R-2016-3230 - 2/25/2016RESOLUTION NO. R-2016-3230 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Inc. for the Sundance Parkway and Parker Road Street Reconstruction (La Frontera Phase II) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been detennined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Cash Construction Company, Inc. for the Sundance Parkway and Parker Road Sheet Reconstruction (La Frontera Phase II) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of February, 2016. 0 ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SOW K%U2� SARA L. WHITE, City Clerk 0112.1604;00351972 EXHIBIT "A» Contract Quantity Adjustment/Change Order "n<umn mx�, nx. v, 08/12 )epartment: Transportation 'roject lame: Sundance Pkwy & Parker Rd Street Reconstruction Ity Project D Number TX05MNTLF ustification Pa. -e I of 3 Date: 11/30/15 Change Order/Quantity Adjustment No. 2 liscellaneous change order items for traffic circle area. Quantity adjustments for additional Type C HMAC, and Deduction in Type B HMAC, and additional oncrete quantities for concrete items. UMMARY riginal Contract Price: revious Quantity Adjustment(s): his Quantity Adjustment: otal Quantity Adjustment(s): otal Contract Price with Quantity Adjustment(s): revious Change Order(s): his Change Order: otal Change Order(s) To Date: djusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) us Change Order(s)]: ifference between Original and Adjusted Contract Prices: Amount % Change $3,088,927.00 -$357,431.80 $99,635.00 -$257,796,80 $2,831,130.20 $13,096.80 0% $38,014.00 1% $51,110.80 2% $2,882,241.00 -$206,686.00 riginal Contract Time: 202 Calendar Days me Adjustment by previous Quan. Adj./Change Order. 0 Calendar Days me Adjustment by this Quan. Adj./Change Order: 0 Calendar Days =-w Contract Time: 202 Calendar Days Submitted for Approval'` , , eared By: (;� lc&;A � B.J. Cash, Cash Construction t %Ztst 1 ILA Sig re Printed Name, Title, Company Date A PP royals �a W, AP )ntractor: '+1U\ cty—owl B.J. Cash, Cash Construction Signl&re Printed Name, Title, Company Date ty ProjectJ0 anagen. Bill Stablein, Project Manager, CORR �" -97-4, Signature Date ayor/City anager Alan McGraw, Mayor, CORR Signature Printed Name, Title Date Page 2 of 3 Contract Quantity Adjustment/ Change Order �r.,n,i�xg:LFxn. x8/12 Project Name: Sundance Pkwy & Parker Rd Street Reconstruction Quan. Adj./Change Order No. Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 75 ITEM - 4434 4 INCH P.C. CONCRETE MEDIAN (additional concrete 2" at Traffic Circle) LS 1 $4,580.00 $4,580.00 0 76 ADA Ramp Re -Work at Traffic Circle LS 1 $5,395.00 $5,395.00 0 77 Mill Out and Remove at Parker Rd and 45 2" to 6" SY 556 $9.00 $5,004.00 78 Irrigation Repairs (Sundance and Parker Road) LS 1 $20,000.00 $20,000.00 79 Lower Clean Outs and Concrete Around EA 3 $695.00 $2,085.00 80 Tree Well at Traffic Circle LS 1 $950.00 $950.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Parc 3 of 3 Contract Quantity Adjustment/ Change Order ucx;vq n(rx.iczwt v, 08112 Project Name: Sundance Pkwy & Parker Rd Street Reconstruction Quan. Adj./Change Order No. Quantity Adjustment Data $99,635.00i 0 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 13 ITEM - R340 HOT MIX ASPHALTIC CONRETE PAVEMENT TYPE B TON -903 $88.00 -$79,464.00 14 ITEM - R340 HOT MIX ASPHALTIC CONREfE PAVEMENT TYPE C TON 769 $110.00 $84,590.00 21 ITEM - R432 P.C. CONCRETE SIDEWALK SF 3,553 $6.50 $23,094.50 22 ITEM - R433 P.C. CONCRETE DRIVEWAY SF 1,076 $9.50 $10,222.00 23 ITEM - 4434 4 INCH P.C. CONCRETE MEDIAN (Attional Qty at Island at Traffic Circle) SF 3103 $17.00 $52,751.00 24 ITEM - R436 P.C. CONCRETE VALLEY GUTTERS SF 169 $9.50 $1,605.50 42 ITEM - T644 2001 IN SM RD SN SUP & AM TY 10BWG (1) SA (P) EA 10 $600.00 $6,000.00 2 ITEM - R104 REMOVE P.C. CONCRETE CURB LF 38 $7.00 $266.00 15 ITEM - R430 P.C. CONCRETE CURB AND GUTTER (FINE GRADING) LF 38 $15.00 $570.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $99,635.00i 0 RESOLUTION NO. R-2016-3249 WHEREAS, the City of Round Rock has duly advertised for bids for the Southwest Downtown 411 Main Street Project; and WHEREAS, Central Road & Utility, Ltd. has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of Central Road & Utility, Ltd., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Central Road & Utility, Ltd. for the Southwest Downtown 411 Main Street Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of February, 2016. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1604;00351888 THE CITYOFROUND ROCK BIDS EXTENDED AND CHECKED Transportation Department 2008 Enterprise Dr. BY: lvbv l0l atrick Round Rock. Tt=. 78664 DATE: 7JI12016 141717 t A.r,(n3 BID TABULATION SHEET I OF I t Excavation, Excavation, complete in place and Property Dispose OOsits (by Method m(" '-y) CY 777.00 520.00 ;rete a' ardoned road and DI so Mir SFF6,O (Bir -k Bwa), Ihbu+aement M78rod B) under, and 1.5 feet behind, roadway arrb3 51.50 no P.C. Conaota Vdewak, Driveway, and other M=Ilenews Concrete nanan=and Properly Mwas, OffisM SF Hot MaAsphalEtConcrete PwomenlSurface Courts, 2inches, Typo D,(klaasuroment $6.00 no Trees and ProD- ofthe 53.00 Sidewalk Concato Paver Units, Sidmvalk Pavy Socio+[ Sidewalk CorlaNa Paving Unit (2 St90a.aI Protective Fencing Type A Chan link fence, Tompomry Tree Protection Fendrg. tined troe hoot O» pmjodPsctocM LF Baso, and 6' Ro-CompacW Moiz7xo Condtloned Subgrads 36.50 Fencing Typo B Wood Fonoo -Treo Protocfion-Troo Bark Prob3don 'erg, maintained Lhroughoutthe prdact (F Stabi5zod Crudrod Umostono Rmiblo Baso, and G Ro-Coapac!ad Wis4me Conditioned $65.00 Inlet Protection (Incl des area inlets, curb inlos, and trunci drains), trointanod EA $4,712 00 515.00 $3,729.00 I 5185.00 management of aclivi0os amodatod with and full oogAance with TCEQ � and Programs including, but not IrRod t% SW3P. WPAP and Sewage System Plan roquuomonts. (fhmo Vtjoctdocumonb ace meds part otthe iloo $3,750.0 Cmtrxtr documontation of cit mp5anm is abD Inc)udod ass dalveable for Ods Subgred. Pmp-fie 6' Scarified Moi. -Am Condi'vonod than Rocompactod Sutgrode SY 1331.00 $17.00 MaWials (CH S*rndo Aran) $592200 Asphaft Stabilized Bam: Hot MxAsphatx Concrete Base Vthick Tx00Tltem 340, Type I SY 1331.00 $55.00 (Bir -k Bwa), Ihbu+aement M78rod B) under, and 1.5 feet behind, roadway arrb3 S300 Primo Cord G30 GAL 16100 S1 a no Hot MaAsphalEtConcrete PwomenlSurface Courts, 2inches, Typo D,(klaasuroment SY 1080.00 $25.00 Method B) 53.00 Sidewalk Concato Paver Units, Sidmvalk Pavy Socio+[ Sidewalk CorlaNa Paving Unit (2 $760.00 T8' thick) wi'ih1-Sand. 6-ain.2sack Cement StabhizodCrushodUmstorwFhxiblo SF 2670.00 $10.00 Baso, and 6' Ro-CompacW Moiz7xo Condtloned Subgrads 575.00 (TxDOT TY -2 d TY -3) Sldewa3c Curb Ramp Con=10 Paving UM with 1' Sand, 6' Cement i 41 `%`� zi (A' Stabi5zod Crudrod Umostono Rmiblo Baso, and G Ro-Coapac!ad Wis4me Conditioned Sr' 246.00 $19.00 Subgrade, Includ'utg contrasting doteCsblo vmming utit pa ons : udlily, LTO comWcdon, $15,540.00 520.00 $15,540.00 $592200 $2.00 S 69600 31.35D.00 S300 $675.00 511,400.DD $1,000.00 6000.00 $195.00 53.00 $90.00 $760.00 $30.00 5360.00 $185.00 i 575.00 $75.00 $3,750.00 53,000.00 $3,C00.00 , D I= soeooeo.e �'1��7�f�[� � ���� • O° ov S650.00 570.00 57000.00 401� S22;627.00 520.00 $26,620.40' ^ V o i1t 77 o t� ..............................`r KILpr T�4CiK 573205.00556.00K 574,536.00 K JOHN `A 17�.eoe.e e...e°°v.................... B e ;" n. �7 gp � e C,}:.: ei f 57 61000 10.00 51 b10.00 .00 527,000 524.00 525,929,00,�� r �i 1`��1�v°•��i:J U 1 r•�v,,;D 526,700.00 $12.00 53$040.00 i 41 `%`� zi (A' : $4,712 00 515.00 $3,729.00 '% ��`D�/ZQ/� IRotbdodzod Typo I7haon* sdc Pavonnt Markings 4 bd=in width, 100 n is in I lP I 850.00 I $6.50 I 36,175.001 $5.001 54,750.001 I I I I 120V, 2aA GFIRocVtacb Wnh SN)o Gag Back Bax 2.314' and5mgW Gang Voctlwl In, F -A 4.00 $1,050AD 54,200.00 $135.00 $540.00 Usa Caner t Pug H had capable, wkr ez m.trlr EA ZOO Sc 500.00 1 S9 000.00 I 32 645.00 29000 Complato Sboat Electric Ming, Fund shin and ln3talla5an, kejdvg 699 service pa not EA 100 $15,000.00 515,000,00 540,000.00 $40.000.CO w shown In the plata and spodhcatiomv _ -_-- - act of Shoot Tm including excavation (6x 6' x 301. planting rmx, tree ilrmlation bo provided by City of Round Rock), and mulch InstalUtion (muYh provided by ' EA 3.00 53,000.00 1 Rock) 39,000.0 1 $5,000.00 1 $15.000.00 �m V O O CK 1� ° a L1... ° `�•e o c o a `> p O � SYyam✓ [py6 x R k y �r N c C. CG z im W Z q A cc W o W � Q CA o a U L O C � h L) m pj J . Q J � — d U Q N a Ww o x � 0 v U m K a h w/ � U � y � O 9 ry O O U m J Q O Fr NO M b 0 N N a a m O tip w z U F f, V oq �m V CK 1� ° a L1... ° `�•e LLoYe{ 9 LIJ ( ° �• ° SYyam✓ [py6 O 0°°��— eller L xn-ko rain Todd Keltgen Transportation Operations Manager City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 RE: 411 Main Street Dear Mr. Keltgen: BID TABULATION 411 MAIN STREET February 2, 2016 Seiler Lankes Group, LLC has reviewed the submitted bids for the above project. There were two responding firms and the bids ranged from $491,165.00 to $588,280.00 with Central Road & Utility, LTD submitting the low bid. We have tabulated the bids, verified acknowledgment that there is no Addendum, submission of the Bidder's Safety Experience and the inclusion of the 5% Bid Bond. We have verified bid form quantities and checked that the quantities and unit prices total correctly with no mathematical errors. We find all information to be complete and in order and recommend that Central Road & Utility, LTD be considered for award of the contract. Very truly yours, T John Kilpatrick, PE Seiler Lankes Group, LLC Seiler Lankes Group, LLC O 901 Round Rock Ave., Suite C-100, Round Rock, Texas 78681 0 Firm No. 12670