Loading...
CM-12-03-056cm- 1-2,-6-090 RECEIVED NAR 2 910X1 ROUND ROCK, TEXAS City Manager Approval Form PURPOSE. MOOR PEKAPOUTY Consider executing Quantity Adjustment/Change Order No. 3 with Stewart Builders, Inc. for the City Hall Remodel Project. Item Caption: Approval Date: March 30, 2012 Department Name: General Services Project Manager: Larry Madsen Assigned Attorney: Steve Sheets Item Summary: Adjustments and unforeseen circumstances not covered on original plans to various items of construction of the remodel project. No. of Originals Submitted: 2 Project Name: City Hall Remodel Cost: $31,387.00 Source of Funds: 2002 General Obligation Bonds Source of Funds (if applicable): General Self -Financed Construction Account Number: Finance Director Approval: Cheryl Delaney Date: 3/27/12 Department Director Approval: Chad McDowell Date: 03/23/2012 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP El Budget El Li Purchasing 111 Accounting r N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 • 11:1-Ln2 rev, 06/11 Department: General Services Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel City Project ID Number AA3OCHALL Justification Date: Change Order/Quantity Adjustment No. Page 1 of 4 3/19/2012 3 Adjustments and unforeseen circumstances not covered on original plans to various items of construction of the remodel project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustments) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: For Contractor: For City of Round Rock: Printed Contra.; Company Name: Sig • Signature Amount $2,556,000.00 $0.00 $0.00 $0.00 $2,556,000.00 $35,631.00 $31,387.00 $67,018.00 % Change 0.01 0.01 0.03 $2,623,018.00 $67,018.00 Calendar Days Calendar Days 0 Calendar Days 0 Calendar Days Larry Madsen - Construction Manager Printed Name, Title Stewart Builders Inc. John Miles - Project Manager Printed Name, Title Steve Norwood - City Manager Printed Name, TitleDate 3.Zo Date m�i'�z Date a HOUND 1000( TOGS POP= MOM 1.111301../It rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel Quan. Adj./Change Order No.: 3 Page 2 of 4 Item # 1 cnan Item Descri on row or saein i billing as per utility billing requerst to build a concrete block pedestal to get safe off floor and to height for access Unit uraer uata 1 Unit Price $554.00 Amount $554.00 Ing - Time Adjustment Da s 0 2 Install rock around 2 concrete columns at walkway bridge in lieu of stucco 1 $10,498.00 $10,498.00 0 3 Furr out wall in mop sink in janitonal closet to allow new sink drains to line up, structural items did not allow drains to be moved 1 $1,619.00 $1,619.00 0 4 Install additional perforated floor panels to IT Server Room to allow for additional air flow. 1 $1,240.00 $1,240.00 0 5 rioarry countertops in council cnamoers for seating for City Secretary and Assistant City Managers to allow more seating space between counter and exterior walls 1 $1,278.00 $1,278.00 0 6 Additional Fire Extinguishers/cabinets installed per Fire Marshall's inspection per code 1 $3,639.00 $3,639.00 0 7 Fumish and install two new doors and hardware for Council Chambers and furnish and install new door at Utility Billing to match Council Chambers. 1 $9,610.00 $9,610.00 0 8 Add wall to City Manager and Assistant City Managers office. Add door with coat closet/shelf at City Managers 1 $2,949.00 $2,949.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contract Quantity Adjustment/Change Order ROUND ROCK, TEXAS rev, 06/11 Page 3 of 4 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $31,387.00 0 ROUND ROCK TEXAS 11.111•0•C MOON nosment rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel Quan. Adj./Change Order No.: 3 Page 4 of 4 Bid Item # uanu Item Descri . ' on AU Unit usunent uata 6,i5 . Unit Price Amount $0.00 .nI Time Adjustment (Da s $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #39 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 3/15/2012 Description: Per RFP #36, attached Provide safe support pedestal in Storage Room A115. Safe to be provided and installed by CORR. Total This Cost Proposal 554 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects 130l8010rK.deyd�,.1. SII w.Mw1M.u4KM John Miles°w-•....d.. da Dale au 201]-0 3.15113.7 YSV O John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #41 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 2/14/2012 Description: Per Request of City of Round Rock Install stone fagade around two (2) concrete bridge columns per the attached drawing. Each column to have one (1) inset stucco oval, 1 on north side of north coulumn and 1 on south side of south column. A rowiodk of 4" limestone to be installed as accent around column 1L0 cast stone shown. All downspounts to be run inside of stone and terminated at exterior with brass noes. Total This Cost Proposal 10,498 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects John Miles Diglr►4"+4siwr. Mo+tlwraaa... w.srr w John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #42 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 2/20/2012 Description: Per RFP #39, attached; Fur out the gyp wall in th Storage Rooms A121 & A225 to allow proper installation of specified mop sink. New mop sinks are smaller than orginal sinks that were demo'd. New mop sinks will have to move the drains in the floor. In room A121m there is a concrete beam where the drain needs to relocate to. In room A225, there is a stnictual steel beam. Furring out the wall will move the sinks over to allow for the existing drain location to be used. Total This Cost Proposal 1,619 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: Stewart Builders, Inc. John Miles' �. Wil» :,53,.N. 0 ARCHITECT: OWNER: KA Hidkman Architects City of Round Rock John Miles Keith Hickman Project Manager Architect days Larry Madsen Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #44 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 2/27/2012 Description: Per RFP #40, Attached: Supply and install 16 ventilated floor panels at raised floor in server room. 10 existing perforated floor panels to be replace with these panels and 6 solid floor panels to be replaced with new ventilated panels. Panels to be installed at the direction of the MEP engineer. Incudes credit for unused panels from CP/RFP #27. 6 panels @ $15 ea. ($90) Total This Cost Proposal 1,240 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: Stewart Builders, Inc. John MileOlt umiak* M. crikwt s. ilonikaUS Dam 3011011109tNiaM 0 ARCHITECT: OWNER: KA Hickman Architects City of Round Rock days John Miles Keith Hickman Project Manager Architect ary Madsen Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #45 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 2/24/2012 Description: Per RFP #41, Attached: Modify both countertops and 1 handrail, detail 6 on sheet A805, at Council Chamber. Total This Cost Proposal 1,278 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: Stewart Builders, Inc. John Miles 00•2012mx1men0,017 0 ARCHITECT: OWNER: KA Hickman Architects City of Round Rock John Miles Keith Hickman Project Manager Architect days Larry Madsen Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #46 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 3/15/2012 Description: Per RFP #46, Attached: Fumish and install 5 new fire extinguisher cabinets and 4 new fire extinguishers. Install 4 existing fire extinguisher cabinets and 5 5 existing fire extinguishers. Fire extinguisher in Server Room to be hung on bracket, no cabinet. Total This Cost Proposal 3,639 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects John Miles° �,. allS Drw2012.03.151}210707110 John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock 1 Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #48 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 3/15/2012 Description: Per RFP #42 and RFP #42R, Attached: Fumish and install doors and hardware for Council Chambers, A101A, and Utility Billing, A120A. New frames to be provided and installed. Total This Cost Proposal $ 9,610 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects John Miles r.:-•� d5 0.11.2012.03.13I15625 05 P John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #49.1 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 3/15/2012 Description: Per RFP #45, Attached: Add walls to angular comer of offices A301 and A304. Price below to include door/coat closet w/ shelf in A301. Total This Cost Proposal 2,949 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects 1300n14.d M0dnwn 01k aw.ldn 501wS o.snwnl John Miles klAran One 2012.03.151k1553 -051110 John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock