Loading...
CM-12-02-028ROUND ROCK, TOCAS PURPOSE i c -17 01-6RECEAVED FEB 092012 City Manager Approval Form Consider executing Quantity Adjustment/Change Order No. 3 with Austin Traffic Construction Company, LP for the US 79 at Sunrise Road - Traffic Signal Replacement Project. Item Caption: Approval Date: February 10, 2012 Department Name: Transportation Department Project Manager: Bill Stablein Assigned Attorney: Steve Sheets Item Summary: US 79 at Sunrise Road Traffic Signal Replacement was approved by the City Council on February 24, 2011, to replace the traffic signal poles with a mast arm set up and to install upgraded equipment at the cost of $194,932. Quantity Adjustment/Change Order No. 1 was approved to purchase and install a new double mast at the cost of $4,284.66. Quantity Adjustment/Change Order No. 2 added a steel sidewalk plate over an existing flume structure and adjusted the sidewalk to accommodate the flume structure at the cost of $1,536.77. Quantity Adjustment/Change Order No. 3 in the amount of $5,256 is needed to adjust for final quantities so that the project can be closed out. The final cost of the contract with Austin Traffic Signal Construction Company, LP would be $206,009.43. No. of Originals Submitted: Two Project Name: US 79 at Sunrise Road Traffic Signal Replacement Cost: $5,256 Source of Funds: RR Trans Dev Corp Construction Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: Cheryl Delaney Date: 2/7/12 Department Director Approval: Gary Hudder Date: 2/5/12 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP 111 Budget n ❑ Purchasing 111 Accounting ❑ L N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Contract Quantity Adjusbt/ce Order ,ev. i/10 Department: Tra Administration Project Name: US 79 (6 Sunrise Road Traffic Signal Upgrade City Project ID Number: Justification Quantity overran expected quantity SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s). This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Page 1 of 3 Date: 1/25/2012 Change Order/Quantity Adjustment No. 3 Amount $194,932.00 $194,932.00 $5,721.43 $0.00 $5,721.43 $5,256.00 $5,256.00 $205,909.43 % Change 2.94% 0.00% 2.94% I M rIZ-0 2- -0225 TEXAS/111°-'..- rev. 01/10 Bid Item# Page 2 of 3 Contract Quantity Adjustment/Change Order Item Description and Change Chan e Order Data Contract Time Adjustment Unit Qty. Unit Price Amount (Days) 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $0.00 0 ....f111°..... - ROAD ROO( 1E05 AMYL MINIM FMCGITIOM rev. 01/10 Bid Item# 05-2004 07-2024 08-2018 09-2022 10-2023 14-2014 17-2044 18-2047 19-2156 20-2157 21-2001 22-2003 23-2007 49-2003 Contract Quantity Adjustment/Change Order Item Desai .. and Cha CONC CURB & GUTTER (TY II) CONC SIDEWALK (5 IN) COND (PVC SCH 40) 2 IN COND (PVC SCH 40) 3 IN GOND (PVC SCH 40) 3 IN BORE GROUND BOX (TY D) W/APRON REF PVMK (TY I -W) 18 IN SLD 90M REF PVMK (TY I -W) 24 IN SLD 90M REF PVMK (TY II -W) 18 IN SLD REF PVMK (TY II -W) 24 IN SLD ELIM EXIST PVMK (4 IN) ELIM EXIST PVMK (8 IN) ELIM EXIST PVMK (24 IN) EMERGENCY PREEMPT DET CABLE uan ' Ad'ustment Data Unit SY SY LF LF LF EA LF LF LF LF LF LF LF LF Unit Price Amount Page 3 of 3 Contract Time Adjustment Da -30 $90.00 -$2,700.00 7 $145.00 $1,015.00 35 $11.00 $385.00 237 $14.00 $3,318.00 66 $22.00 $1,452.00 1 $785.00 $785.00 - 18 $6.00 -$108.00 -18 $7.50 -$135.00 -18 $3.00 -$54.00 -18 $5.00 -$90.00 -117 $1.00 -$117.00 10 $2.00 $20.00 - 51 $5.00 -$255.00 348 $5.00 $1,740.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 TOTALS: $0.00 $5,256.00