CM-2014-412City of Round Rock Agenda Item Summary Agenda Number: Title: Type: Governing Body: Agenda Date: Dept Director: Cost: Indexes: Attachments: Department: Consider executing Supplemental Contract No. 8 with Huggins/Seiler & Associates, LP for the Mays Street Reconstruction Phase 1 Project. City Manager Item City Manager Approval 5/9/2014 Gary D. Hudder, Transportation Director $7,981.40 RR Transportation and Economic Development Corporation (Type B) LAF- SC#8 W -Huggins -Seiler -Mays St. (00298026xA08F8), SC#8 w -Huggins -Seiler for Mays Street Reconstruction Phase 1 (00298018xA08F8), swa8 Exhibit D, exhibit B supp 8, Info Sheet_SA #8_HSA Mays St Reconstruction (2) Transportation Department Text of Legislative File CM -2014-412 Mays Street Reconstruction provides for the widening of North Mays Street from a four lane arterial to a five lane section between the Brushy Creek Bridge and the Union Pacific Railroad/Lake Creek Bridge. This includes the sidewalks, street trees and lighting, utility relocations, and gateway features. The initial engineering services contract consisted of a preliminary schematic, surface utility engineering, utility coordination, field surveying and mapping, land appraisal services, TCEQ coordination, and a 30% design schematic at a cost of $235,288.80. Supplemental Contract (S.C.) No. 1 provided for additional surveying services at a cost of $6,166. S.C. No. 2 provided for the development of complete plans, specifications, and PS&E from the approved design schematic at a cost of $324,195. S.C. No. 3 provided for additional right-of-way appraisal, preparation of environmental documents, and final design plans at a cost of $64,699.40. S.C. No. 4 provided for additional engineering services for the design and detailing for illumination supports at the Brushy Creek Bridge, additional site verification at Bent 16 on the UPRR Bridge, and detailing for a more complex gateway arch structure at a cost of $3,345. S.C. No. 5 asked for $38,313.40 to cover the revision of PS&E plans, HUD environmental documents, and the Water Pollution Abatement Plan (WPAP) to include Main Street improvements from Blair Street to Mays Street. S.C. No. 6 provided four AT&T test holes and a new WPAP submission at a cost of $10,178. TCEQ has required the City to submit a new WPAP including Main Street improvements from Blair Street to Mays Street instead of revising the WPAP originally submitted for this project. City of Round Rock Page 1 Printed on 5/7/2014 Agenda Item Summary Continued (CM -2014-412) S.C. No. 7 included the addition of aesthetic treatments and illumination to the Union Pacific Railroad bridge planned as a memorial to the Baylor University basketball team. The bridge will be known as the "Immortal X Bridge". S.C. No. 7 provided for the addition of these Illumination and Aesthetic Detail sheets as well as the revision of completed plan sheets for Traffic Control on Round Rock Avenue and the addition of Traffic Control plan sheets on Mays as required by the inclusion of the "Immortal X Bridge" motif. S.C. No. 8 includes changes to the plans and bid documents for revisions to the structural design of the gateway arches and multiple revised illumination designs to accommodate revised criteria for the "Immortal X Bridge". The cost of S.C. No. 8 is $7,981.40 and will bring the total cost of the contract with Huggins/Seiler and Associates to $727,699.00. Staff recommends approval City of Round Rock Page 2 Printed on 5/7/2014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Mgr/Resource: Leah Coffman Council Action: ORDINANCE Agenda Wording Project Name: Mays Street Reconstruction Phase 1 ContractorNendor: Huggins/Seiler & Associates, LP ni RESOLUTION xx City Manager Approval CMA Wording Consider executing Supplemental Contract No. 8 with Huggins/Seiler & Associates, LP for the Mays Street Reconstruction Phase 1 Project. Attorney Approval Q✓ Attorney Notes/Comments I 5N, 1-1,,w%S scfP. kf4 -#+ 8 -r�.0Ktj - ti cam Date ((I ki O:\wdox\SCCInts10199\73011MISC100298026.XLS Updated 6/3/08 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 8 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER & ASSOCIATES, LP ("Engineer") ADDRESS: 116 East Main Street, Round Rock, TX 78664 PROJECT: Mays Street Reconstruction Phase 1 This Supplemental Contract No. 8 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and I-Iuggins/Seiler & Associates, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of November, 2011 for the Mays Street Reconstruction Phase I Project in the amount of $235,288.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 3, 2012 to amend the scope of services and to increase the compensation by $6,166.00 to a total of $241,454.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on April 26, 2012 to amend the scope of services and to increase the compensation by $324,195.00 to a total of $565,649.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on Novetnber 8, 2012 to amend the scope of services and to increase the compensation by $64,699.40 to a total of $630,349.20; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on February 8, 2013 to amend the scope of services and to increase the compensation by $3,345.00 to a total of $633,694.20; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on March 8, 2013 to amend the scope of services and to increase the compensation by $38,313.40 to a total of $672,007.60; and WHEREAS, the City and Engineer executed Supplemental Contract No. 6 on May 3, 2013 to amend the scope of services and to increase the compensation by $10,178.00 to a total of $682,185.60; and Supplemental Contract 0199.7301; 00298018 CM -2014-412 Rev.12/01/08 84275 WHEREAS, the City and Engineer executed Supplemental Contract No. 7 on December 9, 2013 to atnend the scope of services and to increase the compensation by $37,532.00 to a total of $719,717.60; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $7,981.40 to a total of $727,699.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $7,981.40 the lump sum amount payable under the Contract for a total of $727,699.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HUGGINS/SEILE By: ASSOCIATES, LP 5-/-14 Date CITY OF ROUND ROCK By Date Sk-eve Nc.v4zsS1l .r"A iy/j1 Supplemental Contract 0199.7301; 00298018 2 APP t O % FORM: ephan L .eets, City Attorney Rev.12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The work to be performed under this contract shall consist of providing engineering services required for the development of PS&E for revisions to Mays Street and West Main Street. PS&E will be developed for letting and construction by the City of Round Rock. This revision to the contract includes changes to the structural design of the Gateway Arches and multiple revised illumination designs to accommodate revised criteria for the Immortal X Bridge motif. 1) COLLECT AND REVIEW DATA (Function Code 110): a) Data Collection: The Engineer will collect, review and evaluate: i) As -built plans, existing schematics, right-of-way maps, and current unit bid prices information. ii) Utility plans and documents from appropriate municipalities and utility companies. b) Field Reconnaissance: The Engineer will conduct field reconnaissance and collect data as necessary to complete the project development. 2) ILLUMINATION DESIGN (Function Code 163) a) Prepare continuous Illumination Design i) Layouts. (1) Horizontal location of illumination poles. (2) Conduit location and size. (3) Conductor runs and size (4) Power drop locations (5) Special mounting details for bridges and retaining walls (6) Summary of Quantities (7) Standards 3) PROJECT MANAGEMENT (Function Code 190): a) Prosect Coordination: The Engineer will direct and coordinate the various elements and activities associated with project development. b) Project Administration: The Engineer will perform administrative duties, including: i) Coordination with subconsultants. ii) Preparing and executing contracts with subconsultants. iii) Monitoring subconsultant activities. iv) Reviewing and recommending approval of subconsultant invoices. Deliverables • Monthly progress reports. • Monthly invoice and billings. 1 c) QA/QC: The Engineer will provide ongoing quality assurance and quality control to ensure completeness of product and compliance with City of Round Rock procedures. d) Progress Meetings: The Engineer will attend progress meetings with the City of Round Rock on an as needed basis. 2 ADDENDUM TO EXHIBIT D Fee Schedule Task Total Labor Hours Total Loaded Labor Cost Other Direct Costs Subconsultants TOTALS Task 1: (e.g. surveying) 0 $ - $ - $ - $ - Task 2: (e.g. right of way appraisal) 0 $ - $ - $ - $ - Task 3: (e.g. subsurface utility engineering) 0 $ - $ - $ - $ - Task 4: (e.g. environmental document preparation) 0 $ - $ - $ - $ - Task 5: (e.g. preliminary design/ 30% plans) 0 $ - $ - S - $ - Task 6: (e.g. final design/ 60%, 90%, 100% plans) 186 $ 20,955.00 $ - $ 6,940.00 $ 27,895.00 Task 7: (e.g. bid phase services) 0 $ - $ - $ - Task 8: (e.g. constriction phase services) 0 $ - $ - $ - $ - Task 9: (e.g. project management) 0 $ - $ - $ - Sub Total 186 $ 20,955.00 $ - $ 8,940.00 $ 27,895.00 Less Remainder in Contract $ 19,913.60 GRAND TOTAL: S 7,981.40