CM-12-04-080ROUND ROCK, TEXAS Item Caption: CM1OOIR€CEIVEO2.-04i-080 APR 2 5 2012 City Manager Approval Form Consider executing Quantity Adjustment/Change Order No. 4 with Stewart Builders, Inc. for the City Hall Remodel Project. Approval Date: April 27, 2012 Department Name: General Services Project Manager: Larry Madsen Assigned Attorney: Steve Sheets Item Summary: Upgrades, changes, adjustments, and unforeseen circumstances not covered on original plans to various items of construction of the remodel project. No. of Originals Submitted: 2 Project Name: City Hall Remodel Cost: $18,645.00 Source of Funds: 2002 General Obligation Bonds Source of Funds (if applicable): General Self -Financed Construction Account Number: Finance Director Approval: Cheryl Delaney Date: 4/24/12 Department Director Approval: Chad McDowell CIP LI N/A Date: 04/19/2012 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** OK Budget Z Purchasing Accounting ❑ N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 .....1t51111. ROUND ROM TEXAS rev, 06/11 Department: General Services Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel City Project • ID Number AA3OCHALL 3ustification Date: Page 1 of 4 16 -Apr -12 Change Order/Quantity Adjustment No. 4 Upgrades, changes, adjustments and unforeseen circumstances not covered on orginal plans to various items of construction of the remodel project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Signature For Contractor: For City of Round Rock: Printed Contr• or Company Name: I / -101/07-V .tu a a re Amount $2,556,000.00 $0.00 $0.00 $0.00 $2,556,000.00 $67,018.00 $18,645.00 $85,663.00 $2,641,663.00 $85,663.00 Calendar Days % Change 0.03 0.01 0.03 Calendar Days 0 Calendar Days 0 Calendar Days Larry Madsen - Construction Manager Printed Name, Title Stewart Builders, Inc. ohn Miles - Pro'ect Manager Date 7 _ Printed Name, Title Steve Norwood - City Manager 2- Printed Name, Title Date .....r1/1/#.. -- ROUND ROCK TOGAS rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel Quan. Adj./Change Order No.: 4 Page 2 of 4 Item # 1 cnan Item Descri 'on . - ep ace existing oor hardware with new ADA required handles and electrical requirements for electric strikes for three doors. • Unit e vraer Data 1 Unit Price $2,305.00 Amount $2,305.00 •n'a Time Adjustment (Days) 0 2 CP# 50 - Additional floor prep due to damaged floor at 1st Floor concrete 1 $3,707.00 $3,707.00 0 3 CP# 52 - Relocate thermostat & light switch in Conference Room A#309 to move Smart Board installation 1 $256.00 $256.00 0 4 (.P# 53 - Supply two new doors at Lobby Alii & A113 on 1st floor to match new doors at Council Chambers and Utility Billing 1 $1,053.00 $1,053.00 0 5 CP# 54 - Addition of on auditorium chair at Council Chambers due to revised layout 1 $781.00 $781.00 0 6 LI -lie 55 - upgrade for window Duns to Mecho Shades for Council Chambers, 3rd Floor Reception, Executive Conference Room, City Manager's Office, and Mayor's Office 1 $5,375.00 $5,375.00 0 7 CP# 56 - Add 4 additional ceiling fixture lights at 3rd Floor Administration Reception area 1 $2,518.00 $2,518.00 0 8 CP# 57 - Additional conduit required at Parking Garage for security camera 1 $1,500.00 $1,500.00 0 9 CP# 58 - Add two fire sprinkler heads and a fire alarm relay to turn off AV system 1 $1,150.00 $1,150.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 POIR 6.---4D ROO( TOMS rev, 06/11 Contract Quantity Adjustment/Change Order Page 3 of 4 $0.00 $0.00 $0.00 $0.00 TOTALS: $18,645.00 0 r".."'. - ROUND ROCK, TEXAS MOIL 141610ft 1141102•191.1N rev, 06/11 Contract Quantity Adjustment/Change Order Project Name: City Hall Remodel Quan. Adj./Change Order No.: 4 ntity A Page 4 of 4 Bid Item # Item Descri . tion Unit • . Unit Price Amount $0.00 Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 Stewart Builders, Inc. General Contractor • Construction Managers Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects COST PROPOSAL #38.1 Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 1/26/2012 Description: Per RFP #35, attached Revised door hardware throughout Modify doors A101A. Labor for hardware and electrical required. Total This Cost Proposal 2,305 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects City of Round Rock 0 OWNER: upeyprepidwr. oita..bnr�aawa�. John Miles ,—...�..._ DOc201301.3616,17:111-0100 John Miles Project Manager days Keith Hickman Larry Madsen Architect Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #50 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 3/19/2012 Description: Additional floor prep required for tile flooring at restrooms and 1st floor. Previous existing tile/grout would not come up and damaged concrete surface when removed. Floor had to be chipped excessively to remove grout and patch holes in floor where damaged. Bathroom floor floated due to moving of floor drains. Total This Cost Proposal 3,707 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects ay,ya.eWith" Va. acasnnMks. e.5..., John Miles 01.t1e12.03.19113071dSVC John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #52 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 4/2/2012 Description: Per RFP #43, Attached: Relocate T -stat and Tight switch on south wall due to white -board. Total This Cost Proposal 256 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects John MilescomoNUS ....` Ons2012111112 WNW OM John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor - Construction Managers COST PROPOSAL #53 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 4/2/2012 Description: Suppply new wood doors for openings A111 and A113. Plans call for plam doors in Williamsburg Cherry. Per CORR, doors need to match existing wood, Honey oak style/color doors in 1st floor lobby. Doors to be re -ordered. Total This Cost Proposal 1,053 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: Stewart Builders, Inc. 0 ARCHITECT: OWNER: KA Hickman Architects City of Round Rock days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #54 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 415-2011 Date: 4/2/2012 Description: Add 1 auditorium chair to council chamber seating due to revised layout. Total This Cost Proposal 781 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. 01:11+,r..+4wem. John Miles dab, a.6 01.'17.1/11.Wit16.. 0 OWNER: KA Hickman Architects City of Round Rock days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #55 Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 4/10/2012 Description: Per RFP #50, Attached: Md roller shades by MechoShade per the attached specification and drawings. ADD $1.086 for the alternate to add MechoShades in the business center in the Lobby B102 and 1 window adjacent to the Mayor's office. Total This Cost Proposal 5,375 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. KA Hickman Architects MO* Aend by kAnIAlls John D oe ▪ 2012.04.1009/036.0rOW John Miles Keith Hickman Project Manager Architect 0 OWNER: City of Round Rock days Larry Madsen Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #56 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 4/10/2012 Description: Per request of CORR, E-mail Attached: Add 4 new "L2", square light fixtures in reception area A324 due to "L" shaped fixture not fitting. Total This Cost Proposal 2,518 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: Stewart Builders, Inc. aca.del.rsas.... John Miles ARCHITECT: OWNER: KA Hickman Architects City of Round Rock days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #57 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 Plans Dated: 4-15-2011 Date: 4/10/2012 Description: Per request of CORR, E-mail Attached: Install 1 - 1-1/2" data conduit in the Parking Garage. Total This Cost Proposal $ 1,500 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR: ARCHITECT: Stewart Builders, Inc. 041s*.i.dbikten Mos John MilesOlkawkinielwodistret _r`.... doakaUS 0 OWNER: KA Hickman Architects City of Round Rock days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock Stewart Builders, Inc. General Contractor • Construction Managers COST PROPOSAL #58 Contractor: Stewart Builders, Inc. 35 County Road 150 Georgetown, Texas 78626 X11015 To: Lacey Lewis, KA Hickman Architects Project: City of Round Rock - City Hall Remodel 231 East Main St. Round Rock, TX 78664 PtansDated: 4-15-2011 Date: 4/16/2012 Description: Per RFP #51, Attached: Add 2 fire sprinlder heads to ceiling/existing soffit at the entrance A108. Add fire alarm relay to NV system to tum off AN sound when fire alarm is activated. Total This Cost Proposal 1,150 Original Owner Contincency Total Previously Approved/Pending Cost Proposals Total Contincency Remaining Prior To This Cost Proposal Revised Contingency Balance Including This Cost Proposal Additional Time Required CONTRACTOR:. ARCHITECT: Stewart Builders, Inc. oKa►ldnrd.o.3l..ac John Miles' tOgle 3012.04.16 moral dSW 0 OWNER: KA Hickman Architects City of Round Rock days John Miles Keith Hickman Larry Madsen Project Manager Architect Construction Manager City of Round Rock