Loading...
CM-12-06-100ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Item Caption: Cwt, -(1- -'061 -WO VW RECEIVED MAY 31 7012 City Manager Approval Form Consider executing Quantity Adjustment/Change Order No. 1 with Insituform Technologies, Inc. for the Onion Branch 21" Wastewater Line Rehabilitation Project. Approval Date: June 1, 2012 Department Name: Utilities and Environmental Services Department Project Manager: Eddie Zapata Assigned Attorney: Steve Sheets Item Summary: This project rehabilitated 410 linear feet of the Onion Branch wastewater interceptor line that extends southerly from US Highway 79. This work was completed ahead of a drainage channel rehabilitation project that is scheduled for the channel next to 615 East Palm Valley (the old Police Department Building that was located on US Highway 79). The work corrected a defect in the wastewater line as well as removed a wastewater manhole that would have otherwise interfered with the drainage channel work. Insituform Technologies was awarded this wastewater rehabilitation project for $53,523. Quantity Adjustment/Change Order No. 1 is necessary to make adjustments to the bid quantities. An additional eighteen linear feet of cured -in-place pipe (CIPP) was installed and by-pass pumping was deleted from the contractors scope of work. This Quantity Adjustment/Change Order No. 1 reduces the contract by $3,464, which brings the total contract amount down to $50,059. No. of Originals Submitte Project Name: Cost: Source of Funds: Onion Branch Wastewater Line Rehabilitation 2011 Project ($3,464.00) Self -Financed Wastewater Construction Source of Funds (if applicable): Select Source Fund Account Number: WW02ONION Finance Director Approval: Cheryl Delaney Date: 5/30/12 Department Director Approval: Michael Thane Date: 5/22/12 **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP F--1 r--1 Budget El I I Purchasing n n Accounting n n N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Contract Quantity Adjustment/Change Order !MVO ROCK. 7F.%AS rev, 09/10 Department: Utility and Environmental Services Department City Project WW02Onion ID Number Justification Gheftgefirdtr/Quantity Adjustment No. Page 1 of 3 1 Quantity Adjustment/Change Order No. 1 is needed to add 18 L.F. of CIPP Liner and delete By -Pass Pumping. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Pius Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared By:. Signature Contractor Approval: Signature City Staff Approval: Sig City Official Approval: Signature CM -L2— a -10o Amount $53,523.00 $0.00 -$3,464.00 -$3,464.00 $50,059.00 $0.00 $0.00 $0.00 0/0 Change 0.00% 0.00% 0.00% $50,059.00 30 calendar days 30 calendar days 30 calendar days Eddie Zapata, Project Manager, CORR Printed Name, Title and Company H. Douglas Thomas, Vice President, Insituform Technologies, Inc. Printed Name, Title and Company Date , Pt:, ^ _ Da d(ey2 uttpl- Printed Name, Ttacttt at David Freireich, P.E., Printed N itlP ORR rev, 09/10 Contract Quantity Adjustment/Change Order Chan Page 2 of 3 Bid Item # Item Descri • tion and Chan .e Unit • . Unit Price Amount $0.00 Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 .......r#11P-."'-- POUND ROM TEXAS wow ....ow mnsPoere rev, 09/10 Contract Quantity Adjustment/Change Order uantity Adjustment Data Page 3 of 3 Bid Item # 1 Item Descri • tion and Chan . e 21 CIPP Linner comp ete in p ace per Linear Foot Unit LF Q 18 Unit Price $102.00 Amount $1,836.00 on ra Time Adjustment (Days) 2 By -Pass Pumping LS -1 $5,300.00 -$5,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -$3,464.00 0