Loading...
CM-12-06-119ROUND ROCK. TEXAS PURPOSE PASSION PROSPERJTY. Item Caption: CM. I " RECEIVED JUN 2 71012 City Manager Approval Form Requesting approval of Change Order #2 Mario Carlin Management, LLC for rehab at 312 Barrhall Drive Approval Date: June 29, 2012 Department Name: Finance Department Project Manager: Elizabeth Alvarado Assigned Attorney: Jason Rammel Item Summary: The Home Repair Program assists low-income homeowners with substantial repairs such as roofing, plumbing and electrical work. The program provides grants of up to $25,000 in order to improve home safety and bring substandard properties into code compliance. The program does not address cosmetic improvements. Home Repair Contracts may be amended if a change order is needed to complete any of the items in the work write up as long as total change orders do not exceed 25% of the original contract amount. Requesting approval of change order #2 in the amount of $1,520 for the home repair at 312 Barrhall Drive. The Home Repair Agreement with Mario Carlin Management, LLC was approved April 17, 2012 in the amount of $15,325. Change order #1 was approved on June 8, 2012 in the amount of $1,850. Change order #2 is needed in order for the contractor to complete work write up items Exterior #2 an Interior #'s 5 & 8. City inspector Darrell Hall met with the contractor and homeowner and determined that this additional work and change order amount is justifiable. This change order is 9.92% of the original contract amount. No. of Originals Submitted: 1 Project Name: Single Family Rehab -Home Repair Program Cost: $1,520 Source of Funds: CDBG HUD Entitlement Grants Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: Cheryl Delaney Date: 6/25/12 Department Director Approval: Cheryl Delaney **Electronic signature by the Director is acceptable. CIP r--] r--1 Budget N/A OK El N/A OK Date: 6/25/12 Please only submit ONE approval form per item. ** Purchasing El El N/A OK Accounting ❑o N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Department: Program: Construction Change Order Community Development Block Grant Home Repair Program Location: 312 Barrhall Drive Homeowner: Barbara Penney Original Contract Price: This Change Order Change Orders to Date: Maximum Change Order Allowed $ amount Balance available $15,325.00 $1,520.00 $1,850.00 $3,831.25 $1,981.25 Change Data Page: Date: Change Order No. Original Contract: Justification: 1 of 2 06/11/12 2. 15,325 This is an unforeseen circumstance. City Inspector Darrel Hall reviewed change order and performed an inspection at 312 Barrhall Drive and confirmed that this work is needed to complete item work write up items. Change order amounts were justified by city inspector Gary Lawrence. Item # ( - )or (+) Description of Changes Unit QTY Unit Price Amount Days +/- Exterior 2 (+) Replace all windows. Shutters were removed inorder to install windows, they fell apart when they were being reinstalled. New shutters needed to be bought and installed to replace old ones. 58.33 6 $38.33 $350.00 1 Interior 5 (+) Replace tub in hall with surround shower. Work write up did not call for shower door, as per city inspector, shower door needs to be added. 500 1 $500.00 $500.00 5 Interior 8 (+) Remove existing living room carpet and replace with vinyl flooring. There was 2 layers of vinyl under the carpet that contractor had to remove. 400 1 $400.00 $400.00 1 Interior 5 (+) Replace hardware in hall bath sink with like standard grade. Once hardware was removed, water supply lines were very corroded and needed to be replaced. 85 1 $85.00 $85.00 1 Interior 5 (+) Replace hardware in hall bath sink with standard grade. Once hardware was removed, sink cracked. Contractor replaced with new sink. 185 1 $185.00 $185.00 1 $1,520.00 9 Project Mana amiu aoititiA Percent of Original Contract Price 6/11/2012 Maximum % allowed Date Contractor dz—o(97-6�� This Change Order 25.00% 9.92% 6/11/2012 By: Title Mario Carlin Management, LLC Owner Total % Change 06/11/012 Date Contract + Change Order' $18,695.00 21.99% Homeowner 2 of 2 Date Appro Title Date Steve Ngpwood, C' Manager E �C J//r� CDBG Form 1/2009 6/11/2012 MARIO L. CARLIN P.O. BOX 6087 ROUND ROCK, TX 78683 Bill To COMMUNITY DEVELOPMENT BLOCK GRANT HOME REPAIR PROGRAM 312 BARHALL DRIVE ROUND ROCK, TEXAS Invoice Date Invoice # 6/18/2012 59 P.O. No. Terms Project BARHALL Quantity Description Rate Amount 6 1 1 1 1 Replace all windows. Shutters were removed in order to install windows, they fell apart when they were being reinstalled. New shutters needed to be bought and installed to replace old ones. Replace tub in hall with surround shower. Work write up did not call for shower door, as per city inspector, shower door needs to be added. Remove existing living room carpet and replace with vinyl flooring. There was 2 layers of vinyl under the carpet that contractor had to remove. Replace hardware in hall bath sink with like standard grade. Once hardware was removed, water supply lines were very corroded and needed to be replaced. Replace hardware in hall bath sink with standard grade. Once hardware was removed, sink cracked. Contractor replaced with new sink. Thank you for your business. 58.333 500.00 400.00 85.00 185.00 350.00 500.00 400.00 85.00 185.00 Total $1,520.00