CM-11-04-074ROUND ROCK, TEXAS PURPOSE. PASSION, PROSPERITY, City Manager Approval Summary Sheet Consider executing Quantity Adjustment/Change Order No. 1 with Chasco Constructors Item Caption: for the North Mays Extension Project. Approval Date: April 15, 2011 Department: Infrastructure Development and Construction Management Project Manager: Lance Shellenberger Item Summary: This quantity adjustment/change order is needed to address the following: • While excavating for the new roadway, the contractor discovered 2-12" water mains that require extension beyond the proposed sidewalk, a sewer service that requires extension, and an air release valve that needs to be abandoned. • The contractor also discovered a buried wastewater manhole that needs to be brought to proposed finish grade. • The Crystal Park sign on the northeast corner of North Mays Street and Old Settlers Boulevard needs to be removed and disposed of. Its removal was not negotiated in the right-of-way acquisition.) • An existing storm sewer junction box planned to be capped and left in place had two existing lines coming into the box at an elevation that would not allow it to be capped, so the installation of a traffic -rated ring and cover at proposed pavement grade is required. • A special storm sewer manhole is required to resolve a conflict with a proposed storm sewer line and an existing storm sewer line. • The plans did not call for the type of countdown peds, therefore, at the request of the signal department, a change is required to meet current City standards. • A minor adjustment to an existing phone cable is necessary to avoid a conflict with the proposed sidewalk. Strategic Plan Relevance: 26.0 - Construct major element of transportation and mobility system as approved by Council in the Master Transportation Plan. Cost: $20,261 Source of Funds: Round Rock Transportation Development Corporation Construction REV. 6/10/10 /IIOUNI) ROf.K, TI'%AS man rev, 0910 Department: Project Name: City Project ID Number Contract Quantity Adjustment/Change Order Infrastructure Development & Construction Management North Mays Street Improvements TXOIARTM Justification Page 1 of 3 Date: April, 2011 Change Order/Quantity Adjustment No. These changes are needed due to unknown existing infrastructure needing adjustments and addition of countdown peds to the project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared By. Contractor Approval: Signatur ignatures andApprova City Staff Approval: City Offici Approval: Signature 1.\1\• 16. Amount % Change w"Y $2,147,473,80 $0.00 $1,600.00 $1,600.00 $2,149,073.80 $0.00 $18,661.00 $18,661.00 $2,167,734.80 0.00% 0.87% 0.87% 300 Calendar Days 300 Calendar Days 316 Calendar Days Lance Shellenberger, Project Manager, CORR 3 "34 -/ Printed Name, Title and Company Date Charles J. Glace, Jr.; President; Chasco Constructors Printed Name, Title and Company Danny Halden, P.E., CORR,C,% t ;ate Printed Name, Title Steve Norwood, City Manager, CORR Printed Name, Title 3 3fr PI Date 3/.? Date 441 Date ROUND ROCK TINS Pk Itgl rev, 09/10 Contract Quantity Adjustment/Change Order Change Order Data Page 2 of 3 Bid Item # Item Description and Change Unit Qty, Unit Price Amount Contract Time Adjustment (Days) CO1.1 Demo Chrystal Park sign on NE corner. EA 1 $1,983.00 $1,983.00 2 C01.2 Extend 12" mains twice at Sta. 110+16 & Sta. 112+69 to get behind sidewalk. EA 1 $4,500.00 $4,500.00 2 CO1-3 Relocate sewer service cleanout at Round Rock Auto. EA 1 $750.00 $750.00 1 CO1.4 Abandon air release valve at Sta. 108+31. EA 1 $500.00 $500.00 0 C01.5 Add countdown peds for traffic signal. EA 1 $750.00 $750.00 0 C01-6 Add new R&C to storm water J -box at Sta, 99+25. EA 1 $752.00 $752.00 5 CO1-7 Lower AT&T cable from Sta. 109+75 to Sta. 110+00 by hand. Authorized by Lance. EA 1 $387.00 $387.00 1 C01.8 Add storm sewer J -box at Sta. 99+40L to allow existing/conflicting 27" RCP to pass through. EA 1 $9,039.00 $9,039.00 5 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $18,661.00 16 rev, 0910 Contract Quantity Adjustment/Change Order Qunatity Adjustment Data Page 3 of 3 Bid Item # Item Description and Change Unit Qty, Unit Price Amount Contract Time Adjustment (Days) 122 Add manhole adjustment with eccentric cone at Greenhil Blvd,, Sta, 11+10, EA 1 $1,600.00 $1,600.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0,00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 TOTALS: $1,600,00 0