Loading...
CM-12-12-258ROUND ROCK, TEXAS PURPOSE PASSION. PROSPERITY Item Caption: C,M—z _, 2_ Zs 8 DEC 0 5 2012 City Manager Approval Form Consider executing Quantity Adjustment/Change Order No. 1 with Austin Filter System for the Onion Branch Bank Stabilization Project. Approval Date: December 7, 2012 Department Name: Utilities and Environmental Services Department Project Manager: Lance Shellenberger Assigned Attorney: Steve Sheets Item Summary: The Onion Branch Bank Stabilization Project extends from U.S. Highway 79 to near the confluence with Brushy Creek and has experienced some severe erosion problems due to increased flows in recent years. The existing conditions of the banks have eroded to the point of placing the City's existing water, wastewater and storm water infrastructure in jeopardy. During construction and revegetation to protect the banks from future erosion, a significant rainfall event occurred and it was determined that additional erosion control measures were needed to limit construction site runoff. Change Order/Quantity Adjustment (CO/QA) No. 1 is for approximately 75 feet of mechanically -stabilized earth (MSE) Wall to lessen the steepness of the slope on the west side of the channel and help ease the maintenance burden. Additional rock was placed to armor the exposed slope at the end of the wall near the channel bottom to protect it from future erosion. Rock was also needed for Grade Control Structure # 1 to cover and protect an existing trench cap on a City water line. An additional 14 days was added onto the contract time to allow for this work. This CO/QA No. 1 in the amount of $48,818.11 will change the original contract amount from $587,087.80 to a total of $635,905.91. No. of Originals Submitted: 2 Project Name: Onion Branch Bank Stabilization Cost: $48,818.11 Source of Funds: General Self -Financed Construction Source of Funds (if applicable): Select Source Fund Account Number: DR020NI Finance Director Approval: LO for C. Delaney Department Director Approval: Michael Thane Date: 12-05-12 Date: 12/3/2012 CIP I7 I Budget n Purchasing n n Accounting n N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 Contract Quantity Adjustment/Change Order ROUND ROCK. TEXAS Department: Utilities & Environmental Services Project Name: Onion Branch Bank Stabilization City Project ID Number: DRO2ONI Justification Date: Change Order/Quantity Adjustment No. 11/26/2012 1 75 feet of MSE Wall was added to lessen the severity of channel slope, which in turn necessitated additional sod. Additional rock was needed on Grade Control structure #1 to protect an existing concrete trench cap on an existing 12" waterline. After a rain event during construction, it was determined that extra erosion control measurees were needed to limit construction site run-off. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Orginial and Adjusted Contract Prices: Orginial Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adju./Change Order: New Contract Time: Prepared Contractor: City Project Manager: Sig :t ir /, r.. Amount $587,087.80 $0.00 $42,625.42 $42,625.42 $629,713.22 $0.00 $6,192.69 $6,192.69 $635,905.91 $48,818.11 14 Calendar Days Submitted for Approval • inted Name, Title, Company Mark • r . - - - • - D/o Change 0 1.05% 1.05% 11 -a?7'/1 Date 11 3oi-. ignat re • otayer/Ci Manager: Signature Printed Name, Title, Company Date LC444G2. La( enit6eilif Print-. Name, Title, Company Signature Project Name: Quan. Adj./Change Order No.: y�M - i2 -l2 -ZS$ Printe o wood CA* DP r•, 0 11'x?- 1 L. Date fed 0212 - Name, Title, Company Date Change Order Data Item# Item Description Unit QtY Unit Price Amount Contract Time Adjustment (Days) Silt Fence LF 575 $2.00 $1,150.00 MSE Wall re- work $3,070.14 Rock Rip Rap $1,972.55 TOTALS: $6,192.69 Quantity Adjustment Data Bid Item # Item Description Unit Qty Unit Price Amount Contract Time Adjustment (Days) 4 Item SP639 Rock Berm, Severe Service LF 78 $35.00 $2,730.00 15 Item SS698-A. Grade Control Structure No. 1 CY 13.33 $74.00 $986.42 21 Item SS695-C. West Bank MSE Wall SF 750 $41.50 $31,125.00 14 Calendar Days 22 item SPb02-A. "Eco" Hybrid Buffalo Grass, Block Sodding SY 973 $8.00 $7,784.00 TOTALS: $42,625.42 14 Calendar Days