CM-12-03-053VMS City Manager Approval Form Item Caption: RECEIVED NAR 22 2012 Consider a resolution authorizing the Mayor to execute Supplemental Agreement #1 for Professional Services Contract with Atkins for the 2011 Wastewater Master Plan Update. Approval Date: March 23, 2012 Department Name: Utilities and Environmental Services Department Project Manager: Eddie Zapata Assigned Attorney: Steve Sheets Item Summary: The City updates the Wastewater Capital Recovery (Impact) Fee every three years. In order to complete the upcoming 2011 Wastewater Capital Recovery (Impact) Fee Study, an update of the 2008 Wastewater Collection System Master Plan was necessary. Updating the Wastewater Master Plan allowed us to revise or confirm the schedule and budget of each project in our current Utility Capital Improvements Program in order to meet the future demands of our wastewater system. The City contracted with Atkins to update the Wastewater Master Plan which included evaluating current and future wastewater demands, comparing future demands to system capacities, verifying and updating our current wastewater collection system computer model, and assisting in determining an appropriate wastewater impact fee. Supplemental Agreement No. 1 is necessary in order for Atkins to perform additional wastewater modeling services for the City along Lake Creek (Segments 2 and 3), McNutt Creek Basin near the Round Rock/ Georgetown ETJ boundary, Georgetown - Southeast Development Zone near Barton Hill/ Westinghouse Road, Old Settlers, and development near Sunrise Road. No. of Originals Submitted: 2 Project Name: 2011 Wastewater Master Plan Cost: $11, 927 Source of Funds: Self -Financed Wastewater Construction Source of Funds (if applicable): Select Source Fund Account Number: ww00updtll Finance Director Approval: Cheryl Delaney Date: 3/21/12 Department Director Approval: Michael Thane Date: 3/19/2012 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP111 EI Budget n n Purchasing EI Accounting LI N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Y STATE OF TEXAS COUNTY OF WILLIAMSON § § § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS ("Engineer") ADDRESS: 6504 Bridge Point Parkway, Suite 200, Austin, TX 78730 PROJECT: 2011 Wastewater Master Plan Update This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins, (Formerly PBS&J, an Atkins Company), hereinafter called the `Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of February, 2011 for the 2011 Wastewater Master Plan Update Project in the amount of $146,509.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,927.00 to a total of $158,436.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $11,927.00 the lump sum amount payable under the Contract for a total of $158,436.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.7159; 00245204 84275 WWOOupdt11 1 cj1-13 -O5, ATKINS By: Date CITY I + ND ROCK By: 5t e4 0 rove 1 d / G•fillM sotKy!.N �/z Date Supplemental Contract 0199.7159; 00245204 WW00updt11 2 APPROVED AS TO FORM: 1. Gitle M14+ Cit kftemeti Rev.12/01/08 84275 'r ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: Task 1— Project Management Provide general project management including project coordination. • Progress Meetings: Meet with the CORR one (1) time to review the results of the additional modeling services. The meeting is anticipated to last up to two (2) hours each. • Quality Assurance/Quality Control: Provide quality assurance and control over deliverables by performing review of modeling results. Task 2 — Additional Modeling At the request of City of Round Rock Staff, Atkins will perform the following additional modeling services: • Lake Creek (Segments 2 and 3) • Georgetown — McNutt Georgetown Zone • Georgetown — Southeast Development Zone • Old Settlers • Development near Sunrise • 0 0 0 00 • ri r'1 t- r- O O) pp to, oe $ v N O O 0 EA EA Ee O o ociEA EA tA V 0 L. v J 0 0 0 N• cnoi _ a o g ED co rn F- 0)- '42 it �o u E v c a> co13 co O C 2 Tic toy a Q o N O 118 2o