated Total Project Cost (HUD and non -HUD funds) [24 CFR 58.32(d)]: $205,000 Compliance with 24 CFR X50.4 and X58.6 Laws and Authorities Record below the compliance or conformance determinations for each statute, executive order, or regulation. Provide credible, traceable, and supportive source documentation for each authority. Where applicable, complete the necessary reviews or consultations and obtain or note applicable permits of approvals. Clearly note citations, dates/names/titles of contacts, and page references. Attach additional documentation as appropriate. Compliance Factors: Are formal Compliance determinations Statutes, Executive Orders, compliance and Regulations listed at 24 steps or CFR 50.4 and 58.6 mitigation required? STATUTES, EXECUTIVE ORDERS, AND REGULATIONS LISTED AT 24 CFR §58.6 Airport Runway Clear Zones Yes No Project is not located within 15,000 feet of a and Accident Potential Zones ❑ ® military airport runway, 2,500 feet of a 24 CFR Part 51 Subpart D civilian airport runway nor located in an Airport Accident Potential Zone. See maps of nearest airports to project site as attachment. Coastal Barrier Resources Yes No Project site is not located in or near nor will ❑ ® it impact the Texas Coastal Barrier. See Coastal Barrier Resources Act, as amended by the Coastal Barrier map of Texas Coastal Barrier attached. Page 2 of 3 Project Name Project Locality and State HEROS Number Improvement Act of 1990 [ 16 USC 3501] Flood Insurance Yes No Project site is not located in or near a flood Flood Disaster Protection Act of E]® zone. Flood map showing project site is 1973 and National Flood attached. Insurance Reform Act of 1994 [42 USC 4001-4128 and 42 USC 5154a] Mitigation Measures and Conditions [40 CFR 1505.2(c)] Summarize below all mitigation measures adopted by the Responsible Entity to reduce, avoid, or eliminate adverse environmental impacts and to avoid non-compliance or non-conformance with the above -listed authorities and factors. These measures/conditions must be incorporated into project contracts, development agreements, and other relevant documents. The staff responsible for implementing and monitoring mitigation measures should be clearly identified in the mitigation plan. Law, Authority, or Factor Mitigation Measure II N/A I N/A II Preparer Signature: Date:�-�� Name/Title/Organization: Elizabeth Alvarado, CDBG Coordinator Elizabeth Alvarado, CDBG Coordinator City Round Rock Rock Entity Agency Official Signature: Date. Name/Title: Laurie Hadley, This original, signed document and related supporting material must be retained on file by the Responsible Entity in an Environmental Review Record (ERR) for the activity/project (ref: 24 CFR Part 58.38) and in accordance with recordkeeping requirements for the HUD program(s). Page 3 of 3 CITY OF ROUND ROCK CDBG 2015 HOPE ALLIANCE SUBSTANTIAL ASSISTANCE ERR Airport Hazards (CEST and EA) General policy Legislation Regulation It is HUD's policy to apply standards to 4 FR Part 51 Subpart D prevent incompatible development around civil airports and military airfields. _ References-------- ___------.__-- https://www.hudexchange.info/environmental-review/airport-hazards 1. To ensure compatible land use development, you must determine your site's proximity to civil and military airports. Is your project within 15,000 feet of a military airport or 2,500 feet of a civilian airport? ©No 4 Based on the response, the review is in compliance with this section. Continue to the Worksheet Summary below. Provide a map showing that the site is not within the applicable distances to a military or civilian airport. El Yes 4 Continue to Question 2. 2. Is your project located within a Runway Potential Zone/Clear Zone (RPZ/CZ) or Accident Potential Zone (APZ)? ❑Yes, project is in an APZ 4 Continue to Question 3. ❑Yes, project is an RPZ/CZ -i Project cannot proceed at this location. El No, project is not within an APZ or RPZ/CZ 4 Based on the response, the review is in compliance with this section. Continue to the Worksheet Summary below. Provide a map showing that the site is not within either zone. 3. Is the project in conformance with DOD guidelines for APZ? ❑Yes, project is consistent with DOD guidelines without further action. Ex Iain how you determined that the project is consistent: 4 Based on the response, the review is in compliance with this section. Continue to the Worksheet Summary below. Provide any documentation supporting this determination. CITY OF ROUND ROCK CDBG 2015 HOPE ALLIANCE SUBSTANTIAL ASSISTANCE ERR El No, the project cannot be brought into conformance with DOD guidelines and has not been approved. 4 Project cannot proceed at this location. ❑ Project is not consistent with DOD guidelines, but it has been approved by Certifying Officer or HUD Approving Official. Explain approval process: If mitigation measures have been or will be taken, explain in detail the proposed measures that must be implemented to mitigate for the impact or effect, including the timeline for implementation. -9- Based on the response, the review is in compliance with this section. Continue to the Worksheet Summary below. Provide any documentation supporting this determination. Worksheet Summary Compliance Determination Provide a clear description of your determination and a synopsis of the information that it was based on, such as: • Map panel numbers and dates • Names of all consulted parties and relevant consultation dates • Names of plans or reports and relevant page numbers • Any additional requirements specific to your region See maps of nearest civilian and military airports. Project site is not within 15,000 feet of a military airport or 2,500 feet of a civilian airport. Are formal compliance steps or mitigation required? ❑ Yes 0 No Round Rock CDBG 2015 Hope Alliance Shelter Improvements Supplemental Assistance ERR Coastal Barrier Resources (CEST and EA) General requirements ( Legislation Regulation HUD financial assistance may not be Coastal Barrier Resources Act used for most activities in units of (CBRA) of 1982, as amended the Coastal Barrier Resources by the Coastal Barrier System (CBRS). See 16 USC 3504 for Improvement Act of 1990 (16 limitations on federal expenditures USC 3501) affecting the CBRS. References https://www.hudexchange.info/environmental-review/coastal-barrier-resources ects located in the following states must complete this form. Alabama j Georgia J Massachusetts New Jersey ! Puerto Rico Virgin Islands Connecticut Louisiana Michigan New York Rhode Island Virginia Delaware I Maine --- -.._. _. . _..... Minnesota . _ -- North Carolina South Carolina Wisconsin Florida Maryland Mississippi 1 Ohio Texas 1. Is the project located in a CBRS Unit? 1ZNo 4 Based on the response, the review is in compliance with this section. Continue to the Worksheet Summary below. Provide a map showing that the site is not within a CBRS Unit. ❑Yes 4 Continue to Question 2. Federal assistance for most activities may not be used at this location. You must either choose an alternate site or cancel the proiect. In very rare cases, federal monies can be spent within CBRS units for certain exempted activities (e.g., a nature trail), after consultation with the Fish and Wildlife Service (FWS) (see 16 USC 3505 for exceptions to limitations on expenditures). 2. Indicate your selected course of action. ❑ After consultation with the FWS the project was given approval to continue 4 Based on the response, the review is in compliance with this section. Continue to the Worksheet Summary below. Provide a map and documentation of a FWS approval. ❑ Project was not given approval Project cannot proceed at this location. Round Rock CDBG 2015 Hope Alliance Shelter Improvements Supplemental Assistance ERR Worksheet Summary Compliance Determination Provide a clear description of your determination and a synopsis of the information that it was based on, such as: • Map panel numbers and dates • Names of all consulted parties and relevant consultation dates • Names of plans or reports and relevant page numbers • Any additional requirements specific to your region Attached is a map of the Texas Coastal Barrier. Are formal compliance steps or mitigation required? ❑ Yes 0 No CITY OF ROUND ROCK CDBG 2015 HOPE ALLIANCE SUBSTANTIAL ASSISTANCE ERR Flood Insurance (LEST and EA) General requirements _Legislation i Regulation Certain types of federal financial assistance may Flood Disaster 24 CFR 50.4(b)(1) not be used in floodplains unless the community Protection Act of I and 24 CFR participates in National Flood Insurance Program 1973 as amended 58.6(a) and (b); and flood insurance is both obtained and (42 USC 4001-4128) i 24 CFR 55.1(b). maintained. _ Reference https.//"w.hudexchange.info/environmental-review/flood-insurance 1. Does this project involve financial assistance for construction, rehabilitation, or acquisition of a mobile home, building, or insurable personal property? El No. This project does not require flood insurance or is excepted from flood insurance. Continue to the Worksheet Summary. OX Yes -> Continue to Question 2. 2. Provide a FEMA/FIRM map showing the site. The Federal Emergency Management Agency (FEMA) designates floodplains. The FEMA Map Service Center provides this information in the form of FEMA Flood Insurance Rate Maps (FIRMS). For projects in areas not mapped by FEMA, use the best available information to determine floodplain information. Include documentation, including a discussion of why this is the best available information for the site. Provide FEMA/FIRM floodplain zone designation, panel number, and date within your documentation. Is the structure, part of the structure, or insurable property located in a FEMA -designated Special Flood Hazard Area? ❑X No 4 Continue to the Worksheet Summary. ❑Yes 4 Continue to Question 3. 3. Is the community participating in the National Flood Insurance Program or has less than one year passed since FEMA notification of Special Flood Hazards? ❑Yes, the community is participating in the National Flood Insurance Program. For loans, loan insurance or loan guarantees, flood insurance coverage must be continued for the term of the loan. For grants and other non -loan forms of financial assistance, flood insurance coverage must be continued for the life of the building irrespective of the transfer of ownership. The amount of coverage must equal the total project cost or the maximum coverage limit of the National Flood Insurance Program, whichever is less Provide a copy of the flood insurance policy declaration or a paid receipt for the current annual flood insurance premium and a copy of the application for flood insurance. 4 Continue to the Worksheet Summary. CITY OF ROUND ROCK CDBG 2015 HOPE ALLIANCE SUBSTANTIAL ASSISTANCE ERR Dyes, less than one year has passed since FEMA notification of Special Flood Hazards. If less than one year has passed since notification of Special Flood Hazards, no flood Insurance is required. 4 Continue to the Worksheet Summary. ❑No. The community is not participating, or its participation has been suspended. Federal assistance may not be used at this location. Cancel the proiect at this location. Worksheet Summary Compliance Determination Provide a clear description of your determination and a synopsis of the information that it was based on, such as: • Map panel numbers and dates • Names of all consulted parties and relevant consultation dates • Names of plans or reports and relevant page numbers • Any additional requirements specific to your region Project site is not located in a FEMA designated special flood hazard area. See Map #48491 C0485E dated 9/26/2008. Are formal compliance steps or mitigation required? ❑ Yes ® No i y E� YND 14Ir55 Pp E ti � 'rEC} ><i I6 6vaib4 in INS CCrnmunly. CMIaCI yVur In6Vr6M3 - F r ' * 2 hxnrafra Fmrram a; I -ECO -011,66:D X 1� Churtdlcr ; ;' LN -OL c - — y -. MAP ' Cr A( F y^ _ innn- DETAILDSTLCIY n, L111F ;• s p ZQN I -I -a+s'r\ +s nvE .IurD�ll ___-----_PANEL 0195E DVIIRY n FIRM i un�'1D I HaL�F `A `} m 7 bn'A' "fi M c FLOOD INSURANCE RATE MAP L F C'OI.'NlY. 1 TL'XAS IyAT`• �Y ti Y Ion AND TNCORKItWED ,AREAS IN It dUNtL ALAS- Y', �AHEL IOSOFTSO `F � Lun =+' arrrratx (�avrn noe sLr_a �E >' L y •,nt HEt WAAHA v4y L°Nf ER'•IWELL I•IIE tea :CITY OF ROUND R RL.r'~ i\! E' 7 r<� C �R,YE • cnlvE 48I048 : .1.e _ ti�xsY r~.nwn m.rin v�u�a LONA LWIE r�y -. cR°' >, a < otQ - ,41AV WIE R , 9A4F NUMBER 'i 1 a8t91CD195E v qCF � - c YAP REVISED ts'- -•• • SEPTEN9ER lf�2901 • G'Y I n V ..RE LhYE 1=n1•^' �TM1C} YO•In'i• 51HE=i TT Va - :0-1 'T' '� '-i' IYEtrul F]Mrl,Ynn F(,v4 mtnl.lp•nq• '' - v: .rvtn ceriE a+ `_ r v.o 3 O�+/E j; �. w R� S •OGrr ,,, Lam- i„v�•a:nl m�t< y,o<r•�>,:rrn.c°.<r�.<n:r<\>�mrF , ;�.u,ra,um m.yu�.na ,n«Ica-a:. °a-m„alns easm[v K ctv,: n I I G ] r, - � � � f,1p/O to o � � nNzan Ln, nlxu nr �,'�b•=•;,n;ns,., un<n. �may...,Kr HOPE ALLIANCE CRISIS SHELTER REHAB CDBG 2014-2015 FEMA MAP #48491C0495E DATED: 09/26/2008 Gq I KENEDY Texas, Ct .:1nagc i. iiit Pro'gram L NOW f in CHAMBERS ......... RT BE I ji KA17, ROUND ROCK, ix adriq.; jK4;jFx7 *7 UZI i'. k!M Wxrvq 0 2.0 Milo- 221 E Main St, Round Rock, TX 78664 to Austin -Bergstrom International Airport - Goog... Page 1 of 3 Directions from 221 E Main St to Austin -Bergstrom International Airport' ikduPatft _f -1 221EMr,tn St - O - • - _: i f l- � ��� k � •� ,-�-A i i rt6fdec,pr. !' 4 rrtcietmh P!h gcrOe. FIf G'Vt .1. l •� � - } . i R37 min .'.1 - ' Otis t v .. I - W clNsii { r, � 1 lmlOttk -1 } ,.- 0. thcpotiwi Woo, i emsib«k -. natte•.gmo� _ nt tc •. m - _ . msn.ry sett �y AUsti j � .SmnelV t sc�'' •1 tR<,• � AutWt-Berytchom� ' � - � o 221 E -Main St Round Rock, TX 78664 Get on I-35 S/S Interstate 35 from Round Rock Ave min Q 1. Head west on E Main'St toward S Lampasas St 0.1 mi 2. Continue onto Round Rock Ave 0.5 mi 3. Turn left onto Interstate 35 Frontage Rd 0.3 mi 4. Take the Interstate 35 S ramp on the. left --0.2 mi Take TX -45 E/TX-45 Toll and TX -130 S to Texas 130 Service Rd in Travis County. Take exit 449 from TM 30 S !;•.tet •tri � �v, : ' �. `r.;;�, : , � 221 E Main St, Round Rock, TX 78664 to Austin -Bergstrom International Airport - Goog... Page 2 of 3 Take TX -71 W to Presidential Blvd in Austin —3..6.mi-/-5 min A 11. Merge onto Texas 130 Service -Rd cJp A Toll road i •_ CcCrtPck ----^--•— — 0.3 mi 27.1 -mi./ -22 min :I is Take the Texas 71 W ramp to Austin f VWaVF� 1` - .i`oa7rlie 5. Merge onto I-35 S/S Interstate 35 irior 13. Merge onto TX -71 W 1-1 mi sem% !j r` ism .6. Take exit 25013 toward TX-45/TX-1 } }o 14. z�s Toll road bee Gre weii .;:... %lusU lnt'I Airport mi -- 0.5 mi ©, ' t 7. Keep left at the fork, follow signs for - Atbari Berys i o ml.m:,Jan,�u _— Rd Texas 45 and merge -----. 0.1 mi Toll ' 16. iL Toll road f... — —0.5 mi 8. Take the Texas 45 Toll S/Texas 130 Toll S exit toward Austin Toll road 0,9 mi 9. Merge onto Texas 45Toll/TX-130 S Q Continue to follow TX -130 S Partial toll road 1.9.4 mi 10. Take exit 4.49 toward Texas 71/Austin/Houston Toll road 0:3 mi Take TX -71 W to Presidential Blvd in Austin —3..6.mi-/-5 min A 11. Merge onto Texas 130 Service -Rd i 'MideGj'.� 1 ' amp: int A(rpon0 . - i. t i a Z O cJp A Toll road — 0.3 mi 12. Take the Texas 71 W ramp to Austin !, Toll road ------- 0.3 mi irior 13. Merge onto TX -71 W — -- 1.9 mi 14. Take the exit toward Austin–Bergstrom lnt'I Airport mi t....... ................ t 15. Continue onto E State Hwy 71 Service Rd -----. 0.1 mi 16. Turn left.onto Presidential Blvd — —0.5 mi i 'MideGj'.� 1 ' amp: int A(rpon0 . - i. t i a Z O cJp ip )rnin irior t....... ................ —..__.,_._.:...: i 'MideGj'.� 1 ' amp: int A(rpon0 . - i. t i a Z O 221 E Main St, Round Rock, TX 78664 to Austin -Bergstrom International Airport - Goog... Page 3 of 3 `1 17. Keep left to continue toward Presidential Blvd mi t 18. Continue onto Presidential Blvd _0.2 mi G) Austin -Bergstrom International Airport 3600 Presidential Boulevard, Austin, TX 78719 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 221 E Main St, Round Rock, TX 78664 to Georgetown Municipal Airport - Google Maps Page 1 of 2 Directions from 221 E Main St to Georgetown .Municipal Airport o 221 E Main St Round Rock, TX 78664 Get on 1-35 N from Round Rock Ave and Interstate 35 Frontage Rd 1-.O.mi./-3 min 1. Head west on E Main St toward S Lampasas St mi 2. Continue onto Round Rock Ave 0.4 mi 3. Turn right onto Interstate 35 Frontage Rd A 4. Take the ramp on the left onto 1-35 N Follow 1-35 N to N Austin Ave in Georgetown. Exit from 1-35 N 0 min -Z1 --- - -- --- -- - - v - ---- — --------- mg.-A. SeriNJa :•... MvnldpalA4paf- u � .S++ryef➢ k _ '-. I .. .� \i` 0 -. Ylar�- tgplown� it .-,®.. O•i. V V � EU M EEO ITE9minjig] 10 ^�� U'• scv3natWRSmsm' - _ : - r•+ - .' i p - .;� i p . CtGFvakQnler Q � ;: -.' M� .. - '_II ...ilutfi j ,p D PR .R'• ' - �+_.._..�_��•._—_ .....____——...:... L_..._.--'----__A227EMgn 5L.c•C'. c.na-...-...-:_._: .—.--__: t",1.._.._.. _.—.-...._... _._. o 221 E Main St Round Rock, TX 78664 Get on 1-35 N from Round Rock Ave and Interstate 35 Frontage Rd 1-.O.mi./-3 min 1. Head west on E Main St toward S Lampasas St mi 2. Continue onto Round Rock Ave 0.4 mi 3. Turn right onto Interstate 35 Frontage Rd A 4. Take the ramp on the left onto 1-35 N Follow 1-35 N to N Austin Ave in Georgetown. Exit from 1-35 N 0 min -Z1 --- - -- --- -- - - v - ---- — --------- mg.-A. SeriNJa :•... r— - I 221 E Main St, Round !Lock, '1'X 8664 to Georgetown Municipal Airport - Uoogle Maps rage z oT 2 5. Merge onto 1-35 N o 10.9 mi _ .:p c" » i. t 6. Take the exit toward N Austin Ave "' q,9 m,, p --_..,— 0.4 mi lGSldtl'i .. O 1 - •`)•. : em:yamt 22I'EMain* - .. CnTarPStk` - - _ v11r-0uapn: 7 . IV3.91 `nth ' 1, �1 t. r"In PUyilnlh :: - jif ;; . Continue on N Austin Ave. Take Lakeway Dr and Airportrminai o R d e Dr t T Georyatnlitl� l .. --- 1Ami./-4min � Ma�+�P;n� ` , r, • pro :•.. 1. t 7. Tum left onto N Austin Ave — — —0.3 mi B. Turn left onto Lakeway Dr i „� a '• 9. Continue onto Co Rd 190A •;� _— _.---- 0.1 mi �' 10. Tum right to stay on Co Rd 190 A --- 128 ft Ir 11. Turn right onto Airport Rd r. ---_—.—. 0.4 mi - -- '41 12. Turn left onto Terminal Dr .. :: .L_GtapCorm IGLI15GlN '. - :91 Destination will be on the right -- -- 0:3 mi O Georgetown Municipal Airport 500 Terminal Drive, Georgetown, TX 78628 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 221 E Main St, Round Rock, TX 78664 to Austin Executive Airport - Google Maps Page 1 of 3 Goy-Sfe Directions from 221 E Main St to Austin Executive Airport o o — 5 two 1, 0 1 C�dnrPmfc - 221 E%rje,nSl 1 �roK,� EM .•R =es,v``i ° � tin?'"° �� D l�••1, � _ .® - -� a'..," m„_ pr .. - u i �, t g2 �'v 13iiiaw`Fic:vw_ darport(5 - ' ,icy '3Gal O o 221 E Main St Round Rock, TX 78664 Get on 1-35 S/S Interstate 35 from Round Rock Ave min Y 1. Head west on E Main St toward S Lampasas St --- 0.1 mi Q 2. continue onto Round Rock Ave 0.5 mi 3. Turn !eft onto Interstate 35 Frontage Rd —0.3 mi 4. Take the Interstate 35 S ramp on the left --02 mi Take TX -45 EITX 45 Toll and TX -1 go S to TX -130 Service Rd in Travis County. Take ; o,.:' -o•. exit 432 from TX -130 S°� t..._.. _.___... _. :U_221EMmn3Y S✓n,o% ._._..�_ ..__r -u Eli 221 E Main St, Round Rock, TX 78664 tc Austin Executive Airport - Google Maps Page 2 of 3 ..b:••_-- ._a _. ?I fall min --- ------ 10.8.mi./-9 min. .. smr� �; © L 5. Merge onto 1-35 S/S Interstate 3571 mi 6. Take exit 250B toward TX-45/TX-1 Toll road 0.5 mi 7. Keep left at the fork, follow signs forF�� o �o rte' —.—_ _T.exas-_45.and.merge_ontoTX-45.E/_TX-.45—.... :' Toll auAmEUCVWcki' r� Toll road -- 5.0 mi i :._._:e_._..__ ........_ ....:.::..........._......._......_. _._ ... ' �� ....E 8. Take the Texas 45 Toll S/Texas 130 Toll S exit toward Austin z�,, Toll road — 0.9 mi 9. Merge onto Texas 45 Toll/TX-130 S ?s Continue to follow TX -130 S Toll road -- 3:1 mi 10. Take exit 432 for Cash Lanes toward Cameron Rd I Toll road ---• —0.3 mi Continue on TX -130 Service Rd to your destination { \` 1 -7 -mi•/ -4 min 11. Merge onto TX -130 Service Rd 1 "_ Toll road j o f --! ` --------- 0.5 mi 12. Keep right at the fork to continue on Exit 432, follow signs for Cameron Rd �:11 ;� ,_ Toll road -- --- 0.3 mi 13. Sharp left onto Cameron Rd Partial toll road (� 14. Sharp right onto TX -130 Service RdA s.:.::.._....:..: '.:__...._.. ........ +e u no....._.: ---•- —01 mi jj 15. Turn left onto Aviation Drive — -- ---- ---0.7 mi 221 E Main St, Round Rock, TX 78664 to Austin Executive Airport - Google Maps Page 3 of 3 49 16. Turn left aQ Destination will be on the left ft o Austin Executive Airport . 6012 Aviation Drive, PPlugerville, TX 78660 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the - map results, and you should plan your route accordingly. You must otiey aall signs or • - notices regarding your route. 221 E Main St, Round Rock, TX 78664 to Taylor Municipal Airport - Google Maps G®:--jule Directions from 221 E Main St to Taylor Municipal Airport Page I of 1 AN 'O Tajrt'almuddPAAlrport_ Taylor ^f / iGGrric 1. Head east. on E Main St toward N Sheppard St p 0.3 mi 2. Turn left onto North Georgetown Street 41 — 0.5 mi 3. Turn right onto US -79 N/E Palm Valley Blvd p & Continue to follow US -79 N — 14.4 mi 4. Turn left onto Airport Rd Q Destination will be on the left Mi o Taylor Municipal Airport 303 Airport Road, Taylor, TX 76574 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 17— F I L: vmmzo k�:�—` aWxsn.a, ;- t I � � i21 E lA6+n St•Or' - o 221 E Main St Round Rock, TX 78664 Page I of 1 AN 'O Tajrt'almuddPAAlrport_ Taylor ^f / iGGrric 1. Head east. on E Main St toward N Sheppard St p 0.3 mi 2. Turn left onto North Georgetown Street 41 — 0.5 mi 3. Turn right onto US -79 N/E Palm Valley Blvd p & Continue to follow US -79 N — 14.4 mi 4. Turn left onto Airport Rd Q Destination will be on the left Mi o Taylor Municipal Airport 303 Airport Road, Taylor, TX 76574 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 221 E Main St, Round Rock, TX 78664 to Lago Vista Tx - Rusty Allen - Google Maps Google Directions from 221 E Main"St to Lago Vista Tx - Rusty Allen Page 1 of 3 o 221 E Main St Round Rock, TX 78664 Get on 1-35 S/S Interstate 35 from Round Rock Ave min t 1. Head west on E Main St toward S Lampasas St -- — --- ---0.1 mi 4 2. Continue onto Round Rock Ave - —•-- —0.5 mi ,4=1 3. Turn left onto Interstate 35 Frontage Rd — —0.3 mi 4. Take the Interstate 35 S ramp on the left -------- .... -- --- ---------o.2mi Take TX -45 W/TX 45 Toll and Route 183A N to Farm to Market Rd 1431 W/FM1431/E Whitestone Blvd in Cedar �-M�iltt �:� as � -'" :0 •?�;;,, r 221 E Main St, Round Rock, TX 78664 to Lago Vista Tx - Rusty Alen - Google Maps Page 2 of 3, ..: RU min Park. Take the FM 1431 exit from Route 17-=mr: o: 183A N . � Cedar P _-. / =ZTEMrin51j 13.3•mi•/-1.2min i =1 ava U6 C 5. Merge onto 1-35 S/S interstate 35 r�kiu.. ti o 1 1 rn 6. Take exit 2508 toward TX-45/TX-1 `• '� ul,> te' o ;"T/ r 0:5 mi t © a4 7. Keep right at the fork, follow signs for Texas 45 and merge onto TX -45 W/TX- =--- -- _. __ v..__� s____.: 45 Toll r Toll road — -- ---7-1 mi f' 8. Take the exit toward US -183 N & Toll road -- — 1..2 mi 9. Merge onto Route 183A N ^. Toll road --- 3.2 mi 10. Take the FM 1431 exit toward Cedar Park/Round Rock -- 0.3 mi Continue on Farm to Market Rd 1431 W. Mal Drive to Bar K Ranch Rd in Lago Vista --- --- — 13.9•mi•/-21 min ®' o .. . !. •I X78 min' 11. Turn left onto Farm to Market Rd 1431 W/FM1431/E Whitestone Blvd Continue to follow Farm to Market Rd ?RU.tyAJIbi ,wrnyai.sQ.. JM 6- 1431 W 4j y. - 1.2 5 mi ;.. uixwr • - ' rF' 12. Turn right onto Bar K Ranch Rd Yr!° o� mi 13. Turn left to stay on Bar K Ranch Rddo: { Q Destination will be on the right =, 1.0 mi L , .y ;Rudcon rend O Lago Vista Tx - Rusty Allen Bar K Ranch Road, Lago Vista, TX 78645 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the 221 E Main St, Round Rock, TX 78664 to Killeen -Fort Hood Regional Airport - Google ... Page 1 of 2 Goes Directions from 221 E Main St to Killeen -Fort Hood Regional Airport --- ........... ....: Temple --Fare Hoodr ® _ '- - - �FiipiooalA$poii� �'4--�.,eet+ �0 �u 1 i i 1 TAI - 'Meee • • v'r elido [i • t l R52mini - G' • eloYrtl OO � 'O Wrttt Fall. Iloi-xJwe6�y i �-,. l7iwnU IYIQCfe _! � �{ IpFNI� : 11 Co_ O. .. -V�4L .. _ �.`O_- 0ldar.quk [U721EMmn S_t - �• � . •f• o 221 E Main St Round Rock, TX 78664 Get on 1-35 N from Round Rock Ave and Interstate 35 Frontage Rd T.O.mi-/-3 min 1. Head west on E Main Sttoward S Lampasas St mi t 2. Continue onto Round Rock Ave 0.4 mi f 3. Turn right onto Interstate 35 Frontage Rd — --0.3 mi 4. Take the ramp on the left onto 1-35 N -- - ----•--0.2 mi r r; 4 Follow I-35 N and TX -195 W to S ClearC. Creek Rd in Killeen. Exit from TX -195W - --- ------42-.9-mil40 min 1 TAI - r r; 4 Follow I-35 N and TX -195 W to S ClearC. Creek Rd in Killeen. Exit from TX -195W - --- ------42-.9-mil40 min 221 E Main St, Round Rock, TX 78664 to Killeen -Fort Hood Regional Airport - Google ... Page 2 of 2 IGII°en•FortH°°d .." in LOeh°n in"c 5. Merge onto 1-35 N 10.9 mi o sme° O 6. Take the exit toward N Austin Ave 0.4 ml eu�n p j I � 52 mm . O. 41 7. Turn left onto N Austin AveAl s 0.3 mi _ �,nr�,lmivrnr",ytyPe+k 227EMmn St - �' 8. Slight right onto Interstate 35 FrontageY Rd — -- aD,il _©�_..__...._._. 2.1 mi �� 3 ran °,cy Austin O - Q1 9. Turn left onto TX -195 W "'1 10. Slight left to stay on TX -195 W -- 24.1 mi 11. Take the exit toward S Clear Creek Rd ----- -- ----- - --0.3 mi Follow S Clear Creek Rd to your 41 g destination 3:7-mi•%5 min o: E1 12. Turn left onto S Clear Creek Rd -- - ----- 3.3 mi I iY O �1 13. Turn left ; Ku�-Fhdgood 0.4 mi - j i r• s y i O Killeen -Fort Hood Regional Airport 8101 South Clear Creek Road, Killeen, TX 76549 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 221 E Main St, Round Rock, TX 78664 to Skylark Field (ILE) (City of Killeen) - Google ... Page 1 of 2 Go,,----gle Directions from 221 E Main St to Skylark Field (ILE) (City of Killeen) ....... - •�I ., - Skylck Feld � �:^•: -Tcmplc .'�'- (Gfy of f t GD I i •...� _ ...caraan o ;a :o -- •[+�ttrflln f Xeq� tnd O _ - . _ 1 'Y . Toad* !tiorufhocEar : - - � � 7oNer _- ':.. - -y�.-•-H�f,A}aiil rilc8ftlkhM --!fin � - Ifumn 221EIMTnSI �r . �. F i �.,. - cedar"1Nt Q. i ' L��a� N,to -E' Wndnrt(e f o 221 E Main St Round Rock, TX 78664 Get on 1-35 N from Round Rock Ave and Interstate 35 Frontage Rd ---------- - -- 1.O mi•/ -3 min t 1. Head west on E Main St toward S Lampasas St mi Y 2. Continue onto Round Rock Ave 0.4 mi 3. Turn right onto Interstate 35 Frontage Rd 0.3 mi 4. Take the ramp on the left onto 1-35 N mi Follow 1-35 N and TX -195 W to W Stan Schlueter Loop in Killeen. Take the Farm Vii`. - _-- - - rte: •`+:. - -. .................. -- - - n 221 E Main St, Round Rock, TX 78664 to Skylark Field (ILE) (City of Killeen) - Google ... Page 2 of 2 to Market Rd 3470/Stan Schlueter Loop exit from TX -195 W -44.4.mi•/-42 min A 5. Merge onto 1-35 N 10:9 mi .6. Take the exit toward N Austin Ave 04mi '01 7. Turn left onto N Austin Ave ^? Continue on W Stan Schlueter Loop to your destination 9.mi./-1.1 min r 12. Turn right onto W Stan Schlueter Loop 4.:1 mi 13. Turn right onto Martin Luther King Jr Blvd ---•---• 0.6 mi 41 14. Turn left onto Stonetree Dr mi 1 15. Tum left Q Destination will be on the right --- 30 ft p Skylark Field (ILE) (City of Killeen) 1523 Stonetree Drive, Killeen, TX 76543 _.;Killeen..' p rte- � �• i ��� .. t 4 d LE en 44. These directions are for planning purposes only. You may find that construction projects, traffic; weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. -- 0.3 mi 8_ Slight right onto Interstate 35 Frontage Rd ---2..l mi '01 9. Tum left onto TX -195 W 5.0 mi "�k 10. Slight left to stay on TX 195 W ------- — 25.7 mi 11. Take the Farm to Market Rd 3470/Stan Schlueter Loop exit - -- 0.2 mi Continue on W Stan Schlueter Loop to your destination 9.mi./-1.1 min r 12. Turn right onto W Stan Schlueter Loop 4.:1 mi 13. Turn right onto Martin Luther King Jr Blvd ---•---• 0.6 mi 41 14. Turn left onto Stonetree Dr mi 1 15. Tum left Q Destination will be on the right --- 30 ft p Skylark Field (ILE) (City of Killeen) 1523 Stonetree Drive, Killeen, TX 76543 _.;Killeen..' p rte- � �• i ��� .. t 4 d LE en 44. These directions are for planning purposes only. You may find that construction projects, traffic; weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. City of Round Rock ROUND ROC TEXAS Agenda Item Summary Agenda Number: Title: Consider executing the Categorically Excluded not Subject to Section 58.5 per 24 CFR 58.35 (b) (7) for the Hope Alliance Shelter Improvements CDBG Program Year 2015-2016 Environmental Review Record. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/5/2016 Dept Director: Susan Morgan Cost: Indexes: Attachments: Hope Alliance 2015 ERR forms for Legistar.pdf, LAF.pdf Department: Finance Department Text of Legislative File CM -2016-1027 Consider executing the Categorically Excluded not Subject to Section 58.5 per 24 CFR 58.35 (b) (7) for the Hope Alliance Shelter Improvements CDBG Program Year 2015-2016 Environmental Review Record. In order to achieve HUD's goal of providing a safe, suitable living environment, an Environmental Review Record (ERR) is required to be conducted for every project that is funded with Community Development Block Grant (CDBG) funds. The City Manager is the Certifying Officer for any projects funded with CDBG. The Environmental Review Record (ERR) is a written record of the environmental review undertaken for each project and shall be available for public review and must contain all of the recommended formats. The ERR must contain all of the environmental review documents, public notices, written determination and any environmental review findings pertaining to the decision making and actions related to individual project. The City of Round Rock CDBG Program Year 2015-2016 Hope Alliance Shelter Improvements Rehabilitation project required the following level of ERR be conducted and executed by the Certifying Officer: Categorically Excluded not Subject to Section 58.5 per 24 CFR 58.35 (b) (7)• The CDBG 2015-2016 funding in the amount of $90,000 will be combined with the CDBG 2014-2015 funding in the amount of $75,000 to complete the following improvements: installation of insulation, replacement of all windows, flooring, shelves and doors in pantry and play areas, security system, as well as a total kitchen remodel. Staff recommends approval. City of Round Rock Page 1 Printed on 2/512016