CM-12-08-153ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY Item Caption: O$ -1S3 RECEIVED AUG 16 2012 City Manager Approval Form Consider executing Supplemental Contract No. 1 with Brown & Gay Engineers, Inc. for the Railroad Quiet Zone Study Project. Approval Date: Friday, August 17th, 2012 Department Name: Transportation Department Project Manager: Chad Wood Assigned Attorney: Steve Sheets Item Summary: This supplemental agreement will expand the scope of work for the City's consultant team on the Railroad Quiet Zone project. During preliminary study of the existing crossings it has been determined that two of the at -grade highway -rail crossings at the McNeil Road and IH -35 frontage roads intersections are not considered by the Federal Railroad Authority to be on the same rail -line as the other six public crossings. These two crossings will have to be made quiet through a separate Quiet Zone application. Transportation staff chose to proceed with these two other crossings now so that the two Quiet Zone Applications can be submitted simultaneously and hopefully approved together as well. The efforts for the field study, database analysis, and diagnostic team meeting work included in this supplemental agreement were completed previously when the work for the other six crossings was taking place. The fee proposed will cover the consultant team for the additional efforts on those tasks as well as for the additional reporting and Quiet Zone application paperwork which they will complete later this year. No. of Originals Submitted: 2 Project Name: Railroad Quiet Zones Cost: $25,123.80 Source of Funds: General Self -Financed Construction Source of Funds (if applicable): Select Source Fund Account Number: RRO5ZONE Finance Director Approval: L. Olsen for C. Delaney Date: 8-14-2012 Department Director Approval: Gary Hudder Date: 8/13/12 CIP ❑ ❑� Budget n n Purchasing N/A OK N/A OK ❑� ❑ N/A OK Accounting ❑ n N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Brown & Gay Engineers, Inc. ADDRESS: 7000 N. Mopac, Suite 330, Austin, TX 78731 ("Engineer") PROJECT: Railroad Quiet Zone Study This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Brown & Gay Engineers, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of March, 2012 for the Railroad Quiet Zone Study Project in the amount of $149,900.00; and WHEREAS, it has become necessary to amend the Contract to add two at -grade crossings to the scope of services and to increase the compensation by $25,123.80 to a total of $175,023.80; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $25,123.80 the lump sum amount payable under the Contract for a total of $175,023.80, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1220; 00259913 Rev.12/01 /08 84275 BROWN GAY ENGI + ERS, INC. ////lid t Ice, A cie)ail0, / rA01/42 By: Date Supplemental Contract 0199.1220; 00259913 2 APPROVED AS TO FORM: Ste ` > a Teets, City A torney Rev.12/01/08 84275 ADDENDUM TO EXHIBIT A City Services The City will provide the following: A. Any mapping or survey information available for the crossing locations. B. Timely reviews and decisions to maintain the project schedule. • ADDENDUM TO EXHIBIT B Engineering Services Preface The purpose of this Supplemental Contract is to develop a railroad quiet zone for two at -grade crossings on the UPRR secondary line known as the "Georgetown Industrial Lead" in the City of Round Rock. The crossings are listed in Table 1 with their individual Crossing numbers. The Engineer will perform the following tasks: A. Office Data Collection and Review 1. The Engineer will investigate accident history at each crossing for at least 5 years to verify FRA data for the quiet zone study. The Engineer will analyze the data and prepare tabular summaries. 2. The Engineer will review the national crossing inventory database. B. Concept Development/Alternatives Screening The evaluation of each of the grade crossings will be based on the criteria for the establishment of quiet zones, outlined in the Train Horn Rule. The evaluation will focus on safety measures that could be used to compensate for the absence of the train horn. While SSMs are typically preferred, the study will include options for modified supplemental safety measures, also described as ASMs. The Engineer will: 1. Identify potential SSMs for consideration and provide a comparison of the anticipated benefits versus the typical costs associated with each safety measure, to eliminate cost restrictive alternatives. 2. Prepare and submit the findings from the concept development and alternatives screening phase to the City of Round Rock for review and comment. 3. Develop preferred alternatives for each grade crossing through this process. C. Quiet Zone Development As part of the quiet zone development process, the Engineer will perform the following tasks: 1. Evaluate the various safety measures using the Quiet Zone Calculator. The quiet zone options will be narrowed to two, and if possible, one preferred option. Once preferred alternatives are selected for each grade crossing, development of the quiet zone corridor can begin. Various scenarios will be run through the FRA's Quiet Zone Calculator to develop quiet zone creation alternatives. ASMs that reduce the Quiet • Zone Risk Index (QZRI) to a level below the Risk Index with Horns (RIWH) or the National Significant Risk Threshold and provide effective safety improvements may be an option. 2. Prepare and furnish updated USDOT Grade Crossing Inventory forms for TxDOT and UPRR submittal to the FRA. This information is critical for use in quiet zone calculations to determine the QZRI and the RIWH for the proposed quiet zone corridor. D. Diagnostic Team Meetings and Report 1. Review traffic control devices compliance with the TMUTCD and make recommendations to ensure that all the crossings meet current TMUTCD standards. 2. Document the findings of the diagnostic team and incorporate the findings into the overall safety improvement plan recommended for the proposed quiet zone corridor on UPRR's Georgetown Industrial Lead. E. Develop Conceptual Plans/Design At -Grade Improvements 1. The Engineer will provide concept sketches of each crossing with the proposed SSM or ASM and a description of how each quiet zone crossing will operate. 2. The Engineer will use the UPRR standards and specifications in developing conceptual plans for each grade crossing once the diagnostic team recommendations have been developed; additional improvements will conform to the City of Round Rock and TxDOT's standards and specifications. 3. Prepare budget level construction cost estimates based on the recommendations of the diagnostic team and the schematic design plans. F. Preparation of Applications Once the City has approved the project and requested agreements from UPRR, the Engineer will: 1. Prepare and provide the Notice of Intent (NOI) to the City for their submittal as required by the Train Horn Rule. There is a required continent period of 60 days. This work can be accomplished simultaneously with agreement preparation by UPRR. 2. Prepare the Notice of Establishment (NOE) for submittal once all the quiet zone work is completed. There is a minimum of 21 day notice before the quiet zone can be implemented. • G. Meetings and Coordination with Stakeholders The Engineer will attend meetings as outlined below, prepare meeting documentation and coordinate the project with all stakeholders as follows: 1. Attend the following meetings: 0 Meeting with City staff to review the results of the study 2. Prepare meeting agendas and distribute pertinent information ahead of the meeting. Prepare meeting minutes, distribute the minutes for comments, revise the minutes as needed and distribute the final minutes. 3. Coordinate with stakeholders (TxDOT, FHWA, FRA, UPRR) for the duration of the project. Table 1 UPRR's Georgetown Industrial Lead Railroad Crossings List RR Crossing Crossing # Type of Notes Location Control 1 IH 35 SB FR 439-697T Flashers & Gates, This crossing will be treated as a Traffic signal. separate quiet zone from UPRR's main line. 2 McNeil Rd. 448-435K Flashers & Gates This crossing will be treated as a separate quiet zone from UPRR's main line. 3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page Exhibit C Work Schedule 1 Wproo" OZAPRI2 2 K&4--M—edra 09APR12 3 ID&MCWedm&RqAw 09APR12 1tIMAY12 ' 4 D Attememm 01MAY12 18JUN12 5 IQLWZomDeaWrwt 21MAY12 29JUN12 i T 1 ph= MJUL12 31AUG12 8 mm teed QZ OSAUG12. 14SEP12 9 "wWmdNOYNOE 11 12OCT12 10 Review 1SOCT12 31DEC12 11 AaemyCoordniWan 09APR12 31DEC12 ®Earlybar tl•Progress bar ®Cr'kd bar �Summeryber ♦ stwt rrilestoee point ♦ Fifth rrilmane poirt • O O NJ O N l0 a!1 O Q N Q N N rrn l0 leo fV fV 4 Ct sO 111 et r-1 O O1 rl Lfl 1[1 i`; CV r -i M M N LP) O O O O O O O V1 00 0 0 0 0 O; N LCI tf 'N O o 000 T-1 l^a 1f) I) to to ri I.f)401 rl M e-1 . N aA. c. 'c 0) UL in t in O 3 O CL N i f8 v c fv c c c E` m o o a) n, a� O N tui.) sZ rust, ca .Iv:: U > -o 4_, f0 Q/ Q N in d 0 U C 0) t U d0 m u�ou o Oo 147, 3 c tsa 1. i - O_ O 03 0 V O ..a` G c` O n3 H U cco i O. 0) N 0 O; La. owLLW. V1� O 0) 00 �-1 1/1 4-0 0 U is 0 h-