CM-13-02-029ROUND ROCK, TEXAS PURPOSE PASSION. PROSPERITY 0,14- (3-02-o Zq RECEIVED JAN 3 0 2013 City Manager Approval Form Consider executing Quantity Adjustment/Change Order No. 1 with Santa Clara Construction, Ltd. for Item Caption: Rocking J Road and Harrell Parkway Water / Wastewater Extension Proiect. Approval Date: February 1, 2013 Department Name: Utilities and Environmental Services Department Project Manager: Eddie Zapata Assigned Attorney: Steve Sheets Item Summary: On May 14, 2009, City Council approved the involuntary annexation of property along Rocking J Road and Old Settlers Boulevard, adjacent to the Old Settlers Boulevard/Harrell Parkway intersection. When the City involuntarily annexes property, the City is then required to ensure that water and wastewater lines are extended to the property within two and half years of when the property was annexed. This project provided the extension of water and wastewater mains to the Rocking J Road area as well as the construction of a new wastewater main in order to provide service to six residential properties that are located along Old Settlers Boulevard, adjacent to the Old Settlers Boulevard/Harrell Parkway intersection. On June 28, 2012, Santa Clara Construction, Ltd. of Austin, Texas was awarded the construction contract for this project. Quantity Adjustment/Change Order No. 1 is needed to adjust bid item quantities and add two items that were not part of the original scope of services. These added items include the relocation of the irrigation system at the wastewater bore pit along Old Settlers Boulevard and an eight -inch water tie-in at the north end of Rocking J Road. This Quantity Adjustment No. 1 is a reduction in the amount of $8,650 and Change Order No. 1 is an addition in the amount of $10,466.91. This difference of $1,816.91 will be added on to the original contract amount of $373,779, resulting in a grand total of $375,595.91. No. of Originals Submitted: 2 Project Name: Rocking J Road and Harrell Parkway Water / Wastewater Extension Cost: $1,816.91 Source of Funds: Self -Financed Wastewater Construction Source of Funds (if applicable): Self -Financed Water Construction Account Number: WLO1ROCKJ & WW01HARREL Finance Director Approval: Cheryl Delaney Date: 1/30/13 Department Director Approval: Michael Thane Date: 1/28/2013 'Ei ct,00,. pct for. CIP r--] Budget N/A OK E N/A OK Purchasing E L1 N/A OK Accounting ► I N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 ROUND RS/001XAS Contract Quantity Adjustment/Change Order rev, 08/12 Department: Utilities and Environmental Services City Project ID Number WLO1ROCKJ & WW01HARREL Justification Page 1 of 3 Change Order/Quantity Adjustment No. 1 SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract lime: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared B Amount 0/0 Change $373,779.00 -$8,650.00 -$8,650.00 $365,129.00 $10,466.91 $10,466.91 0.00 0.03 0.03 $375,595.91 $1,816.91 210 210 Si • natur Contractor:S4 City Project Manager: Signature Eddie Zapata, Project Manager, City of Round Rock 1/23/13 Printed Name, Title, Company 16 to tirA6r0462. galls N6LR C iL=lC3 Printed Name, Title, Company Date Mescor/Ci Manager Signature Printed Nam , Title Date 4w. Oat �u'l ter7z Printed Name, Title / gate 124471*. tpxu rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: 1 Page 2 of 3 Item # CO #1 Item Description Relocate irrigation system at wastewater bore pit along Old Settlers Trail Unit LS Qty. 1 Unit Price $2,218.95 Amount $2,218.95 Contract Time Adjustment Da s CO #2 8" water tie-in at north end of Rocking 3 Road LS 1 $8,247.96 $8,247.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: 1 Page 3 of 3 Bid Item # Item Description P quantity Unit Aajustment Qty. Data Unit Price Amount Contract Time Adjustment , Base Bid A - #7 Ductile Iron Fittings Ton -0.05 $10,000.00 -$500.00 Base Bid A - #17 Stabilized Construction Entrance EA -1 $2,000.00 -$2,000.00 Base Bid A - #18 Silt Fence for Erosion Control LF -91 $2.00 -$182.00 Base Bid A - #21 Project Sign EA -1 $500.00 -$500.00 Base Bid A - #22 Barricades, Signs and Traffic Handling MO -2 $250.00 -$500.00 Base Bid B - #7 Protective Fencing, Type A, Chain Link LF -992 $4.00 -$3,968.00 Base Bid B - #13 Project Sign EA -1 $500.00 -$500.00 Base Bid B - #14 Barricades, Signs and Traffic Handling MO -2 $250.00 -$500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -$8,650.00 0 Rocking J Contract Reconciliation Deducts from Original Contract Line Items Base Bid A Item # Amount 7 DI Fittings (Reduce by 0.05 Tons @ $10,000.00/Ton) 17 Stabilized Construction Entrance (-1 @ $2,000.00/EA) 18 Silt Fence (-91 LF @ $2.00/LF) 21 Project Sign (-1 Ea @ $500.00/EA) 22 Traffic Control (-2 Months @ $250.00/Month) Base Bid B 7 Protective Fencing (-992 LF @ $4.00/LF) 13 Project Sign (-1 Ea @ $500.00/EA) 14 Traffic Control (-2 Months @ $250.00/Month) Total Deductions ($500.00) ($2,000.00) ($182.00) ($500.00) ($500.00) ($3,968.00) ($500.00) ($500.00) ($8,650.00) Additions to Contract 1 Relocate portion of irrigation system at bore pit & then return irrigation to original location after bore & associated work is complete. (See attached breakdown) $2,218.95 2 8" water tie-in at north end of Rocking J. $8,247.96 (See attached breakdown) Total Additions $10,466.91 Summary Total Deductions Total Additions ($8,650.00) $10,466.91 Difference $1,816.91 Submitted & Signed By: Bob Schmidt Santa Clara Construction, Ltd. V.2-3/.7 Date