Loading...
CM-2016-1043 - 2/26/2016STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: BROWN & GAY ENGINEERS, INC. ("Engineer") ADDRESS: 7000 N. Mopac, Suite 330, Austin, TX 78731 PROJECT: Railroad Quiet Zone Study This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Brown & Gay Engineers, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of March, 2012 for the Railroad Quiet Zone Study Project in the amount of $149,900.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on August 17, 2012 to amend the scope of services and to increase the compensation by $25,123.80 to a total of $175,023.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on June 13, 2013 to amend the scope of services and to increase the compensation by $141,700.51 to a total of $316,724.31; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on June 26, 2014 to amend the scope of services and to increase the compensation by $19,950.00 to a total of $336,674.31; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $47,425.00 to a total of $384,099.31; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, En in�g Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev. 12/01/08 0199.1220; 00351580 84275 Il. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $47,425.00 the lump sum amount payable under the Contract for a total of $384,099.31, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. BROWN NGINEERS, INC. By: ED£R� Ei�DO�A rgovG/ P L Date CITY O L By: 1 LAtan t! Date Supplemental Contract 0199.1220; 00351580 011 2 =D rTO ORM: Steph n L. Sheets, City Attorney Rev. 12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services Preface The scope of services for this Supplemental Contract No. 4 shall be to continue to provide professional services for the implementation phase of the railroad quiet zone project in the City of Round Rock. These services shall include: project management, scheduling and coordination efforts; additional agreements with the UPRR; updates to the project plans due to additional requirements; and updates to the environmental documents due to recent changes in the environmental checklists and process. The duration of the project is being extended by approximately 18 months, as a result of delays incurred in the Union Pacific Railroad's development of construction cost estimates. These estimates were received by the City in August and November of 2015, approximately 17 months after the dates originally scheduled. The project still includes two separate quiet zones: one for the main UPRR line at -grade crossings from CR 172 to Redbud Lane, and one for the two at -grade crossings on the UPRR secondary line know as the "Georgetown Industrial Lead" at IH -35. The Engineer will perform the following tasks: A. Project Management and Scheduling 1. Revise the project schedule to reflect the extension of the project to approximately August of 2017. The project schedule will be prepared with Suretrak or Primavera P6 software. 2. Update the project schedule as needed or in a bi-monthly basis. 3. Coordinate the project with UPRR as needed, but at least on a monthly basis until the construction agreements between UPRR and the City are signed. Coordinate with UPRR on a bi-monthly basis after that. Coordinate with TxDOT and FRA as needed, and assist the City in coordinating the project with Amtrak, LCRA and the BNSF railroad. 4. Prepare monthly or bi-monthly reports as needed to document project progress. B. Preliminary Engineering Agreements 1. Assist the City in the preparation of Preliminary Engineering Agreements with UPRR for the following location: o Brushy Creek Wastewater Treatment Plant 2. Prepare exhibits (Exhibit "A") for the location listed above. 3. Review responses from UPRR and provide feedback to the City. 4. Prepare a Notice of Intent (NOI) for LCRA and other possible stakeholders. Page 1 of 2 5. Update Quiet Zone Risk Index calculations as needed. C. Prepare Environmental Documentation The environmental documentation update will include separating the railroad quiet zone project into two stand-alone c -list Categorical Exclusions (CEs). One CE will encompass the two federally -funded crossings (at CR 172 and at St Williams Street), and one CE will encompass the IH -35 at -grade railroad crossings. The scope of work will include updating the February 2014 Blanket Categorical Exclusion (BCE) document previously submitted as follows: 1. Prepare two Project Scope Development Tools and supporting documentation, one for each project. Meet with Austin District to review the Project Scope Development Tool, and confirm no regulatory agency coordination is required for National Environmental Policy Act (NEPA) clearance of these projects (i.e., TPWD, USACE, THC, etc.) 2. Prepare two biological resources, hazardous materials and historic structures Technical Forms and supporting documentation, one for each project. Submit deliverables for TxDOT Austin District reviews and approvals. Based on the scope of the project, no additional technical reports are required. 3. Address comments from TxDOT and prepare final documents. Scope includes one round of revisions based on TxDOT documentation. D. Prepare Design Plans Update the design plans for roadway improvements and the installation of traffic control devices as identified for each of the grade crossings listed below. The plans will be on 11 x17 plan sheets in accordance with the City of Round Rock design guidelines as well as TxDOT design standards for signing and signalization. The following plans shall be prepared: 1. Brushy Creek Wastewater Treatment Plant o Add median curbs and vertical delineator devices on each side of the existing railroad crossing gates. o Update the Pavement Markings and Signing Plan 2. Private Crossings o Update the Signing Plans per latest standard provided by UPRR. 3. Revise the respective Quantity Summary Sheets for the above locations and the overall project. 4. Revise Standard Drawings and Details for roadway work, signing, pavement markings, and traffic control during construction, as needed. 5. Prepare miscellaneous exhibits as needed. 6. Revise the Bid Forms to reflect the changes outlined above, and to specify that surveying work for fence installation will be the responsibility of the contractor. Page 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Task Anticipated Completion Date Anticipated start date February 26, 2016 Preliminary Engineering Agreements w/ UPRR April 15, 2016 UPRR Preliminary engineering estimates August 30, 2016 Construction/Maintenance Agreement w/UPRR June 30, 2016 Design Plan Updates April 30, 2016 Environmental Documents Update March 30, 2016 Civil bid/construction package 1 June 30, 2016 Civil bid/construction package 2 June 30, 2016 UPRR construction of improvements June 30, 2017 Submit Notice of Establishment (NOE) July 30, 2017 Project close out August 2017 O z U C O U C a) E a) Q CL 7 U) LU J ❑ LU 2 U LU w LL IL U LU I -- U H z O U w w O O O O O O T- M Cn N 4 (O Q1 4 1` M O) LA 0o H r M M O CA I 00 O E9 O V) M N O O N M O O M O M N N ao r N Lo U ti NT q* J 63 ER O O r O r O 00 Lq O M O M O O v O F- O m 1- � 0 r r M Eg 6FT 69 6R 61% 69 69 69 61? 60 60 69 c 69 O O O O O O O O O O 0 O O U co co C6 .° m m J m m L Il C-li ui z m m N m L a.a� Wcn O Q r C U C N n O U is C r N Lf) I� (O r Ln O O O U m U m Q C f� = r r r r U U U L CEEEE ami ami ami ami cB m m m a) 0) O Cn Cn Q. Cl) 69- 69 69 K) Hi 69 69 69 60- 9LO LO (p O O O O O O r r OR O O O O O Ln Lq r (p O r 'IT I` M I— O rr Q) � O ONO N G � 00 M ccc I` N I` 0) N (3) O r r (p r N (D 3 r m O a. 69 y} (i} 69 (F} 69 69 69 60? Y CO F- Y 0 En O CM C U w O E U r a) m z O O r L m C) 3 F- rn rn C C E L)U cn cl LU E ° cl ° clU)cn m ❑ a) LU c (n 'M m ()( m O a) 2 m E a :3v O Co U) U E o a) . ❑ Ul -O U � U C L L C a) :9 O 0- W ❑ m U ii ❑ Q m 0 ❑ w U- (D IL U LU I -- U H z O U cl .0 X W N O r m rn m a M Cn T O 0o M E9 O O O O In 6 ti ti NT q* 63 ER O O r O r O 00 Lq O M O M O O v O N O m 1- � r r M Eg 6FT 69 6R 6H c En 0 U .° m m J m m L Il C ° � o L a.a� Wcn O Q U E a) CL E C U C n O U is C p E U m U m U m U m Q C C C C m U U U U L CEEEE ami ami ami ami cB m m m a) O Cn Cn cl .0 X W N O r m rn m a O C a w � N J y 2 O ,C U) U W— W W LL LL F ❑ U) V'^ F J M U _ } W m Co 3 M O L O in v O N 0 O O O O 0 0 0 0 0 0 O O O J 0 0 0 0 0 0 N Q O y O U) 0 0 0 0 0 0 0 0 0q tD O O 613, 0 0 0q 0 0 O R F- (D Lo V O V' (D Il- M O CD U') M Cl) M W N M O) 00 tD O Cl) 00 O 00 Cf) co V' 00 N 00 h M m M O) O M r R 0)O- ~ M h CM to �� m M l0 1� M h Cn M (D M Cn N CO U ff)to � �U U3 U3 b9q 6��Efl Z R (0 t6 69 (fl EtT W 15 o W } F O O rfl Zoouo Q M M U CJ w N O m N 0 U C) R J 7 O a N O O O N a O M N r r T Cf) M d' O Cl) O r C14 -It r N -It r N o r N r r r r r M O O U F- F- (6 w O E C_ O O (n E N� 0 O M m °) N co n Q (D —d r Q (n fA O O 01 ❑ C ❑ CU 00 M M V tb N O V' O O h U 00 Vi co to c CU w F «n O � C C -4 O O .C:N W LOO tb tb N (D O 69 M W Q u► O (J N > nn O .o W N C:) M M C co co V O co N IL O U r w — Cl) d4 O OC a) w O O O c c O En T Ln rcc NV' co 00 N N N CC)N N N Cl) cc k (n c U W 0 U) 0 U O7 C) 0 co O ca C C6 N tbO CA c-, N V N U O a 69 r r v► _ to O O L to N � d o a c = " (0 cl @ w 3 O O] N C7 (n (D :2 c C cr N a Y Z o - n v c Q Z) L L C N w Y U n C c r to (p w N O CO N U Y w E E cl.ow.5 ZOO (0 O C=.) 00 (n N� t x c o O CO Z L O` 0 a' O F- Q F- to C Q (D R J O LL C z it E Cc En Q O O lL �- (9 W 0 N O z� E W �w �� S~ `o E n m m'c U o �a F- Woa oW �= yU J O C(t_ U (L 5 W o N N❑ �L Z 0 O¢ O c o E c 0 y c N E -O -a to E Q m 3 w o w n Q c c Q o a� v❑ N t a= `o D Q .m 2-6n Co E> a w- OZ 0 Z 4) U 2� m t a' d) N `m a) `m O w O cn N N X w 0 Ln m a R Z (a a3) (U °� o a L c to U a °o a>i aa O v ao Z .> j 3 Of❑ U a a a w a❑ w m❑ Q C7 m a 00 20� O w > in a'—Nco.4-W-- V'(l7ZrNMW FNM V tf)(D a a w ❑ m U ❑ Q v O N 0 0 0 0 0 O 0 00 0 0 O J N 0 0 0 m N Q (D O U) ER U> r M tD O 6%i 613, (f! !fi F- O O O V O M O O ~ O (A M O U Z R (0 t6 W W W } F O O Zoouo Q M M CJ w N 0 U C) w O F- U) F- O U F- (6 w E 0 as m °) —d v O N City of Round Rock 1 F f' ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 4 with Brown & Gay Engineers, Inc. for the Railroad Quiet Zone Study Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/26/2016 Dept Director: Gary D. Hudder, Transportation Director Cost: Indexes: Attachments: Partially executed SC#4 w -Brown & Gay for the Railroad Quiet Zone Study Department: Transportation Department Text of Legislative File CM -2016-1043 Consider executing Supplemental Contract No. 4 with Brown & Gay Engineers, Inc. for the Railroad Quiet Zone Study Project. The original project was approved in March of 2012 and an analysis was conducted. Brown and Gay put together a set of plans for the upgrades at the proposed crossings from CR 172 to Red Bud Lane. Those plans were submitted to Union Pacific Railroad, comments were addressed and plans were approved. The City received estimates from Union Pacific for the Railroad work in December of 2015. The City is waiting on final agreements from Union Pacific, once received those will be reviewed and submitted to City Council for approval. After Council approval the actual work can be scheduled. The scope of services for this Supplemental Agreement No. 4 will continue to provide professional services for the implementation phase of the railroad quiet zone project. These services will include project management, updates to project plans due to additional Union Pacific Railroad requirements, updates to environmental documents, scheduling and coordination efforts. In addition, the duration of the project is being extended approximately 18 months, as a result of delays incurred by Union Pacific Railroad. The cost of this supplemental contract is $ 47,425.00. City of Round Rock Page 1 Printed on 212512016 Agenda Item Summary Continued (CM -2016-1043) Staff recommends approval. City of Round Rock Page 2 Printed on 2/25/2016