Loading...
CM-12-02-032ROUND RO TES FUME AMON PROSPERITY Consider executing Quantity Adjustment/Change Order No. 2 with Stewart Builders, Inc. for the City Hall Item Caption: Remodel Project. Approval Date: February 17, 2012 jh-.IZ-oZ--'o32. RECEIVED FEB City Manager Approval Form 111 ' Department Name: General Services Project Manager: Larry Madsen Assigned Attorney: Steve Sheets Item Summary: This change order reflects changes to the third floor, hardware, mechanical room, and Council Chambers. No. of Originals Submitted: 2 Project Name: City Hall Remodel Cost: $15,336.00 Source of Funds: 2002 General Obligation Bonds Source of Funds (if applicable): General Self -Financed Construction Account Number: Finance Director Approval: Cheryl Delaney Date: 2/15/12 Department Director Approval: Chad McDowell Date: 02/13/2012 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP ❑ El Budget N/A OK CI ❑ N/A OK Purchasing ❑ N/A OK Accounting ❑ ❑� N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Contract Quantity Adjustment/Change Order ROUND mxiiC, nmm rev, 06/11 Department: General Services Project Name: City Hall Remodel City Project ID Number AA3OCHALL Justification Date: Page 1 of 3 2/17/2012 Change Order/Quantity Adjustment No. 2 This change order reflects changes to the third floor, hardware, mechanical room,and Council Chambers. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: 4A7 Signature Print- , Cont.raCompany Nam For Contractor: For City of Round Rock: Signature NW- Amount $2,556,000.00 $0.00 $0.00 $0.00 $2,556,000.00 $20,295.00 $15,336.00 $35,631.00 0/0 Change 0.01 0.01 0.01 $2,591,631.00 $35,631.00 Calendar Days Calendar Days 0 Calendar Days 0 Calendar Days Larry Madsen - Construction Manager Printed Name, Title Date John Miles - Pro'ect Mana . er Printed Name, Title Z— Steve Norwood - City Manager PrintedName, Title Date ROUND ROOC, TEXAS rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel Quan. Adj./Change Order No.: 2 Page 2 of 3 Item # 1_penetration cnan Item Descri ion u ura ee suppo at 3rd floor mechanical chase Unit e tuner vasa 1 Unit Price $2,478.00 Amount $2,478.00 .n• - Time Adjustment (Days) 0 2 12 #35 Door A 310 Change door trom reception area 3rd floor to administration offices upgrade wood door with glass panel 1 $1,752.00 $1,752.00 0 3 CP# 36 Card reader adjustment for A 102 & A 1016 1 $1,468.00 $1,468.00 0 4 CP # 37 Furrdown at Council Chambers entry to cover plumbing lines and other items at entry 1 $7,335.00 $7,335.00 0 5 CP # 40 Add additional conduits under walkway bridge for IT 1 $2,303.00 $2,303.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 TOTALS: $15,336.00 0 ROUND ROCK TEXAS 4 AMOK •IC rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel Quan. Adj./Change Order No.: 2 uantity Adiustm Page 3 of 3 Bid Item # Item Descri • ron Unit •y . Unit Price Amount $0.00 on• . Time Adjustment Da s) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 Stewart Builders, Inc. General Contractor • Construction Managers To: Lacey Lewis, KA Hickman Architects COST PROPOSAL #33 Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, D( 78664 Plans Dated: 4-15-2011 Date: 1/26/2012 Description: Per RFP #33, attached Add structural steel supports to 3rd floor at mechanical chase. Opening not indicated as new on structural plans. Total This Cost Proposal 2,478 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects City of Round Rock 0 OWNER: John days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock S' 0 COST PROPOSAL DETAIL DESCRIPTION QTY UNIT UC LAB LABOR UC MAT. MAT SUB SUB SUB COSTS COSTS COST COSTS Steel Beams 1 LS $0 $800.00 $800 $0 $800 Install Steel 1 LS $1,436.00 $1,436 $0 $0 $1,436 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SUBTOTALS $1,436 $800.00 $0.00 $2,236 SUBTOTAL SUBCONTRACTORS MARKUP CONTINGENCY $2,236 GC OH & PROFIT 10% on $ 2,236 $224 7.5% on $ $0 5.0% on $ - $0 TOTAL OH & P BONDS 0.75% on $2,460 $224 $2,460 TOTAL CHANGE ORDER $2,478 From: Mark Bryant To: "John Miles" Subject: FW: server room A/C duct penetrations Date: Thursday, January 05, 2012 2:42:08 PM From: Sherry) Kruse[mailto:sherryl@designwelding.com] Sent: Thursday, January 05, 2012 1:29 PM To: 'Mark Bryant' Subject: RE: server room A/C duct penetrations Labor, material and deliver to site: 2 each 8 x 10 beams appx 10'-0 2 each 8 x 10 beams appx 5'-9 1 each L 3 x 3 x 1/4" apex 5'-9 $800.00' Y", Sherry( Kruse Design 'Welding & Fabrication 1NBE/DBE Certified 3300 FM 166o 3lutto , ?X78634 512-759-1452 like snowflakes, every child is unique... and beautiful. From: Mark Bryant[mailto:markbryant@stewartbuildersltd.com] Sent: Thursday, January 05, 2012 11:13 AM To: 'Sherry) Kruse'; 'John Miles' Subject: server room A/C duct penetrations Sherry), If you have any questions let me know. Mark Bryant Stewart Builders 512-801-1503 Perry Perry Builders, Inc. PO BX 1048 Rockdale, TX 76567 TO: CHANGE ORDER COST ANALYSIS ATTN: Project: A. Total Price this work order (as shown in Item 17) B. Time increase for this work order C. Description of the Work in This Work Order. Date: Change Order Proposal: 0 Calendar Days D. Cost Summary 1.0 Total Labor Cost -From Labor Cost Summary Sheet(s) 2.0 Total Material Cost -From Material Summary Sheet 3.0 Total Equipment Cost -From Equipment Summary Sheet 4.0 Subcontractors Cost -From Subcontractor Summary Sheet 5.0 As -Built and Submittal Cost Impact 6.0 Other Miscellaneous Cost: a. Travel & Subsistance of Contractor and Administrative Employees attributable to this Change Order b. Long Distance Calls, Telegrams, Etc. c. Blueprinting, Reproduction d. Cleaning & Debris Removal e. Finance Cost (If Pertinent) f. Extended Site Overhead Cost g. Licenses and Permits 7.0 Subtotal Items 1 thru 6 8.0 Warranty work allowance (0.005 x Item 7) 9.0 Subtotal Item 7 plus Item 8 10.0 OVERHEAD 11.0 Subtotal Item 9 plus Item 10 12.0 PROFIT 13.0 Subtotal Item 11 plus Item 12 14.0 BOND @. n 15.0 Subtotal Item 13 plus Item 14 16.0 INSURANCE 15 17.0 TOTAL PRICE THIS WORK ORDER Item 15 plus Item 16 ACCEPTED BY NAME & TITLE DATE 512-446-2752 office 512-446-2564 fax t REQUEST FOR PROPOSAL >in PROJECT: City Hall Remodel PROPOSAL REQUEST #: 33 OWNER: City of Round Rock DATE OF ISSUANCE: December 27, 2011 TO: Stewart Builders, Inc. ARCHITECT: KAHickman Architects CONTRACT FOR: Renovations PROJECT #: KAH-1006 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: Third floor framing plan. Please provide pricing per the attached detail from Datum Engineers. Attachments: One page from Datum. Lacey Lewis KAHickman Architects Stewart Builders, Inc. A signed copy of the RFP must be submitted to the Architect & Owner within (5) five working days of issuance. Costing information must be provided with labor & material breakdowns from all suppliers or the pricing will not be considered. Architect Contact: KAHickman Architects, Attn: Lacey Lewis - lacey@kaharchitects.com City of Round Rock RFP City Hall Remodel December 27, 2011 RFP - STRUCTURAL DRAWINGS 1. Sheet S2.4 Third Floor Framing Plan a. Since existing mechanical chase and floor opening does not exists as indicated on the existing drawings, install small beams (W8x10) on all 4 sides of 2 new mechanical openings at grid 2 to 3, and G to H, similar to support for other new floor openings, per details 2 and 4 on S4.1. Install L3x3x1/4 between openings to support remaining sliver of concrete since this concrete must stay for fireproofing reasons. ***ENDOFRFP*** �s�� E. U..'-rti-�-�tt s *J i\ i*»....» _ icy GAIEN G. SCHROEDER 4 VA: z 44999 It % /C 5E52' ..4v c..447.11, A_ e e. Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #35 Contractor: Project: Stewart Builders, Inc. City of Round Rock - City Hall Remodel 35 County Road 150 231 East Main St. Georgetown, Texas 78626 Round Rock, TX 78664 X11015 Plans Dated: 4-15-2011 To: Lacey Lewis, KA Hickman Architects Date: 1/26/2012 Description: Per RFP #23R, attached Change door A310 from glass door type E, to wood door type G with painted, HM frame. 'Door hardware per Jody Boatman's comments dated 11-28-11. Total This Cost Proposal $ 1,752 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects City of Round Rock 0 OWNER: acarbnwsase...t John days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock COST PROPOSAL DETAIL # 3' DESCRIPTION QTY UNIT UC LAB LABOR UC MAT. MAT SUB SUB SUB COSTS COSTS COST COSTS Doors & Hardware 1 LS $0 $1,835.00 $1,835 $0 $1,835 Glass/Glass Door 1 LS $0 -$825.00 -$825 $0 -$825 Paint 1 LS $0 $80.00 $80 $0 $80 Install Doors/Frames 1 LS $491 $491 $0 $0 $491 so so so so $0 $0 $0 $0 $0 $0 $0 $0 so $0 $0 $0 so $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 so $0 $0 $0 SUBTOTALS $491 51,090.00 $0.00 51,581 SUBTOTAL SUBCONTRACTORS $1,581 MARKUP CONTINGENCY GC OH & PROFIT 10% on $ 1,581 $158 7.5% on $ $0 5.0% on $ $0 TOTAL OH & P $158 $1,739 BONDS 0.75% on $1,739 $13 TOTAL CHANGE ORDER $1,752 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #36 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 1/26/2012 Description: Per RFP #31, attached Remove cans reader from door A102 and install at door A101 B, on south side of the door. Add card reader to north side of door A101 B. Door A101 B to have 2 card readers. Modify door hardware for A101 B. See RFP #31 for details. 1 data drop per electrical subcontractor. Per spec 26 05 80-2, induded. 15 of 18 data drops used as of this proposal. 3 remaining. Total This Cost Proposal 1,468 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects owlehnJohn Miles'"""...: «._..,.. filcalsallS Dot 101201.76 1(0627-06110 John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock COST PROPOSAL DETAIL DESCRIPTION QTY UNIT UC LAB LABOR UC MAT. MAT SUB SUB SUB COSTS ..._._.......».._...._...................COSTS.._................................................. ..._..._............._.._.. COST COSTS Hardware 1 LS $0 $1,325.00 $1,325 $0 $1,325 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 so..._......._...».._..._............_..._............_......._........_......._................._......_..$�..._..........._... so o....... $ ..._..........._......._...............�o....................................................._....... o........_..._..._.soo so $0 $0 $0 $0 $0.....so so .........................._............_.._...._........_......._..._.._......................._.........._................._ $0 $0 $0 $0 $0 $0 $0$0 $0 OTA SUBTLS ,.._..._.OTA» _..._ _..... _. _.._...». $0 $1,32500 50.00 $1,325 ----------- - SUBTOTAL SUBCONTRACTORS MARKUP CONTINGENCY GC OH & PROFIT 10% on $ 1,325 $133 7.5% on $ $0 5.0% on $ $0 TOTAL OH & P $133 $1,458 BONDS 0.75% on $1,458 $11 TOTAL CHANGE ORDER $1,468 AACHIJECJOAAI.p :�OIUISIOHU formerly Hutchison Supply Co. 2425 Brockton #103 San Antonio, TX 78217 Phone: (210) 8264616 Fax: (210) 8264900 DOORS • AUTOMATIC DOORS • FRAMES • HARDWARE SALES • REPAIRS • INSTALLATION Date: Customer: Project Name: Location: 01-18-12 Stewart Builders City of Round Rock City Hall Round Rock, TX Change Order #: Architectural AIA #: PR -31 Revised Architectural Division 8 proposes to furnish the above listed party (Hereinafter called "Contractor) the following materials and / or labor for the above listed structure for their consideration. MATERIALS FURNISHED PR -31R Includes: A102 — Install specified electric strike — do not hook up — no change in scope A101B — New Hardware - Hinges, Electric Strike, Storeroom Lock, Closer, Kickplate, Door Position Switch, Door Management Unit (ES4200 — Base Model Only) Price Breakout: Hinges $15 Electric Strike $350 Lock $225 Closer $115 Kickplate $30 DPS $40 Door Mgmt Un $540 $1,325.00 TOTAL $1,325.00 Shipping: FOB (Austin, TX) Terms: Net 30 days, QUOTE VOID AFTER 30 DAYS Taxes: Sales tax, unless noted otherwise is not included in this proposal. The amount of any applicable sales, use or comparable tax on receipts that Architectural Division 8 may be required to collect will be added to each invoice. Respectfully Submitted, Justin Nelson Project Manager oti • • 0 LJ z 1 1 !3,0 < 7 1=0 U uJ L L iIJJ '0 c.) 2 C5 1 Ezz- 0 4Z r 1 1 1 0 =NI 'OM IMO OISE MO MO Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #37 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 1/26/2012 Description: Per RFP #37, attached Install furdown in A101 at exposed waste plumbing lines, remove water line for hose bib, relocate remaining waterline tight to ceiling, install furdown at doors A101A in A101, relocate HVAC transfer grills to face of new furdown, change lighting at furdown location (ASI #14) Change light fortunes at passage A204 per ASI #14 Total This Cost Proposal 7,335 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects 0191d1+4.dpkrnMe. utakkinl.eee-Start John Miles''°°•`.n... Dire 3012.01/616104S John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock COST PROPOSAL DETAIL *r - DESCRIPTION Q Y UNIT UC LAB LABOR UC MAT. .�, ....._................... ._ ...,.,._... ......_..... ._..,_......... MAT .............. SUB SUB SUB COSTS COSTS COST COSTS Framin9/Drywall 1 LS $1,555.00 $1,555 $850.00 $850 $424.00 $424 $2,829 Plumbing 1 LS $1,575.00 $1,575 $0 $0 $1,575 Paint 1 LS $670.00 $670 $0 Electrical_................_............_.._......._.._..._�70 1 LS $111.38 $111 $1,058.00 $1,058 $175.41 $175 $1,345 Stewart Builders 1 LS $200.00 $200 $0 $0 $200 so so $0 ............._...............,._.........N............................................._ . ..............; .. $0 $0 $0 $0 $0 $0 $0 $0 $0 SUBTOTALS SUBTOTAL SUBCONTRACTORS MARKUP CONTINGENCY $0 $0 $0 $0 $0 50 $0 $0 54,111 51,908.00 5599.41 $6,619 $6,619 GC OH & PROFIT 10% on $ 6,619 $662 7.5% on $ $0 5.0% on $ $0 TOTAL OH & P $662 $7,281 BONDS 0.75% on $7,281 $55 TOTAL CHANGE ORDER $7,335 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #40 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 1/26/2012 Description: Per RFP #38, attached Provide (2) additional 2" rigid data conduits under walkway bridge as requested by CORR. Total This Cost Proposal 2,303 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects Obiati9p"agb,n110. ata benrsesr"., John Miles"t°•� John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock COST PROPOSAL DETAIL DESCRIPTION QTY UNIT UC LAB LABOR UC MAT. MAT SUB ..........._.... ......_. .................. .._......._..._.... SUB SUB COSTS COSTS COST ..._..........COSTS._.. Electrical 1 LS $1,347.50 $1,348 $459.37 $459 $271.03 $271 $2,078 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $o so $o so so so so so o.._.._......_.._ ....................... �............ _..............._..._..._..� .._ o..._.......�..._... so so $O $0 _$o $o $o $o $o so..............................._......._............so._..._............_............................._.._..._..$9................._...� so $0 so $o $o 0 $o $0 SUBTOTALS $1,348 $459.37 5271.03 $2,078 SUBTOTAL SUBCONTRACTORS MARKUP CONTINGENCY $2,078 GC OH & PROFIT 10% on $ 2,078 $208 7.5% on $ $0 5.0% on $ $0 TOTAL OH & P $208 $2,286 BONDS 0.75% on $2,286 $17 TOTAL CHANGE ORDER $2,303 AIL 3280 FM 112 TAVLOR, TX 76574 OFFICE (512) 365-8393 FAx (512) 365-3989 TDLR LICENSE /19676 ROUND ROCK CITY HALL C.O. # 04 R1 RFP #3 8 DATA RUN BETWEEN BLDGS DATE: 11/30/201: NAME: JOHN MILES COMPANY: STEWART BUILDERS FAX 512-931-2346 RUN CONDUIT FOR DATA BETWEEN BLDGS CONDUIT / FITTINGS / MISC. HARDWARE / CORES DESTINATION BXS BY OTHERS MATERIAL (SEE ATTACHED SHEET) $459.37 TAX $0.00 MATERIAL TOTAL $459.37 LABOR 21.87 INSTALLER HOURS AT $35.00 /HOUR $765.45 3.64 JOURNEYMAN HOURS AT $55.00 /HOUR $200.20 0.50 PROJECT MGR. HOURS AT $65.00 /HOUR $32.50 SUBTOTAL LABOR $998.15 PAYROLL TAXES @ 35% $349.35 LABOR TOTAL $1,347.50 MISCELLANEOUS EXPENSES EQUIPMENT RENTAL PERMITS FREIGHT MISCELLANEOUS TOTAL $0.00 $0.00 $0.00 MATERIAL $459.37 MISCELLANEOUS $0.00 LABOR $1,347.50 SUBTOTAL $1,806.87 OVERHEAD & PROFIT (15%) $271.03 TOTAL 62,077.90 ROUND ROCK CITY HALL C 0 #4 P2 R1 TOTAL UNIT TOTAL UNIT QUANTITY UNIT COST UNIT COST LABOR LABOR STRUT / KINDORF 20 1.42 28.40 0.02 0.40 21/2 BUSHING 2 0.78 1.56 0.09 0.18 2 1/2 SCREW ON BUSH 2 0.98 1.96 0.09 0.18 2 1/2 EMT SS CONN STL 2 6.00 12.00 0.14 0.28 2 1/2 STRUT / KINDORF STRAP 20 0.92 18.40 0.14 2.80 2 1/2 EMT CONDUIT 80 3.00 240.00 0.11 8.80 2 1/2 EMT SS COUP STL 8 5.60 44.80 0.16 1.28 3/8X1 WASHER 50 0.03 1.50 0.07 3.50 3/8 HEX NUT 25 0.05 1.25 0.07 1.75 3/8 ALLTHREAD ROD 20 0.28 5.60 0.02 0.40 BC BEAM CLAMP 3/8" 10 0.39 3.90 0.03 0.30 CORE 2 50.00 100.00 1.00 2.00 RAW TOTALS 459.37 21.87 Larry Madsen From: Chris Lewis <chris@kaharchitects.com> Sent Wednesday, January 25, 2012 12:48 PM To: John Miles Cc Larry Madsen; Mark Bryant; Kim Alien Subject Re: PR40 labor John, Thank you for following up with this. PR40 is justifiable per ACM's response. Thanks, CRL Chris Lewis Construction Administrator KAH Architects and Interior Designers Sent from my iPhone On Jan 25, 2012, at 12:44 PM, "John Miles" <johnmiles@stewartbuildersltd.com> wrote: > Chris, > > Please see the email below from ACM regarding the labor costs > associate with RFP #38 (cost proposal #40). Thank you. > > > > John Miles > Stewart Builders, Inc. > > Off: 512.763.8900 > Fax: 512.931.2346 > Cell: 512.818.2330 > johnmiles@stewartbuildersltd.com > > 35 CR 150 > Georgetown, TX 78626 > > > -----Original Message > From: acm_nick@sbcglobal.net [mailto:acm_nick@sbcglobal.net] > Sent: Wednesday, January 25, 2012 11:46 AM > To: johnmiles@stewartbuildersltd.com > Cc: dean ulve > Subject: PR40 labor > >John > In response to the architects comment about labor i offer the > following explanation. > Because the conduit is a 2-1/2 conduit the labor units associated are > higher than you will see on smaller conduit. > To make a simple bend on 2-1/2" takes a considerable amount of set up > and labor. If the architect were to look at the particulars of the > install they would see that we have to snake this 2-1/2" conduit in, > under and around I-beams. Make the penetrations in the concrete,etc If > you look at the labor breakout it was one person doing the majority of > the work with only a few hours if supervision. > This was not a time and material proposal request therefore when > working these estimates up we have to anticipate and cover all of the > facets of installing this pipe > If you need any further explanation feel free to call me. > Have a great day > Sent from my iPhone=