Loading...
R-2016-3212 - 2/11/2016RESOLUTION NO. R-2016-3212 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with K. Friese & Associates, Inc. for the Kenney Fort Boulevard Extension Project, and WHEREAS, K. Friese & Associates, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with K. Friese & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with K. Friese & Associates, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 11th day of February, 2016. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1604;00350924 EXHIBIT "A» STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: K FRIESE & ASSOCIATES, INC. ("Engineer") ADDRESS: 1120 S. Capital of Texas Hwy, Building 2, Suite 100, Austin, TX 78746 PROJECT: Kenney Fort Boulevard Extension This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and K Friese & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of April, 2015 for the Kenney Fort Boulevard Extension Project in the amount of $450,961.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $79,745.00 to a total of $530,706.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $79,745.00 the lump sum amount payable under the Contract for a total of $530,706.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.1511; 00350270 84275 K FRIESE & ASSOCIATES, INC. Date CITY OF ROUND ROCK Alan McGraw, Mayor Date Supplemental Contract 0199.1511; 00350270 APPROVED AS TO FORM: Stephan L. Sheets, City Attorney Rev. 12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services UNDERSTANDING K Friese & Associates, Inc. (KFA) will add the design of approximately 8,700 linear feet of 24 -inch water transmission main to be included in the PS&E package for the Kenney Fort Boulevard project. Our understanding of the project is based on an email transmission from Leah Collier on October 5, 2015 and a follow up meeting with Chris Perkins and Jeff Bell, and consists of the following assumptions: • Water main on a single pressure plane (no PRV's required) • 24 -inch diameter DI pipe will be used with AWWA C-900 included as a possible bid alternative • Water line will be capped at either end for future connections • Waterline will include several stub -outs (5 assumed for this proposal) Additionally, KFA assumes: • The waterline will cross Chandler Creek underground and will not be suspended from the bridge • The waterline will be located within separate easements outside the Kenney Fort Right -of -Way. Ten (10) easement parcels have been assumed for this project. SCOPE OF SERVICES �11II��uI_l►T_[ _ ►e1 "J Wkr1 1. Project Meetings — KFA will attend two (2) design review meetings with the CORR Department of Utilities to review the plans and design. TASK 2 — FINAL DESIGN 1. Construction Plans — KFA will produce the following sheets (11" x 17" Full -Size) as appropriate for the revised roadway design. QA/QC is included in each sheet task. a. WATERLINE QUANTITY SUMMARY SHEET (1 Sheet) b. WATERLINE NOTES (1 Sheet) c. WATERLINE PLAN AND PROFILE SHEETS (20 Sheets) d. WATERLINE DETAIL SHEETS (5 Sheets) 2. Opinion of Probable Construction Cost — KFA will prepare and submit an engineer's opinion of probable construction cost in Microsoft Excel format at each submittal to the City. 3. Waterline Easements — Inland Geodetics will recover, verify, and utilize established control from work performed previously and will prepare up to ten B-1 of 2 ADDENDUM TO EXHIBIT B Engineering Services (10) individual easement acquisition packages consisting of a metes and bounds description and survey plat. 4. Contract Documents — KFA will prepare a set of construction contract documents in accordance with City of Round Rock Standards including: a. Technical Specifications and Provisions 1. City of Round Rock Standard Specifications 2. Special Technical Specifications 3. Special Provisions 5. Bid & Award — KFA will assist the City of Round Rock with contract administration during the bid phase of the project. a. Addenda Preparation — KFA will interpret plans and specifications and draft addenda, as necessary, for issuance. One (1) addendum has been assumed for budgeting purposes. b. Conforming Documents — Addenda items will be incorporated into a set of "conformed" documents. We have included reproduction of 8 sets of conformed documents to be issued for construction (4 to City; 4 to Contractor). TASK 3 — CONSTRUCTION PHASE Construction Phase Services — KFA will assist the City of Round Rock with contract administration during the construction phase of the project. We understand the City of Round Rock will provide required construction inspection services, and have assumed that the construction duration will be approximately 12 months. KFA's services will include: a. Submittal Review — KFA will maintain a log of all Contractor submittals, track review progress, review and approve submittals, and distribute submittals to the appropriate parties. b. Requests for Information (RFIs) — KFA will provide answers to requests for information (RFI's) from Contractor as related to possible conflicts and clarifications needed between plans and specifications. Two (2) RFI's have been assumed. c. Record Drawings. KFA will use the Contractor's redline as -built drawings to document as -built conditions in the final record drawings. KFA will supply the City of Round Rock with one set of reproducible record drawings and provide one set of record drawings in .pdf format. ASSUMPTIONS 1. No aerial (bridge) crossing of the water line will be required. 2. Easement title commitments will be provided by the City. B-2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 13 75I �i — 0 73 c ri co 0 A.L. y1 C t aj ca p0 0 0 m 2 cvuLL O al 75 t cL cu 0 aj E E m Di 0 o -E E E z. Ln Lo m m O v Cf :31 < X 751 W cl -2 co CO X LD 1-4 �o 1-1 kD 14 �o LO tD Lo tw W Lni oo 'D 14 In 1-4 o rn tD 1-4 coLo 1-4 -- Ln -- (n 11 -- Ln 11 H I -i -i r, 0 c"N -- -4 -- -j C14 f4 lD 0 -;r r14 -i m Ln r4 I- a) LL oo oo en (n r -I N H r4 r4 -Ir Ln In Ln LD oo N oo a) H -E c o -a 4v (D a) c o r -I r rIj r c 0 c 0 0 c 0 a) ej a) aj -o al -o (u oo c: o V m E LL LL- w E Ln I -f w u:) W Lo ko tD F - Lo Ln Ln In In In IH r -IW -4 ti r -I W c m H �q H 1-1I (n -- r -I Ln r -I kD r -I -- rIj Lo r- r-4 r -I 14 Ln r-4 r -I N Ln N oo r- r, r, N c r4 m ;t -td* 4 -a 'D Ln Ln 'a LD -o tD CO oo C C E S D = —4 F7: 0 m a :3 _c =3 = =3 _c:E 0 0 0 2 a) :3 a) F- (v cu :3 Qj (1) w W :3 =5 0 o m (a co cu m 0 'a U) 'a 'o 'D cu (u >. re co co 'a >. Ln 0) Lo ZT o 0 0 o 0 0 0 'a o C) C) W in N r -i T LD r -i r -I 11 m eq -1 li 11 to -i LD N C) oC E E E 0 aj c =3 V) c 0E -o w (u 14 -Lu E a) -Io E E E E tan L'n E a) as ai E :ul .0 — m Lao C o Tl 0 u -a C o 0 u c .2 m M m r- 0 Qj > m c - 10 m cL r - 0 r. 0 . rl (v cL 76 > cL W w (L u '2 m -cc al Za u pCE():�OE=C—_ U u ;Ll a) 0 E E .SE t ccu Ln _g_- c: c-_ i265:Li2 -D ::-c -a = �111<u =3 �,rt 0 2 lo L a) 11 v) u o- v) u t (u Z o R R .11 " . -, 0 o o u -Z -'d N = 0 c Lu w p aj (v U p c) In 0 In o Ln o Ln o 0) o cy) o (n 0 o) 0 H o rl o rl Fn C 0 m cu 0 U C', Ln �l M '�D �l o) p W J Q m Z = U W x(A 0 W W LU Q LL I M M o<oMMrocom n w co r ��.. ry C] M fA (h N C O tfj N tO m M r t•1 I� N O M O O N D N N N Y> r O O fA M fA fA V (9 � f9 f9 f9 r� f9 f9 1A co w o 0 0 0 �o c w S. v W o an �o o io. NN U fA M V! 0 U: C rr M M coMMrooco r N O M N FA r r O N N N co u] r M O) O C7 eh M N N O (O M r N �-• O Ol NM M N ON J_ b3 fA fA 7 bN9 f9 f9 E9 N co t F_ M W N O O 0 0 fro N N N. w m 0 O O O O m ' o DA m D - U c o vmw vw ww vN N`pp� , V 0 m (= C x O tD OJ v (OD co V co co 61 O O 60 o m ' M d>. _a G <O tD N N N N N C". tn: c = LI N � N W 3 O O O O 64 N C.o O O O O LILL m C N Q] O O O a a n � a � � h N N C _ ~ W o v � = W W � U 2 y r U J o U N o u g ai a 2 O O U) N w F -w QJU yi c m z a 0 - ❑ a a 0 °1 � n� o � � 6_ 'SCD 0ZZzzCLw o� do .uDw2 " voi ' `���of C S �Qv E N-- "v 6 0 A y W W W W 0 O C j a 0 LL O Q Q Q Q 'Q' 003 O O U, N d may' NU����0 y r7Ud'n' U C'" ^ F �—- f" I