Loading...
CM-12-06-109Item Caption: CM— 12 --oc9 -lam RECEIVED JUN202012 City Manager Approval Form Consider executing Supplemental Contract No. 2 with H. W. Lochner, Inc. (Lochner) for the Lestico Property Water and Wastewater Improvements Project. Approval Date: June 22, 2012 Department Name: Utilities and Environmental Services Department Project Manager: Jeff Bell Assigned Attorney: Steve Sheets Item Summary: Several years ago, the City widened Double Creek Drive as it extends northward from Gattis School Road. The widening of the road required the purchase of additional Right -of -Way (ROW) from Mr. Lestico, who is the property owner on the northeast corner of the intersection of Double Creek Drive and Gattis School Road. As per the Right -of -Way agreement with Mr. Lestico, it is the City's responsibility to construct approximately 420 feet of 8 -inch wastewater line with 3 manholes and 90 feet of 8 -inch water line with one fire hydrant assembly in order to service the Lestico property. The City currently has a professional services contract with H.W. Lochner, Inc. for design of these utility service extensions to Mr. Lestico's property. Recently, the City's Development Services Office requested that the Utility and Environmental Services Department add a water line service to the Childers property which is located on the west side of Double Creek Drive. This Supplemental Contract No. 2 is for the engineering services necessary to add a tapping saddle, 8 -inch gate valve, and approximately 40 feet of 8 -inch water line from the water main in Double Creek Drive to the ROW line adjacent to the Childers property for future service to the property. Supplemental Contract No. 1 increased the original contract from $29,865.84 to $32,395.84. This Supplemental Contract No. 2 will increase the contract $3,876.20 from $32,395.84 to $36,272.04. No. of Originals Submitted: 2 Project Name: Lestico Property Water and Wastewater Improvements Cost: $3,876.20 Source of Funds: Self -Financed Water Construction Source of Funds (if applicable): Select Source Fund Account Number: txo2dcrk Finance Director Approval: Cheryl Delaney Date: 6/20/12 Department Director Approval: Michael Thane Date: 6/18/12 CIP ❑ n Budget N/A OK El ❑ N/A OK Purchasing ❑� ❑ N/A OK Accounting ❑� ❑ N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: H.W. Lochner, Inc. (Lochner) ("Engineer") ADDRESS: 810 Resters Crossing Road, Suite 225, Round Rock, Texas 78681 PROJECT: Lestico Property Water and Wastewater Improvements This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and H.W. Lochner, Inc. (Lochner), formerly Bucher, Willis & Ratliff Corporation (BWR), hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 17th day of December, 2010 for the Lestico Property Water and Wastewater Improvements Project in the amount of $29,865.84; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on June 1, 2011 to amend the scope of services and to increase the compensation by $2,530.00 to a total of $32,395.84; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $3,876.20 to a total of $36,272.04; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $3,876.20 the lump sum amount payable under the Contract for a total of $36,272.04, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplcmcntal Contract 0199.7156; 00252226 Rev.12/01 /08 84275 H.W. LOCHNER, INC. (LOCHNER) (f/n/a Bucher,illis & Ratliff Corporation (BWR)) By: �carl— 4167-ZEcr Date CITY OF ROUND ROCK By: Date 00,t/61 Supplemental Contract 0199.7156; 00252226 AP ' ROVED A$ TO FORM: $ K.t t V Y1Voad + Cityluokler Stepan L. Sheets, City Attorney 2 Rev.12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services Basic Services: Design Phase 1. Lochner will provide the design, plans, specifications and opinion of probable construction costs for the addition of the following for the project: 24 -inch tapping sleeve, 8 -inch gate valve and approximately 40 linear feet of 8 -inch water line. Date: 12-27-2010 01-28-2011 03-09-2011 06-17-2011 07-16-2012 07-16-2012 08-07-2012 08-14-2012 09-4-2012 October, 2012 October, 2012 November, 2012 November, 2012 April, 2013 May, 2013 ADDENDUM TO EXHIBIT C Work Schedule Milestone: Issuance of Notice to Proceed to Engineer Submittal of survey to Engineer by Sub-Consultant/Surveyor 50% Design Submittal to City of Round Rock Public Works Department for review 100% Design Submittal to City of Round Rock Public Works Department for review Sealed construction documents submitted to City of Round Rock Public Works Department. This submittal is contingent on the date in which Lochner receives from the City the TCE registration/Exhibit numbers to include on the 100% construction documents. Schedule shall adjust accordingly based on TCE receipt date. Plans and Construction Documents Approved by City of Round Rock Public Works Department First Public Notice Advertisement for Bid Second Public Notice Advertisement for Bid Project Bid Opening Notice of Award Issued by City Contractor Completes Contract Documents — Secures Signatures, Bonding and Insurance Certificates City Executes Contract Documents City Issues Notice to Proceed; Conduct Pre -Construction Conference Substantial Construction Completion Final Construction Completion and Final Project Acceptance 0 0 0 0 0 0 0 0 0 0 N 0 0 0 ci 69. 69 ER h.- OA 609. CO 69 0 ti 00 Nf 69 Subconsultants 0 0 0 0 0 Co 0 0 0 0 0 0 0 0 69 O9 u ER ER 6 �- 0 6R a 0 C 0C:000000 0 0 0 0 0 0 0 ER 69 69 ER ER ER ER 0 0 0 69 O O 0 O ^ d O •00 fa 69 H M 609 ERR 60R ei 0 0 0 0 0 0 0 ti CO 6, N E 0 0